Tlocrt Temelja I Podne Ploče
Tlocrt Temelja I Podne Ploče
42,55
9,06 33,49
36 36
36
36 36
72
E E
16
1,84
1,84
1,12
1,12
1,84
1,32
36 36
72
72
D D
4,34
4,34
4,34
3,98
C m C
2c
12,62
t e 2
Pla
ase
of B
m
ess
2c
10,38
15,72
kn
15,82
hi c
e2
T
lat
eP
as
12,54
B
5,035
of
ss
ne
6,40
ick
6,84
6,84
Th
1,805
44 40
48 40
B B
16 4
48
1,72
2,08
2,08
1,48
1,90
2,00
36 36
72
A A
26
26
36
36 36 20 20 24 48
5,65 3,41 4,65 7,00 7,00 7,00 7,00
36 48
9,78 3,69 1,20 5,80 1,20 5,80 1,20 5,80 1,20 6,16 72
9,78 32,77
1 2 3 4 5 6 7 8
Key:
Reinforced Concrete
Lean Concrete
Precast Concrete Component
Building Edges
Building Edges, Slab / Baseplate
Slab Openings
Ground Elevation
View A Top Edge of Concrete
1:50
Heigth ± 0,00 = 400,00 m a.s.l.
New Building
Existing Building N
Construction Plot
50 22
Park Area
72
72
Tree
1,20
72
Name Date
Company -
drawn: Jörg Messing 2021-05-28
Project -
checked: Daniel Goeth 2021-07-09
Foundation and Base Plate Copyright of this drawing and
Subject associated documents are property of
PERI. They may not be reproduced or
made available to third persons,
2021-07-23