Professional Documents
Culture Documents
SRP FENCE A2
SRP FENCE A2
1
4.00 2"Ø PVC PIPE
4"Ø PVC PIPE 4"Ø G.I PIPE POST (SCHD. 40) D.E.P.W.
SEE JOINT DETAIL "A"
OFFICE OF THE BUILDING OFFICIAL
TO OTHER TO OTHER 2"Ø G.I PIPE FENCE FRAMING CITY OF CEBU
POST POST
0.50
1 1
2"X2" SQUARE BAR (WELDED) RECOMMENDING APPROVAL:
1
2"Ø PVC TEE
INTERLINK WIRE/STEEL MATTING (2X2 EYE)
HEAD: DATE:
1.60
1.80
0.20
0.20
SCALE: 1:20 METERS
0.20
TE GA
ANCE
ENTR
TOTAL AREA= 3,088,262 SQ. M.
EXIT GATE
147.51
4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.10 10.00 4.10 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 5.01
1.80
FICI FICI
1.80
FICI FICI
RIGHT-SIDE ELEVATION SEE GATE DETAIL LEFT-SIDE ELEVATION SCALE: 1:400 METERS
FROM THE OFFICE OF: PREPARED: CHECKED: RECOMMENDING APPROVAL: PROJECT TITLE: SOURCE OF FUND: APPROVED AS TO PLANS: APPROVED: SHEET NO.
2
E
O F F IC
IN
Y B
OF CE 3RD FLR. YUTIVO BLDG. JAKOSALEM ST. CEBU CITY ENGINEERING ASSISTANT, DEPW ARCHITECT I , DEPW ARCHITECT IV - HEAD, PLANNING & DESIGN DIVISION LOCATION: DGS, SRP PARKING AREA, CEBU CITY CITY ENGINEER, DEPW CITY MAYOR