You are on page 1of 3
‘BID SCHEDULE, = CONSTRUCTIONIMPROVEMENT AND REHABILITATION OF AT EME DIRECTORATE LDA | GRADE WORKS ALONG LAHORE ORANGE LINE METRO TRAIN ESTIMATED COST Rs 2.05,46,957/- © CORRIDOR (Insialltion of ghtning protection system at LOLATP EARNEST MONEY 2% OF ESTIMATED COST. . ul {or Buildings of Depot and stabiing yard). DESCRIPTION OF ITEMS. ov. UNIT. RATE QUOTED BY THE CONTRACTOR. Infigure (Rs) Inwords Rs) — Design, specification, supply, storage, transportation, installation, | testing & commissioning of the following items of work including all ‘material, labour, tools, accessories etc, (unless specificaly stated otherwise) required up to completion of work 2s por approval as directed by the Engineer incharge. DAT CONTROLER® PLUS 60 -ESE Ar Terminal a : : i lgle ieee 70mm bear copper conductor 45.Mitr i i i i i fF i Conical roof conductor holder (empiy) 120-Nos Naval brass tape and cable square clamp 15:Nos tal. + TERS SE SESS SSS SRE i HEEIEIAEER ‘ALLITEMS ARE INCLUSIVE OF 17% GST AND CONTRACTOR PROFIT. CHIEF ENGINEER DIRECTOR (EME) CONTRACTOR L.D.A, LAHORE. L.D.A, LAHORE. ‘SUBJECT. CONSTRUCTIONIMPROVENENT AND REHABILITATION OF (CHIEF ENGINEER CELL (UD WING) LDA GRADE WORKS ALONG LAHORE ORANGE LINE METRO TRAIN ESTIMATED COST Rs.2.45,40,942/- ‘CORRIDOR (Instaaton of ightning protection system at LOLMTP EARNEST MONEY 2% OF ESTIMATED COST. 13, TIME LIMIT (03-MONTHS). 1 ‘avy. UNIT. RATE QUOTED BY THE CONTRACTOR. Tn figure (Rs) Inwords Rs) 13.Nos Each 3 Nos Each 13.Nos Each | 13Nos Each 1980-Mir PMir L 206-4ir P.M 7a-Nos Each 598-Nos Each Nos Each 105-Nos | Each 13.Nos Each 18.Nos. Each 13 Nos Each To.Nos Each 30-Nos- Each + 30Nos Each a f= + DESCRIPTIONS, TERMS AND CONDITIONS MENTIONED IN TENDER DOCUMENTS WILL BE APPLICABLE. ‘CHIEF ENGINEER DIRECTOR CONTRACTOR LDA, LAHORE. UDA LAHORE, BID SCHEDULE. SUBJECT:- _CONSTRUCTION/IMPROVEMENT AND REHABILITATION OF AT CHIEF ENGINEER CELL (UD WING) LOA (GRADE WORKS ALONG LAHORE ORANGE LINE METRO TRAIN ESTIMATED COST Rs.2.46 40,042 ‘CORRIDOR (Insialltion of ightning protecion system at LOLNITP EARNEST MONEY 2% OF ESTIMATED COST. {for_13 staions from Dera Guijran to Anarkal TIME LIMIT (03. MONTHS). ‘SNO__| DESCRIPTION OF ITEMS. OW. [Unt FATE QUGTED BY THE CONTRACTOR, Tnfigure Rs) In words Rs) 0196" x0m galvanized steel mast (9 sect) SE BRE BERBER REE ARE i i 7 C ‘Ald: 5% PST on Re. ‘ALL TENS ARE INCLUSIVE OF ALL APPLICABLE TAXES, SECURITIES. ALL DESCRIPTIONS, TERMS AND CONDITIONS MENTIONED IN TENDER DOCUMENTS WILL BE APPLICABLE. CHIEF ENGINEER DIRECTOR (EME) CONTRACTOR LDA, LAHORE. LDA, LAHORE.

You might also like