ZTE 

UMTS NodeB 
Hardware Installation 
V.2.5 (Complete) 
For: ENTEL UMTS Project 
Installation Teams

Ing.Rodrigo Rosa 
After‐Sales Department 
ZTE Bolivia S.R.L 
CONTENTS 
p  Introduction to ZTE ZXSDR 
p  Engineering preparation 
p  BBU Installation 
p  Installation of B8900 using outdoor cabinet 
p  Installation ofIndoor BBU 
p  Module Installation 
p  Cable installation 
p  Checking Installation 
p  RRU and OLP installation 
p  RRU Mounting 
p  Cable Installation 
p  Antenna Installation

© 2006, ZTE Corporation. All rights reserved. 
Introduction to ZTE ZXSDR 
The Software Defined Radio Base Stations (SDR) adopt innovative distributed 
structure,  unified MicroTCA platform, and multi­carrier technologies to 
significantly boost system integration and efficiency, as well as network 
convergence and evolution capabilities. ZXSDR series base stations support 
multi­mode, multi­band wireless operation through software configuration. 
Allows powerful evolution to LTE. 

It consists of two parts: BBU and RRU/RSU, which can be used either indoors 
or outdoors. Such distributed base station architecture allows flexible site 
selection, zero footprint, extended coverage, and baseband pool in 
high­traffic scenarios. 

ZXSDR BS8700/BS8900 allows dual mode GSM+ 
UMTS service deployment

© 2006, ZTE Corporation. All rights reserved. 
Concepts About Distributed Base Station 

n  It is baseband data that is tranmitted between BBU and RRU. Both 
intermediate frequency and radio frequency are processed in RRU. 
n  BBU and RRU transmits data through optical fiber, significantly 
simplifying project construction. 
n  Concept of baseband pool. Node B capacity increases. 

I ub
数字中频 功放
Iub  基带处 收发信单 元
TRX
主控和 ( 对外中频接口 和
接口 接口板
时钟 
理单元
为模拟信号)
…  低噪放 ……

射频拉远单 元( RRU)
室内单 元( BBU)

© 2006, ZTE Corporation. All rights reserved. 
Equipment Structure and Topology

© 2006, ZTE Corporation. All rights reserved. 
Typical Application

© 2006, ZTE Corporation. All rights reserved. 
Base Band Unit ­ ZXSDR B8200 
Performance Index 
19 inch n  Processing Capability: 
u  UMTS: 30CS ( 6CS *5 BPCs) 
2U  88.4mm  u  GSM: 60TRX 
n  Base Band Processing Capability: 
u  Uplink/ Downlink: 960CE 
482.6mm 
n  Data Processing Capability: 
u  Downlink: 216Mbps 
Based on Unified MicroTCA Platform  u  Uplink: 75Mbps 

Uplink:192CE  Physical Index 
BPC Processing  Downlink:192CE 
Capability  Downlink:43.2Mbps  n  Volume:88.4×482.6×197mm(H×W×D)
Uplink:15Mbps  n  Weight: 8.75kg (full configuration) 
n  Typical Power Consumption : 
Interface Index  UMTS: 80W(1BPC), 115W(2BPC) 
n  Abis/Iub Interface:  GSM: 60W(12TRX), 75W(24TRX) 
u  2*STM­1;16*E1/T1;1*FE/GE  n  Power Supply: ­48V DC 
Electric/Optical(8 VLAN) 
n  Temperature Range: ­20℃~ 55℃
n  To RRU: 12*1.25Gbps CPRI optical interface 
n  Humidity Range: 5%~95% 

© 2006, ZTE Corporation. All rights reserved. 
Remote Radio Unit ­ ZXSDR R8860 
Performance Index 
n  Carrier Configuration: 
u  Support maximal: 6TRX or 4CS 
u  Support maximal: 4G1U 
n  Output Power:80W 

