TBL12 TBL13 TBL14 TBL15 TBL16 TBL17 TBL18 TBL19 TBL20 TBL21 TBL22 TB1 TBP
1. The Drawing is inner wiring for left side retractables
Installed right side of panel in No.6 Contactors Panel. Total 22 sets.
L10R L15R
2. Log "*" is indicated No. sootblower, as following:
L4R L8R L20R
*14
*10
L12 L13 L14 L15 L16 L17 L18 L19 L20 L21 L22
*13
L4RET L8RET L10RET L15RET L20RET RCT
C6
COM
A6-1
B6
*15
RL
*11
*9
L4EXT L4OL L8EXT L8OL L10EXT L10OL L15EXT L15OL L20EXT L20OL
1PR For example: L1 retractable, * = L1
L3R L7R L9R L14R L19R
K2 TBL1- ,L1EXT,L1RET,L1OL,L1R
L3R1 L7R1 L9R1 L14R1 L19R1
K1
L3RET L7RET L9RET L14RET L19RET
L3EXT L3OL L7EXT L7OL L9EXT L9OL L14EXT L14OL L19EXT L19OL 1 3 5 11 53 63 1 3 5 11 53 63 4 1
13 23 33 51 61 71
L6R BOTTOM A1 A1 8 5
A1 R1
C
L2R L12R L13R L18R L22R
COM
RL/6
TOP
L/6
A6
B6
C6
N
L/6
L6R1 L13R1 L22R1
Notes: L2R1 L12R1 L18R1
*RET
*EXT
A6-1
*R1
A6
*R
L6RET L22RET A2
LCT LCT+ TB1-9 1. The Drawing is control schematic for left side retractables L2RET L12RET L13RET L18RET
A2 A2 14 24 34 52 62 72
APH SOOT BLOWER
+
Motors Current (Left Side Retractables) 12 9 1 2 3 4
LCT- 4-20mA
- in No.6 Contactors Panel. Total 25 sets. L2EXT L2OL L6EXT L6OL L12EXT L12OL L13EXT L13OL L18EXT L18OL L22EXT L22OL 2 4 6 12 54 64 2 4 6 12 54 64 1 3 5 1 L1 L2 L3 13 23 33 51 61 71
TB1-10 14 13 220VAC AC 1A
2. Log "*" is indicated No. sootblower, as following: Notes: A1
L1R L5R L11R L16R L17R L21R
1PR
K1
A6-1
K2
L1 L2 L3 L4 L5 L6 L7 L8 L9 L10
RL
A6 A3 1. The Drawing is control schematic for air heater cleaner RCT RCT+ TB1-9 Notes: L1R1 L5R1 L11R1 L16R1 L17R1 L21L1 LCT
A2
+
B6 B3 4-20mA Motors Current (Right Side Retractables)
L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 in No.3 Contactors Panel. Total 4 sets. RCT- 2 4 6 2 11 12
*16
*13
- 1. The Drawing is control schematic for right side retractables L21RET (4-20)MA 14 24 34 52 62 72
N/6
TB1-10
L1RET L5RET L11RET L16RET L17RET
*10
C6 C3 2. Log "*" is indicated No. sootblower, as following: 5 6
L21 L22 in No.5 Contactors Panel. Total 22 sets.
L/6 L/3 A5-1 L1EXT L1OL L11EXT L11OL L16EXT L16OL L17EXT L17OL L21EXT L21OL
*18
L5EXT L5OL
For example: L1 retractable, * = L1 AH1 AH2 AH3 AH4 A5 2. Log "*" is indicated No. sootblower, as following:
*14
*7
*11
LO/3
*17
Remote Control LO/6 Remote Control
For example: AH1 AHC, * = AH1 B5
TBL1- ,L1EXT,L1RET,L1OL,L1R
REVERSE R1 R2 R3 R4 R5 R6 R7 R8 R9 R10
Local Control AU/3 LIMIT SWITCH Installed left side of panel
RL61
Local Control AU/6
AU/6
LO/6
PL61
COM
TBAH1- ,AH1EXH,AH1REH,AH1OL,AH1R C5
N
(FRONT SIDE)
R11 R12 R13 R14 R15 R16 R17 R18 R19 R20
L/6
TBL11
A6
REVERSE
B6
C6
NO CONTACT TBL1 TBL2 TBL3 TBL4 TBL5 TBL6 TBL7 TBL8 TBL9 TBL10
P.B. L/5
REV
6
RLS
13
13
R21 R22
LCT+
LCT-
6
STOP LIMIT Remote Control LO/5
10
For example: R1 retractable, * = R1
From DCS
SLS
9
SWITCH
SLS
START
From DCS
Start
Local Control AU/5
From DCS
Start
Retract
P.B. (BACK SIDE)
TBR1- ,R1EXT,R1RET,R1OL,R1R
ST
NC CONTACT
63
53
97
5
10
7
*13 7
6
13
12
11
From DCS
1 3 5 95 97
Retract
*RET
*EXT
*OL
9 *R
14
12
64
54
98
ST
*R1
*OL
SLS
*R
*E
*7
From DCS
*EXT
Start
11
15
16
17
18
20
63
53
97
5
*OL
10
*13 7
AR2
14
From DCS
Notes:
4 *7
Retract
Notes:
15
17
18
19
20
*RET
*EXT
*OL
9 *R
*16
COM
12
64
54
98
*16
*17
*18
*19
ST
1. The Drawing is terminal blocks for left side retractables 1. The Drawing is terminal blocks for right side retractables
*EXT
*8
REVERSE
RLS
COM
*17
*19
*21
*20
11
in No.6 Contactors Panel. Total 22 sets. in No.5 Contactors Panel. Total 22 sets.
L.S.
