Professional Documents
Culture Documents
42,07
9,06 33,01
24 12 2,01 2,40 945 38 90 60 90 27 12 4,33 20 20 2,10 2,40 2,10 20 20 2,10 2,40 2,10 20 20 2,10 2,40 2,10 2020 2,10 2,40 2,30 24 24
90 90 90 90 90 90 90
12 175 24 12
12 24
12 24
12
12
24
E E
Cill height 120 cm from Cill height 120 cm Cill height 120 cm Cill height 120 cm
unfinished floor from unfinished floor from unfinished floor from unfinished floor
1,84
1,36
1,60
1,60
1,72
12 24
12
24
24
D D
Cill height 120 cm Cill height 120 cm Cill height 120 cm
5,08
from unfinished floor from unfinished from unfinished
floor floor
1,60
1,60
2,70
3,12
3,00
from unfinished floor
Cill height 120 cm
2,00
2,00
90
90
1,40
2,60
2,60
2,60
1,10
2,60
1,10
1,10
62
1,32
12
C C
1,50
9,015
88
1,85
15,24
15,34
0 cm
=3
from unfinished floor
ess
Cill height 120 cm
kn
ic
Th
2,40
2,40
90
90
b
13,50
Sla
4,32
1,40
2,60
cm
6,76
6,76
6,64
30
s=
1,665
es
kn
1,92
1,92
hic
bT
Sla
from unfinished floor
Cill height 120 cm
1,64
2,00
3,29
90
20 20
40
40
B B
36
2,185
1,88
1,90
1,60
1,60
2,00
A A
12
2
24
12 12 4 20 24
2,01 2,40 1,12 2,40 81 4,09 6,60 6,60 6,60 6,56
90 2,40 20 20
12 20 20 20 20 20 20 20
24 12 8 4 24
9,06 4,13 6,60 6,60 6,60 6,60
24 20 40 40 40 40 20 24
9,30 32,77
42,07
1 2 3 4 5 6 7 8
Key:
Reinforced Concrete
Lean Concrete
Precast Concrete Component
Building Edges
Building Edges, Slab / Baseplate
Slab Openings
Ground Elevation
Top Edge of Concrete
Heigth ± 0,00 = 400,00 m a.s.l.
New Building
Existing Building N
Construction Plot
Park Area
Tree
Name Date
Company -
57-0008161-B004_0.dwg First Floor with Slab