370mm 
n  Receive Sensitivity: ­113dBm[GSM] 
­126.5dBm@sigle antenna[UMTS] 
­129.2dBm@dual antenna[UMTS] 
19

n  Frequency: 
7m

850MHz, 900MHz, 1800MHz, 1900MHz 

320mm 

ZXSDR R8860 (1T2R)
Physical Index 
n  Volume: 370×320×197mm (H×W×D)
•  Support GSM and UMTS. n  Weight: 20Kg 

n  TPC: UMTS:1C: 155W/2C: 185W/3C: 210W/4C: 230W 
Interface Index 
GSM: 200W(900M) /210W(1800M) 
n  2*1.25G CPRI Optical interface 
GU: 4G1U 215 W 
n  Power Supply: ­48V DC 

n  Temperature Range:­40℃~+55℃

n  Protection Class: IP65 

© 2006, ZTE Corporation. All rights reserved. 
Engineering Preparations 
n  Environment 

l  All civil works of the equipment room should have been completed. 
Including: tower and monopoles, concrete bases, equipment rooms, 
painting jobs, cabling ladders, engineering holes and troughs, 
commercial AC input, lighting systems, etc. 
l  The walls indoors should be dry enough; coated with fire­retardant 
white lusterless paint or other fire­retardant materials. 
l  Indoor environment temperature: ­25℃ ~ 55℃; Recommended 
constant temperature: ­10℃ ~ 50℃. 
l  Relative humidity: 5% ~ 100%; recommended constant temperature: 
5% ~ 95%. 
l  Illumination of equipment room should include three complete sets of 
illuminating systems: daily illumination, standby illumination and 
emergency illumination.Avoid the direct exposure to sunlight. 
l  Outdoor environment temperature: ­40℃ ~ 55℃. 
l  Relative humidity: 10% ~ 100%. 
l  Safe lightning protection measures should be adopted 
l  Grounding system should meet relevant requirement.

© 2006, ZTE Corporation. All rights reserved. 
Flat steel  Vertical grounding body 

Transformer 
Tower  Equipment  grounding net 
grounding net  grounding net 

Grounding Network Structure 
According to the principle of equalized voltage and electric potential, the working 
ground, protection ground and lightning protection ground should be 
interconnected to form a joint ground network 
Grounding resistance should be less than 10Ω. 
For areas where the thunderstorm days are less than 20 annually, the grounding 
resistance can be less than 10Ω or comply with the engineering design 
documents

© 2006, ZTE Corporation. All rights reserved. 
l  When Engineering holes pass through outer wall, prevent water and 
animals from getting into the room. 
l  Moisture prevention measures should be adopted for troughs. 
l  Fissures of cover plates for all the embedded tubes, ground troughs 
and holes should be tightly sealed, and the sealing materials should 
not be hard to deform or crack 
l  No water supply pipes, drainage pipes and fire control pipes are 
allowed inside the equipment room.

© 2006, ZTE Corporation. All rights reserved. 
l  Special requirements for equipment rooms 

n  The door height≥2 m, passage ≥ 1m, ceiling height ≥3 m. 
n  Distance from face of cabinet  to other equipment≥ 80cm. 
n  Recommended distance between 2 rows of equipments ≥ 1 meter. 
n  Room floor and rooftop surfacs should sustain at least 450kg/m 2 . 
When supply includes big storage batteries, floor should sustain at 
least 800kg/m 2 . 
n  Height deviation for every 1m 2  of the floor ≤2mm. 
n  Environment free from high temperature, condensed dust, mephitis, 
explosive articles and low atmospheric pressure. 
n  Check location of the feeder window. If no feeder window, select a 
proper place in, avoid opening it in the bearing strut or the down­lead 
of the lightning arrester.

© 2006, ZTE Corporation. All rights reserved. 
l  Power 
n  1. AC power supply 
–  Three­phase power supply: 380V±10%, 50Hz±5%. 
–  Single­phase or double­phase power supply: 220V±10%, 
50Hz±5%. 
n  2. DC power supply 
–  Nominal voltage: ­48V, allowing ­57V~­40V 
–  DC power supply should have protection and indication for over­ 
current and over­voltage. 
n  3. UPS Requirements 
–  Input Voltage (V): 220V±10%. 
–  Input Frequency (Hz): 50Hz±5%. 
–  Output Voltage (V): 220V±3%~220V±5%. 
–  Output Frequency (Hz): 50Hz~60Hz. 
–  Output Wave: Sine wave 
–  Working: Online 
–  Dynamic Reaction Time: Shorter than 2ms