2 4 6 96 98
15
16
17
18
20
5
LC1-D0901,240VAC 44
14
L1RET-L22RET
*8
Contactor R1EXT-R22EXT
4 *7
2. Log "*" is indicated No. sootblower, as following: 2. Log "*" is indicated No. sootblower, as following:
8
LA1-DN20C 44
COM
*16
*17
*18
*19
*R
L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 R1 R2 R3 R4 R5 R6 R7 R8 R9 R10 REV Thermal Relay LR2-D1308C 22 L1OL-L22OL
*R2
REV
*1
*3
*5
RLS
*1
*3
*5
P.B.
Blower 22 L1R-L22R
N/6
KKS Code KKS Code Relay MY2NJ,240VAC+PYF08B
*19
Notes: Blower KKS Code KKS Code L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 TB* R11 R12 R13 R14 R15 R16 R17 R18 R19 R20
*2
No.
*4
*6
TB* For Unit 1 For Unit 2
*13
*9
No. For Unit 1 For Unit 2
*8
Relay MA306A,240VAC 23 L1R1-L22 RL
5
R21 R22
*9
L21 L22
8
Retracting
TBR1 R1
Operating
Extending
1. The Drawing is terminal blocks for left side wallblowers
Overload
Relay
Retracting
TBL1 L1 1 1PR
Extending
Operating
COM
Overload
K8AB-PH1
For example: R1 retractable, * = R1
COM
For example: L1 retractable, * = L1
REV
8
in No.4 Contactors Panel. Total 20 sets.
*1
*3
*5
TBR2 R2 Breaker C65H 3P,15A 1 K1
*10
Blower
*10
TB* KKS Code KKS Code TBL2 L2
TBL1- ,L1EXT,L1RET,L1OL,L1R TBR1- ,R1EXT,R1RET,R1OL,R1R
No. For Unit 1 For Unit 2 2. Log "*" is indicated No. sootblower, as following: Breaker C65H 1P,10A 짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾
9
1 K2
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾
LYDE
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾
*RET
*EXT
TBR3 R3
*R
*E
LYDE ERGEMANN
TBL3 L3 LYDE
*9
*2
*4
*6
TBA16 A16
TO DCS Shanghai Clyde Bergemann Machinery Company, Ltd.
Retracting
ERGEMANN
Extending
Terminal Blocks
Operating
ERGEMANN
*2
*4
*6
TBL1-TBL22 TB1
Overload
UK5N 450
TO DCS Shanghai Clyde Bergemann Machinery Company, Ltd. Shanghai Clyde Bergemann Machinery Company, Ltd.
*14
*15
COM
*11
TBR4 R4
*11
*14
*15
A16 A17 A18 A19 A20 TBL4 L4 Draw. Name Project
Terminal Blocks UK10N 10 TBP Draw. Name Project Draw. Name Project
TBA17 A17 REV. DATE DESCRIPTION PRPD. CHKD APPRD RAGHUNATHPUR THERMAL POWER
RAGHUNATHPUR THERMAL POWER
*10
B16 B17 B18 B19 B20 TBR5 R5 LCT REV. DATE DESCRIPTION PRPD. CHKD APPRD RAGHUNATHPUR THERMAL POWER REV. DATE DESCRIPTION PRPD. CHKD APPRD
Inner wiring of 2X600MW PROJECT
Xin Yueqi
1
1
1
3
2
3
TBL5 L5 Current UFPA-A2-P2-F1-03,5A/4-20MA Design
*T2 *T1 *R1 Inner wiring of 2X600MW PROJECT
*EXT *RET *R *R1 *E *R *R2
Xin Yueqi 2X600MW PROJECT Xin Yueqi
*RET
*EXT
TBA18 A18 Design Layout of No.6 Contactor Panel Design
No.6 Contactor Panel
C16 C17 C18 C19 C20 TBR6 R6 Transmitter
Xin Yueqi No.6 Contactor Panel Drawing Xin Yueqi System
TO DCS Xin Yueqi
*2
*4
*6
TBL6 L6 ON/OFF ON Drawing System Drawing System
TBA19 A19 Check Contactors Panel for Sootblowers System
*11
*14
*15
DELAY
D16 D17 D18 D19 D20 DELAY Contactors Panel for Sootblowers System
*12
Check Contactors Panel for Sootblowers System Check
TBR7 R7 TIMER Standard File Name
*12
TBA20 A20
TBL7 L7
M M TIMER
Standard File Name Standard File Name
1
SC08136KZ-06-03
3
TBR8 R8 *EXT *RET *R *R1 SC08136KZ-06-03
Approval Sheet/Total 2/2 Draw.No.: REV. 0
*OL
SC08136KZ-06-01 1/2
*OL
TBL8 L8 Approval Sheet/Total 1/1 Draw.No.: REV. 0 Approval Sheet/Total Draw.No.: REV. 0
TBB16 B16 For example: A16 wallblower, * = A16
AU/5
COM
LO/5
*19
96
*13
*15
*16
*17
*18
L/5
TBR9 R9
*2
*4
*6
*7
*8
*9
TBL9 L9
TBB17 B17
*12
TBR10 R10 M
AU/6
COM
LO/6
*19
TBL10 L10
*13
*15
*16
*17
*18
L/6
*2
*4
*6
*7
*8
*9
*OL
TBB18 B18
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
TB*
TBR11 R11
TBL11 L11
96
TBB19 B19
TBR12 R12 N/6 N/3
AU/4
COM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
*11
LO/4
*17
*19
TBL12 L12
*13
*14
*15
*16
*18
TB*
Extend Retract
L/4
Operating Retaact
*7
Extend
Air Heater Cleaner Oper. Time
*2
*4
*6
Retract
TBB20 B20 Extend Retract Operating Remote
Retractables (left side)
Retracting
COM1
U V W 1 2 5 6 9 10 1112
Start
Control
Extending
Operating
(Extend time T1) time
COM
TBR13 R13
Overload
Retract
TBL13 L13 (Blowing time T2) (1 step)
TBC16 C16
(L1---L22) (AH1,AH2,AH3,AH4)
Retract
TBR14 R14
Retracting
COM1
1 2 3 4 5 6 7 8 9 10 1112 13 14 15 16 17 18 19 20 U V W 1 2 5 6 9 10 11 12
Start
TB*
Extending
Operating
TBL14 L14
COM
Overload
TBC17 C17 N/6
TBR15 R15 Retract Operating
TBC18 C18
TBL15 L15 Retractables (right side) Extend Remote
Retract
Retract
Retracting
Operating
Extending
COM1
Start
U V W 3 4 5 6 9 10 TBR16 R16
Overload
COM
Rotary
TBL16 L16
(R1---R22)
TBC19 C19
TBR17 R17
LYDE
ERGEMANN
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾
TBL17 L17 Shanghai Clyde Bergemann Machinery Company, Ltd.
TBC20 C20 Notes:
Retractable
Retractable
TBR18 R18 Draw. Name Project
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾
To DCS
TBL18 L18 LYDE TBR12 TBR13 TBR14 TBR15 TBR16 TBR17 TBR18 TBR19 TBR20 TBR21 TBR22 TB1 TBP
TBD16 D16 14 REV. DATE DESCRIPTION PRPD. CHKD APPRD RAGHUNATHPUR THERMAL POWER ERGEMANN 1. The Drawing is inner wiring for right side retractables
Terminal Blocks of Contactors Panel Shanghai Clyde Bergemann Machinery Company, Ltd.
From DCS
TBR19 R19 2X600MW PROJECT
TBL19 L19 Design Xin Yueqi Control Schematic of Sootblowers
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾
Retractable
Retractable
LYDE
Installed right side of panel in No.5 Contactors Panel. Total 25 sets.
To DCS
TBD17 D17 Draw. Name Project
TBR20 R20 Drawing Xin Yueqi System 14 REV. DATE DESCRIPTION PRPD. CHKD APPRD RAGHUNATHPUR THERMAL POWER
ERGEMANN
Shanghai Clyde Bergemann Machinery Company, Ltd. R8R R12R R15R 2. Log "*" is indicated No. sootblower, as following:
TBL20 L20
From DCS
Terminal Blocks of Contactors Panel R4R R20R
Check Contactors Panel for Sootblowers System 2X600MW PROJECT
TBD18 D18
Xin Yueqi
Wallblower
Wallblower
Standard R4R1
TBL21 L21 Drawing Xin Yueqi System 14 REV. DATE DESCRIPTION PRPD. CHKD APPRD RAGHUNATHPUR THERMAL POWER R20R1
*14
TBD19 D19 SC08136KZ-00-02 RL
Approval Sheet/Total 11/13 Draw.No.: REV. 0 Terminal Blocks of Contactors Panel Xin Yueqi Control Schematic of Sootblowers 2X600MW PROJECT
*10
Design R12RET R12 R13 R14 R15 R16 R17 R18 R19 R20 R21 R22
*13
TBR22 R22 Check Contactors Panel for Sootblowers System R4RET R8RET R15RET R20RET
TBD20 D20
TBL22 L22 File Name Drawing Xin Yueqi System 1PR
C5
COM
Standard
A5-1
B5
Contactors Panel for Sootblowers System R12EXT
*15
SC08136KZ-00-02 Check R8EXT R12OL
Approval Sheet/Total 12/13 Draw.No.: REV. 0 R4EXT R4OL R8OL R15EXT R15OL R20EXT R20OL K2
*11
*9
Standard File Name
R3R R7R R11R R14R For example: R1 retractable, * = R1
SC08136KZ-00-02 R19R K1
Approval Sheet/Total 10/13 Draw.No.: REV. 0
R3R1 R7R1 R11R1 R14R1 R19R1 TBR1- ,R1EXT,R1RET,R1OL,R1R
R7RET R11RET R14RET
R3RET R19RET
R22R
R11EXT R11OL
R3EXT R3OL R7EXT R7OL R14EXT R14OL R19EXT R19OL
R22R1
1 3 5 11 53 63 1 3 5 11 53 63 4 1
13 23 33 51 61 71
R6R R10R R13R 8 5
R2R R18R A1 A1 A1
COM
RL/5
A
L/5
R22RET
Notes:
A5
B5
C5
R6R1
N
R2R1 R10R1 R13R1
L/5
R18R1
*RET
*EXT
A5-1
A
*R1
A
A5
*R
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾
WLCT+ TB1-8
1. The Drawing is control schematic for right side wallblowers R6RET R22EXT R22OL
+
LYDE
CT Motors Current (Left Side Wallblowers) R2RET R10RET R13RET R18RET A2
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾 짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾
4-20mA
A2 A2
ERGEMANN WLCT-
Shanghai Clyde Bergemann Machinery Company, Ltd. LYDE LYDE
B - in No.2 Contactors Panel. Total 20 sets. 14 24 34 52 62 72
ERGEMANN
Shanghai Clyde Bergemann Machinery Company, Ltd.