© 2006, ZTE Corporation. All rights reserved. 
l  Transmission: 
n  Transmitting equipment is installed properly and works normally 
n  DDF or router is fixed and connected with the transmitting 
equipment. 
n  If the transmission medium is microwave, parameters of the IP 
addresses carefully planned. 
l  Antenna and feeders 
n  Antenna, feeder cable and tower of the BTS system and the 
equipment should be well grounded; grounding resistance should be 
less than 10Ω. 
n  Antenna can be installed on the roof with or without enclosure, or on 
a tower or a pole. Before the formal installation of the antenna. 
supports and poles should be well fixed and the tower, pole, cabling 
rack should be checked. 
n  Height and strength of the tower conform to the specifications. 
n  Grounding copper bar around the tower properly installed. 
n  Platform of the tower properly installed.

© 2006, ZTE Corporation. All rights reserved. 
n  Rooftop Poles for fixing BTS antenna should be vertical to the 
horizontal plane and the error should not exceed 1°. 
n  Pole should be installed near the edge of the building top to the 
extent possible. 
n  Poles directly fixed on the rooftop must use cement pier, instead of 
directly punching on the building roof. 
n  Cabling rack must not shake. 
n  Indoor cabling rack should be grounded one time every 5m 
n  Transport access should be clear of obstacles 
n  Temporary storing environment 
n  Should have excellent packaging, waterproof and shock­resistant 
conditions; free of fire, theft, high temperature, rodents, corrosion, 
electromagnetic interference. And consider lightning protection and 
poison protection measures. 
n  Intensity of the electric field≤300mV/m 
n  Intensity of the magnetic field ≤11Gs.

© 2006, ZTE Corporation. All rights reserved. 
Installation 
Elements

© 2006, ZTE Corporation. All rights reserved. 
BBU Installation
n  Elements to be installed 

© 2006, ZTE Corporation. All rights reserved. 
n  SDR Classification. 

Depending on installation conditions, ZTE’s UMTS SDR can be 
classified in 2 types: 

l  ZXSDR B8700: For Indoor use, to be mounted on 19” standard 
rack or bracket, or wall mount cabinet 
l  ZXSDR B8900: For Outdoor use, includes 8910 outdoor 
cabinets

© 2006, ZTE Corporation. All rights reserved. 
Installation of B8900 using outdoor cabinet

n  There are four combinations of the ZXSDR BS8900: 

l  Combination 1: BC8910+RC8911 (Monolitic NodeB) 
l  Combination 2: BC8910+PC8910+RC8910 (Monolitic Node B) 
l  Combination 3: BC8910+RC8910 (Monolitic NodeB) 
l  Combination 4: BC8910+PC8910 (Distributed NodeB) 

The RC8910, RC8911, and PC8910 cabinets need to be 
installed on the ground level. 
Cabinets may have no base upon delivery, then base must be 
installed separatedly. 
BC8910 cabinet requires access from the front and back of the 
cabinet. 

© 2006, ZTE Corporation. All rights reserved. 
n  Installation Flow  Start 

Preparation 

Installing a cabinet 

Installing the modules in a cabinet 

Installing cables 

Waterproof treatment

End 

© 2006, ZTE Corporation. All rights reserved. 
n  Space Requirement

© 2006, ZTE Corporation. All rights reserved. 
n  Ground Installation 
1.  Determine installation position. Draw two straight lines parallel to the 
datum line. Determine position of the installation holes for the cabinet on 
the two lines. Following figure shows the installation position 

2.  Drill holes for expanssion bolts, φ10mm or ½” (depending on the supply), 
90 mm depth

© 2006, ZTE Corporation. All rights reserved. 
3.  Put the expansion bolt and the expansion tube into the hole vertically, hit 
the expansion bolt with a rubber hammer till the expansion tube is 
completed driven into the ground.