ERGEMANN
Shanghai Clyde Bergemann Machinery Company, Ltd. B TB1-9
R6EXT R6OL R10EXT R10OL
R21R 12 9 1 2 3 4
Draw. Name Project
RAGHUNATHPUR THERMAL POWER 2. Log "*" is indicated No. sootblower, as following:
R2EXT R2OL R13EXT R13OL R18EXT R18OL
R21R1 2 4 6 12 54 64 2 4 6 12 54 64 1 3 5 1 L1 L2 L3 13 23 33 51 61 71
REV. DATE DESCRIPTION PRPD. CHKD APPRD Draw. Name Project Draw. Name Project A2-1 14 13 220VAC AC 1A
Wiring Drawing of Terminal Blocks 2X600MW PROJECT C C A2 R5R R9R A1
Design Xin Yueqi for No.4 Contactor Panel
REV. DATE DESCRIPTION PRPD. CHKD APPRD
Wiring Drawing of Terminal Blocks
RAGHUNATHPUR THERMAL POWER REV. DATE DESCRIPTION PRPD. CHKD APPRD
Wiring Drawing of Terminal Blocks
RAGHUNATHPUR THERMAL POWER A6 A7 A8 A9 A10
R1R R16R R17R
R21RET
1PR
2X600MW PROJECT 2X600MW PROJECT
K1
Xin Yueqi Xin Yueqi Xin Yueqi B2 R5R1
K2
R1R1 R9R1 R16R1
RL
Drawing System Design Design R17R1 RCT
for No.6 Contactor Panel for No.5 Contactor Panel B6 B7 B8 B9 B10
Check Contactors Panel for Sootblowers System Drawing Xin Yueqi System Drawing Xin Yueqi System L L C2 쮵쏷 Notes R21EXT R21OL
A2
럀뮤뗈벶: IP54 R1RET R5RET R16RET 2 4 6 2 11 12
*16
R9RET
*13
File Name Protect Level: IP54 R17RET (4-20)MA 14 24 34 52 62 72
N/6
Standard Check Contactors Panel for Sootblowers System Check Contactors Panel for Sootblowers System L/2 C6 C7 C8 C9 C10 맱쳥닄쇏: 샤퓺룖냥
*10
Panel Material: Steel
Approval Sheet/Total 1/2 Draw.No.: SC08136KZ-04-02 REV. 0 Standard File Name Standard File Name N N 룖냥뫱뛈: 맱쳥 1.5mm Steel Thickness: Panel 1.5mm R1EXT R1OL R5EXT R5OL R9EXT R16EXT R16OL
5 6
SC08136KZ-06-02 SC08136KZ-05-02 D6 D7 D8 D9 D10 맱쏅 2mm Door 2.0mm
R9OL R17EXT R17OL
*18
Approval Sheet/Total 1/2 Draw.No.: REV. 0 Approval Sheet/Total 1/2 Draw.No.: REV. 0 낲ힰ냥 2.5mm
*14
*7
Remote Control LO/2 Install board 2.5mm
*11
뇭쏦뒦샭: 낲ힰ냥, 맱쳥뫍쏅쇗뮯뒦샭뫍엧춿
*17
Local Control AU/2 For example: A6 wallblower, * = A6 뾪쏅랽쪽: 잰뾪쏅 Door: Front Mode
Installed left side of panel
G
맱쳥퇕즫: Panel Color:
RL51
AU/5
LO/5
PL51
COM
N
쫽솿: 6첨
L/5
TBR11
A5
B5
C5
TBA6- ,A6EXT,A6RET,A6OL,A6R1,A6R2,A6R3 Quantity: 6 pcs TBR1 TBR2 TBR3 TBR4 TBR5 TBR6 TBR7 TBR8 TBR9 TBR10
13
RCT+
RCT-
No.5 Contactors panel No.6 Contactors panel STOP REV L.S.
From DCS
From DCS
Retract
RLS
SLS
Start
L.S. NO
KKS Code
NC CONTACT No. Controlled device UMIT 1/UNIT 2
CONTACT
*11 7
5
8
*R1
*RET
*R2
*EXT
*OL
Wall Blowers (A1-A5,B1-B5,C1-C5,D1-D5)
K2 K2
No.1 Contactors Panel 1 3 5 95 97
2200
2200
K1 K1
12
14
Valves (MV1-MV8) Power Distribute
ST
*EXT
*13
*14
*15
*16
*17
*19
*18
9
No.2 Contactors Panel Wall Blowers (A6-A10,B6-B10,C6-C10,D6-D10)
*OL
15
16
17
19
18
20
*7
Wall Blowers (A11-A15,B11-B15,C11-C15,D11-D15)
COM
COM
No.3 Contactors Panel
TB1-1
TB1-1
Air Heater Cleaner (AH1 AH2 AH3 AH4)
LC1-D0901,240VAC 44
2 4 6 96 98
Wall Blowers (A16-A20,B16-B20,C16-C20,D16-D20) R1RET-R22RET
TB1-9
TB1-9
No.4 Contactors Panel Contactor R1EXT-R22EXT
*1
*3
*5
FROM DCS
FROM DCS
No.5 Contactors Panel Retractables (R1-R22) Thermal Relay LR2-D1308C 22 R1OL-R22OL
Rotary Position
Retracting
22 R1R-R22R
Operating
Extending
N/5
MY2NJ,240VAC+PYF08B
Overload
Relay
*19
COM
*2
No.6 Contactors Panel Retractables (L1-L22)
*4
*6
*8
TB1-2
TB1-2
Relay MA306A,240VAC 23 R1R1-R22 RL
RL
RL
1PR 1PR Relay K8AB-PH1 1 1PR
RL/5
RL/6
Breaker C65H 3P,15A 1 K1
RL51
PL51
RL61
PL61
No.5 Panel Remote Control
*RET
No.5 Panel Local Control
*EXT
Breaker C65H 1P,10A 1 K2
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾
LYDE
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾
*2
*4
*6
LYDE LYDE ERGEMANN
Terminal Blocks ERGEMANN ERGEMANN Shanghai Clyde Bergemann Machinery Company, Ltd.
UK5N 450 TBR1-TBR22 TB1 Shanghai Clyde Bergemann Machinery Company, Ltd. Shanghai Clyde Bergemann Machinery Company, Ltd.
*9
TB1-6
TB1-5
TB1-6
TB1-5
Draw. Name Project
*12
Terminal Blocks UK10N 10 TBP Draw. Name Project Draw. Name Project
RAGHUNATHPUR THERMAL POWER
TO DCS RAGHUNATHPUR THERMAL POWER
REV. DATE DESCRIPTION PRPD. CHKD APPRD
3
RAGHUNATHPUR THERMAL POWER REV. DATE DESCRIPTION PRPD. CHKD APPRD
RCT-
REV. DATE DESCRIPTION PRPD. CHKD APPRD
Xin Yueqi Inner wiring of
RCT+
RCT 2X600MW PROJECT
COM
*R3 1
PL51
RL51
*EXT *RET *R1 *R2
RL/5
Current UFPA-A2-P2-F1-03,5A/4-20MA Design
Xin Yueqi Inner wiring of 2X600MW PROJECT
L/5
Xin Yueqi 2X600MW PROJECT
N
B
C
Design
L
Design Layout of No.5 Contactor Panel No.5 Contactor Panel
A5
A6
Xin Yueqi
B5
C5
B6
C6
Transmitter
WRCT-
Drawing
100
WRCT+
LCT-
RL/4
COM
PL61
RL61
LCT+
Drawing
L/4
RL/6
Drawing System System
L/6
Contactors Panel for Sootblowers System
N
B
C
Check
L
615VAC 415VAC
Check
B
C
*10
Contactors Panel for Sootblowers System
L
Check
M File Name
TB1
M/5
M/6
Standard
A/5
A/6
1 2 3 4 5 6 7 8 9 10 11 12 13 14
L/5
L/6
2/2 SC08136KZ-05-03
TBP
0
*OL
1 2 3 4 5 6 7 8
Approval Sheet/Total Draw.No.: REV.
TB1
1 2 3 4 5 6 7 8 9 10 4-9x21 Approval Sheet/Total 1/1 Draw.No.: SC08136KZ-05-01 REV. 0 Approval Sheet/Total 1/2 Draw.No.: SC08136KZ-05-03 REV. 0
TB1
TBP
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14
TBP
220VAC 220VAC
1 2 3 4 5 6 7 8
Remote
Remote
Remote status
Remote status
Power Failure
of No.4 Panel
of No.4 Panel
COM
of No.5 Panel
of No.5 Panel
Power Failure
+
Remote
Remote
A B C L N
COM
-
A B C L N
Remote status
Power Failure
of No.6 Panel
of No.6 Panel
Remote
Remote A B C L N
COM
N/2
-
700
Operating Rotary
Wall blowers (right side) Extend Retract Retract
500
Position Control
575
(A6---A10)
400
(B6---B10)
To DCS
From DCS
(C6---C10)
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾 (D6---D10) 짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾
To DCS
LYDE LYDE
To DCS
From DCS
ERGEMANN ERGEMANN
Shanghai Clyde Bergemann Machinery Company, Ltd. Shanghai Clyde Bergemann Machinery Company, Ltd.
600 LYDE 짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾
To DCS
ERGEMANN
Draw. Name Project Draw. Name Project
From DCS
To DCS
Shanghai Clyde Bergemann Machinery Company, Ltd.
From No.1 Contactors panel
REV. DATE DESCRIPTION PRPD. CHKD APPRD RAGHUNATHPUR THERMAL POWER 14 REV. DATE DESCRIPTION PRPD. CHKD APPRD RAGHUNATHPUR THERMAL POWER
800
To DCS
Design Control Schematic of Sootblowers Design Control Schematic of Sootblowers RAGHUNATHPUR THERMAL POWER
REV. DATE DESCRIPTION PRPD. CHKD APPRD
Drawing Xin Yueqi System Drawing Xin Yueqi Xin Yueqi 2X600MW PROJECT
Notes:
TBC11 TBC12 TBC13 TBC14 TBC15 TBD11 TBD12 TBD13 TBD14 TBD15 TBAH1 TBAH2 TB1 TBP 1. The Drawing is inner wiring for rear side wallblowers
in No.3 Contactors Panel. Total 20 sets.
AIR PREHEATER SOOTBLOWER
2. Log "*" is indicated No. sootblower, as following:
B13R3
A14R3 C12R3 D11R3 D15R3
B13R2
A11 A12 A13 A14 A15
COM
A14R2 C12R2 D11R2 D15R2
*12
*8
B13R1
A14R1 C12R1 D11R1 D15R1 WBCT
B11 B12 B13 B14 B15
B13RET
A3-1
A14RET C12RET D11RET D15RET RL
C11 C12 C13 C14 C15
*11
C3
B3
*9
WFCT+ TB1-8
+
B13EXT B13OL 1PR
A14EXT A14OL C12EXT C12OL D11EXT D11OL D15EXT D15OL
CT 4-20mA Motors Current (Front Side Wallblowers)
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾 WFCT-
- D11 D12 D13 D14 D15
*14
A
COM
A
*15
LYDE
*9
*10
*8
DCS
*16
K2
*7
*13
TB1-9 AH4R2
A3
B12R3
B3
C3
ERGEMANN
Shanghai Clyde Bergemann Machinery Company, Ltd. LYDE 짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾 LYDE 짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾
A13R3 C11R3 C15R3 D14R3
AH4R1
Notes:
ERGEMANN ERGEMANN A13R2 B12R2 C11R2 C15R2 D14R2 K1
Draw. Name Project Shanghai Clyde Bergemann Machinery Company, Ltd. Shanghai Clyde Bergemann Machinery Company, Ltd. A1-1 B B B12R1
1. The Drawing is terminal blocks for air heater cleaner
71
A1 A13R1 C11R1 C15R1 D14R1 AH4T2
*16
REV. DATE DESCRIPTION PRPD. CHKD APPRD RAGHUNATHPUR THERMAL POWER Draw. Name Project Draw. Name Project AH2R2
Wiring Drawing of Terminal Blocks B1 A13RET B12RET C11RET C15RET D14RET AH4T1
Design Xin Yueqi 2X600MW PROJECT REV. DATE DESCRIPTION PRPD. CHKD APPRD RAGHUNATHPUR THERMAL POWER REV. DATE DESCRIPTION PRPD. CHKD APPRD RAGHUNATHPUR THERMAL POWER Notes: C C
AH2R1 in No.3 Contactors Panel. Total 4 sets.
COM
for No.4 Contactor Panel Wiring Drawing of Terminal Blocks Wiring Drawing of Terminal Blocks
*14
*15
*17
*17
Xin Yueqi Xin Yueqi 2X600MW PROJECT Xin Yueqi 2X600MW PROJECT
AU
AH4R 1 3 5 11 53 63 1 3 5 11 53 63 5 6 4 3 5 6 4 1
*7
B12EXT B12OL 13 23 33 51 61 71
Drawing System Design
for No.6 Contactor Panel
Design
for No.5 Contactor Panel
C1 A13EXT A13OL C11EXT C11OL C15EXT C15OL D14EXT D14OL AH2T2
1 3 5 11 53 63 1 3 5 11 53 63 4 1 4 1 4 1 2. Log "*" is indicated No. sootblower, as following:
Check Contactors Panel for Sootblowers System Drawing Xin Yueqi System Drawing Xin Yueqi System
1. The Drawing is control schematic for front side wallblowers B11R3 AH2T1
A1 A1 7 7 A1
8 5
C
L/1 A12R3 B15R3 C14R3 D13R3 AH4E AH4OL
AH1 AH2 AH3 AH4
COM
RL/3
Rotary Position
L/3
L
L L A1 A1 8 5 8 5 8 5
A3
B3
C3
*R1
N
File Name
*R
in No.1 Contactors Panel. Total 20 sets.
*E
Contactors Panel for Sootblowers System Contactors Panel for Sootblowers System B11R2
*R2
L/3
Standard Check Check A12R2 B15R2 C14R2 D13R2
AH2R AH3R2 A2 A2
A3-1
2 2 A2
For example: AH3 AHC, * = AH3
A3
File Name File Name A12R1 B11R1 B15R1 C14R1 D13R1
2/2 SC08136KZ-04-02 0 Standard Standard 12 9
*T1
Approval Draw.No.: REV.
Sheet/Total
2. Log "*" is indicated No. sootblower, as following:
*T2
AH3R1 2 4 6 12 54 64 2 4 6 12 54 64
*RET
*EXT
14 24 34 52 62 72
N N
*R1
LO/1 8 1 8
*R2
*R3
Remote Control 14 13
Retracting
2/2 SC08136KZ-06-02 0 2/2 SC08136KZ-05-02 0 B11RET AH2E AH2OL
Extending
Operating
Approval Draw.No.: REV. Approval Draw.No.: REV. A12RET B15RET C14RET D13RET
Sheet/Total Sheet/Total AH3T2
HBAH3- ,AH3EXH,AH3REH,AH3OL,AH3R
A1 A2 A3 A4 A5 A2 A2
Overload
AU/1
Retract
Local Control B11EXT B11OL
AH1R2
AH3T1 1 2 3 4
A12EXT A12OL B15EXT B15OL C14EXT C14OL D13EXT D13OL 12 9 12 9 12 9
AH1R1
2 4 6 12 54 64 2 4 6 12 54 64 1 3 5 1 13 23 33 51 61 71
*18
L1 L2 L3
Start
B1 B2 B3 B4 B5
*8
*9
*17
Contactors panel 220VAC AC 1A
COM
AH3R 14 13 14 13 14 13
*15
A11R3 A15R3 B14R3 C13R3 D12R3 AH1T2 A1
*20
13
*13
*19
*11
*14
6
*10
A11R2 A15R2 B14R2 C13R2 D12R2
C1 C2 C3 C4 C5
1PR
K1
AH1T1
K2
AH3E AH3OL
RL
A11R1 A15R1 B14R1 C13R1 D12R1 EXTEND TIME
BLOWING TIMER WBCT
12 13 14 15 16 17 18 19 20
RLS
SLS
From DCS
A2
From DCS
Retract
D1 D2 D3 D4 D5 No.3 Contactors panel No.4 Contactors panel
AH1R
Start
A11RET A15RET B14RET C13RET D12RET
TB*- 2 4 6 2 11 12
(4-20)MA 14 24 34 52 62 72
74
*11
AH1E AH1OL
*15
*16
*13
A11EXT A11OL A15EXT A15OL B14EXT B14OL C13EXT C13OL D12EXT D12OL
*14
8
5 6
*8
*RET
*R1
*R2
*EXT
*OL
1 2 3 6 8
*11
For example: A1 wallblower, * = A1 1 3 5 95 97
4 5 7 9
*12
12
14
ST
*EXT
TBA1- ,A1EXT,A1RET,A1OL,A1R1,A1R2,A1R3
*OL
*13
*14
*15
*16
*17
*19
*18
9
TBA11 TBA12 TBA13 TBA14 TBA15 TBB11 TBB12 TBB13 TBB14 TBB15 TBAH3 TBAH4
K1 K2 K1 K2
*19
*18
*11
*13
G
*7
*9
RL31
PL31
AU/3
LO/3
LO
COM
*2
*4
*6
*7
L
N
2 4 6 96 98
L/3
A3
B3
C3
15
16
17
19
18
20
*7
WBCT+
WBCT-
*21
*10
N/3
*2
*4
*6
COM
COM
1 3 5 95 97
TB1-1
TB1-1
Wiring box of wallblower
*1
*3
*5
TB1-9
TB1-9
No.3 Panel Remote Control
Retracting
*OL
Operating
Extending
Overload
FROM DCS
FROM DCS
COM
*8
TB1-2
TB1-2
Notes: Notes: U V W PE 1 2 3 4 5 6 7 8 9 10 2 4 6 96 98
RL
RL
1PR 1PR
1. The Drawing is terminal blocks for rear side wallblowers
RL/3
RL/4
*RET
*EXT
1. The Drawing is terminal blocks for front side wallblowers Thermal Relay LR2-D1308C 4 AH1OL-AH4OL
Notes:
*2
*4
*6
RL31
PL31
RL41
PL41
in No.3 Contactors Panel. Total 20 sets.
*9
2. Log "*" is indicated No. sootblower, as following: 1. The Drawing is terminal blocks for right side wallblowers LC1-D0901,230VAC 48
*12
2. Log "*" is indicated No. sootblower, as following: C11EXT-C15EXT C11RET-C15RET D11EXT-D15EXT D11RET-D15RET
N/3
in No.2 Contactors Panel. Total 20 sets. LA1-DN20C 48
*17
AH1EXT-AH4EXT AH1RET-AH4RET
*2
*4
*6
TB1-6
TB1-5
TB1-6
TB1-5
*EXT *RET *R1 *R2 *R3
2. Log "*" is indicated No. sootblower, as following: Thermal Relay LR2-D1306C 20 A11OL-A15OL B11OL-B15OL C11OL-C15OL D11OL-D15OL E11OL-E15OL
A11 A12 A13 A14 A15 Blower KKS Code KKS Code A1 A2 A3 A4 A5 B11R1/R2/R3-B15R1/R2/R3
TB* A11R1/R2/R3-A15R1/R2/R3 AH1R1/R2-AH4R1/R2
No. For Unit 1 For Unit 2 68 C11R1/R2/R3-C15R1/R2/R3 D11R1/R2/R3-D15R1/R2/R3
B11 B12 B13 B14 B15 A6 A7 A8 A9 A10 RJ2S-CJ-A220/SJ2S-05B
A3
A4
B3
C3
B4
C4
*10
B1 B2 B3 B4 B5
TBA6 A6 TB*
Blower
No.
KKS Code KKS Code M Relay
MA306A-33,230VAC 1 RL
C11 C12 C13 C14 C15 B6 B7 B8 B9 B10 For Unit 1 For Unit 2
415VAC 415VAC
*OL
K8AB-PH1 1 1PR
M/3
M/4
A/3
A/4
Blower D1 D2 D3 D4 D5
L/3
L/4
KKS Code KKS Code
N
TB* No. C65H 3P,15A 1 K1
For Unit 1 For Unit 2 TBA8 A8 Breaker
D6 D7 D8 D9 D10 TBA2 A2
TBA11 A11 For example: A11 wallblower, * = A11 TBA9 A9 220VAC 220VAC C65H 2P,15A 1 K2
LYDE 짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾 LYDE
ERGEMANN
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾 LYDE
ERGEMANN
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾 LYDE
ERGEMANN
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾
TBA3 A3 ERGEMANN Shanghai Clyde Bergemann Machinery Company, Ltd. Shanghai Clyde Bergemann Machinery Company, Ltd. Shanghai Clyde Bergemann Machinery Company, Ltd.
TBA12 A12 For example: A6 wallblower, * = A6 For example: A1 wallblower, * = A1 Shanghai Clyde Bergemann Machinery Company, Ltd.
TBA10 A10
TBA4 A4 N/1
M Terminal Blocks UK5N
UK6N
590
10
TBA11-TBA15,TBB11-TBB15,TBC11-TBC15,TBD11-TBD15,TB1 TBAH1-TBAH4
TBP
Draw. Name Project
REV. DATE DESCRIPTION PRPD. CHKD APPRD
Draw. Name Project
RAGHUNATHPUR THERMAL POWER REV. DATE DESCRIPTION PRPD. CHKD APPRD
Draw. Name Project
RAGHUNATHPUR THERMAL POWER REV. DATE DESCRIPTION PRPD. CHKD APPRD
Draw. Name Project
RAGHUNATHPUR THERMAL POWER
TBA13 A13 REV. DATE DESCRIPTION PRPD. CHKD APPRD RAGHUNATHPUR THERMAL POWER
Inner wiring of Inner wiring of 2X600MW PROJECT Inner wiring of 2X600MW PROJECT
TBB6 B6
TBA5 A5 Wall blowers (front side) Extend Retract Operating Rotary Retract Current UFPA-A2-P2-F1-03,5A/4-20MA 1 WBCT Design Xin Yueqi Layout of No.3 Contactor Panel 2X600MW PROJECT Design Xin Yueqi 2X600MW PROJECT Design Xin Yueqi Design Xin Yueqi
TBA14 A14
TBB7 B7
(A1---A5)
Position Control
ST Transmitter Drawing Xin Yueqi Drawing Xin Yueqi No.3 Contactor Panel System Drawing Xin Yueqi No.3 Contactor Panel System Drawing Xin Yueqi No.3 Contactor Panel System
RLS SLS
System
TBB1 B1 ST3PA,0-1M,230VAC AH1T1-AH4T1 Check Contactors Panel for Sootblowers System Check Contactors Panel for Sootblowers System Check Contactors Panel for Sootblowers System
TBA15 A15 Time Relay 4 Check Contactors Panel for Sootblowers System File Name File Name File Name
TBB8 B8 (B1---B5) 4 AH1T2-AH4T2 File Name Standard Standard Standard
AU/1
ST3PR,0-10S/10M,230VAC Standard
LO/1
COM
TBB2 B2
*11
*17
*19
L/1
*13
*14
*15
*16
*18
*7
SC08136KZ-03-03 SC08136KZ-03-03 SC08136KZ-03-03
*2
*4
*6
(C1---C5) Approval Sheet/Total 1/3 Draw.No.: REV. 0 Approval Sheet/Total 2/3 Draw.No.: REV. 0 Approval Sheet/Total 3/3 Draw.No.: REV. 0
AU/2
1/1
LO/2
0
*17
*19
*13
*14
*15
*16
*18
TBB9 B9
AU/3
*7
COM
*2
*4
*6
LO/3
*11
*17
*19
*13
*14
*15
*16
*18
L/3
*7
TBB3 B3
*2
*4
*6
TB*
LYDE
ERGEMANN
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
LYDE
TBB13 B13
TB*
Retract
Draw. Name
Retracting
Project Shanghai Clyde Bergemann Machinery Company, Ltd.
HISAR THERMAL POWER PROJECT
Operating
Terminal Blocks of Contactors Panel
COM1
U V W 3 4 5 6 9 10
Extending
TBC7 C7 TBC1 C1
Start
Overload
REV. DATE DESCRIPTION PRPD. CHKD APPRD
COM
NO
Rotary
RAGHUNATHPUR THERMAL POWER
Retract
Retracting
Operating
Extending
2X300 MW UNITS
COM1
U V W 3 4 5 6 9 10
Overload
Rotary
Design
COM1
Extending
NC
U V W 3 4 5 6 9 10
Start
Xin Yueqi
COM
Wallblower
Wallblower
TBC14 C14
From DCS
TBD7 D7 TBD1 D1
Wallblower
Wallblower
To DCS
From DCS
Wallblower
Wallblower
To DCS
From DCS
TBC15 C15
To DCS
TBD8 D8 TBD2 D2
TBD11 D11
TBD9 D9 TBD3 D3
TBD12 D12
TBD10 D10 TBD4 D4
TBD13 D13
TBD5 D5
TBD14 D14
TBD15 D15
Notes:
WALL BLOWER SCHEMATIC TBC16 TBC17 TBC18 TBC19 TBC20 TBD16 TBD17 TBD18 TBC19 TBC20 TB1 TBP
1. The Drawing is inner wiring for right side wallblowers
in No.4 Contactors Panel. Total 20 sets.
Notes: 2. Log "*" is indicated No. sootblower, as following:
A A
WBCT+ TB1-8
1. The Drawing is control schematic for rear side wallblowers A19R3 B18R3 C17R3 D16R3 D20R3
+
CT Motors Current (Rear Side Wallblowers) A16 A17 A18 A19 A20
DCS
WBCT- 4-20mA A19R2 B18R2 C17R2 D16R2 D20R2
-
COM
in No.3 Contactors Panel. Total 20 sets. B
*12
B
*8
TB1-9 A19R1 B18R1 C17R1 D16R1 D20R1
B16 B17 B18 B19 B20
2. Log "*" is indicated No. sootblower, as following:
짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾 짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾 짏몣뿋삳뗂놴뛻룱싼믺킵폐쿞릫쮾 A19RET B18RET C17RET D16RET D20RET
A4-1
LYDE LYDE LYDE
A3-1 C16 C17 C18 C19 C20
COM
C C
*11
C4
*16
*17
*19
*21
B4
*20
A3
*9
ERGEMANN ERGEMANN ERGEMANN
*7
AU
Shanghai Clyde Bergemann Machinery Company, Ltd. Shanghai Clyde Bergemann Machinery Company, Ltd. Shanghai Clyde Bergemann Machinery Company, Ltd. A11 A12 A13 A14 A15 A19EXT A19OL B18EXT B18OL C17EXT C17OL D16EXT D16OL D20EXT D20OL
Draw. Name Project Draw. Name Project Draw. Name Project B3 D16 D17 D18 D19 D20
A18R3 B17R3 C16R3 C20R3 D19R3
REV. DATE DESCRIPTION PRPD. CHKD APPRD RAGHUNATHPUR THERMAL POWER REV. DATE DESCRIPTION PRPD. CHKD APPRD RAGHUNATHPUR THERMAL POWER REV. DATE DESCRIPTION PRPD. CHKD APPRD RAGHUNATHPUR THERMAL POWER C3 B11 B12 B13 B14 B15 L L
Wiring Drawing of Terminal Blocks Wiring Drawing of Terminal Blocks Wiring Drawing of Terminal Blocks A18R2 B17R2 C16R2 C20R2 D19R2
Design Xin Yueqi for No.3 Contactor Panel
2X600MW PROJECT Design Xin Yueqi for No.2 Contactor Panel
2X600MW PROJECT Design Xin Yueqi for No.1 Contactor Panel
2X600MW PROJECT
C11 C12 C13 C14 C15 A18R1 B17R1 C16R1 C20R1 D19R1
Retracting
L/3
Xin Yueqi Xin Yueqi Xin Yueqi N N
Extending
Operating
Drawing System Drawing System Drawing System CONNECTED TO
Overload
A18RET B17RET C16RET C20RET D19RET
Retract
Check Contactors Panel for Sootblowers System Check Contactors Panel for Sootblowers System Check Contactors Panel for Sootblowers System
L/3 VIA RL RELAY NO/NC CONTACTS D11 D12 D13 D14 D15 WLCT
Remote Control LO/3