© 2006, ZTE Corporation. All rights reserved. 
4.  If site is located in a roof top terrace without easy access using stairs or 
elevator. Hoist the cabinet to site location. Two persons or more 
persons waits at the top of the building. One at the bottom releases the 
rope slowly and prevents the cabinet from touching the building, or 
cables hanging in front of the building. 

WARNING 

•Attach carefully the equipment to hoisting hook using 
the cabinet lifting rings. If necessary, install BC cabinet 
lifting rings on PC cabinet for the hoisting procedure. 
•Remove delicate equipment from BC cabinet before 
the hoisitng 
•It is strictly prohibited to connect the cabinet to hook 
using steel wire rope 
•Hoisting speed should be slow 
•During hoisting procedure, irrelevant 
person is prohibited to stand under the equipment 
being hoisted

5.  Open the front door, and remove the bolts of the wooden pallet. 
6.  Demount the rear door panel, and remove the bolts of the wooden pallet. 

© 2006, ZTE Corporation. All rights reserved. 
7.  Move out the wooden pallet. 
8.  Alt.A If cabinet includes a sepparated base: Fix 
base to expanssion bolts using nuts. If necessary, 
level the base using metal levling washers. Open 
the front door and rear doors, and fix the cabinet on 
the base by using the supplied bolts and nuts.

© 2006, ZTE Corporation. All rights reserved. 
9.  Alt.B If cabinet includes a base 
fixed to the bottom of the cabinet: 
Put the PC8910 cabinet in position, 
and fix the cabinet on the ground 
through an expansion bolt suite. If 
necessary, level the base using 
metal leveling washers 

NOTE: 
In active seismic areas, mounting 
force applied to nuts should be up 
to 45 N•m. Otherwise mounting 
force should be enough to ensure 
the cabinet doesn’t shakes

© 2006, ZTE Corporation. All rights reserved. 
10.  If necessary, remove the rack lifting 
rings at the top of the PC8910 
cabinet and rubber caps of cabling 
holes.

© 2006, ZTE Corporation. All rights reserved. 
11.  Align cabling holes on both cabinets, open 
the front door, and fasten the two M8 inner 
hexagon screws in the backplane of the 
frontage of the cabinet. 
12.  Demount the rear door panel of the cabinet, 
and fasten the two M8 inner hexagon screws 
in the backplane of the back of the cabinet. 
n  Fix the cabinet roof on top of BC8910 
cabinet

© 2006, ZTE Corporation. All rights reserved. 
n  The ZXSDR BS8900 is an outdoor device. After cabinet and 
cables are installed, waterproofing and sealing treatment to the 
cabling holes and the spacing between cabinets must be 
applied.

© 2006, ZTE Corporation. All rights reserved. 
n  BC8910 Cabinet Layout 

Climate conditioner 
(Fan/Heater) 

Cooling/Heating 
Control Panel  Available expansion 
space (4U) 

AC breakers 
ILP 

ZXSDR BS8200 
GU360 Base Band 
Unit 
DC breakers 

ZXDU58 B121 
Rectifier Modules  Power solution 

Rectifier Control Module

© 2006, ZTE Corporation. All rights reserved. 
Installation of Indoor BBU 
n  BS8700 Supports several indoor installation methods. On a bracket, on a 
simplified bracket, on the wall or in an exisiting closed rack. For ENTEL 
project an standard 19” self­standing bracket is required. The location of 
the 19" bracket should be not less than 400 mm away from the equipment 
in front; Not less than 400 mm away from the equipments in back; Not less 
than 100 mm away from the walls at both sides.  Distance from the front to 
other equipment should be not less than 800 mm.

© 2006, ZTE Corporation. All rights reserved. 
n  It is required a minimum of 5U (1U=1.75 inch =44.45mm) of 
installation space available. 1U space on the top: reserved . 2U 
space in the middle: for ZXSDR B8200.1U space below the 
ZXSDR B8200 the wiring trough. The 1U at the bottom: 
cable wiring. 
n  It is recommended to install B8200 one meter above the floor. 

7  Bottom rung  2 
6  Flat washer (M12)  8 
5  Hex bolt (M12 × 25)  8 
4  Flat washer (M10)  4 
3  Hex bolt (M10 × 20)  4 
2  Support  2 
1  Top rung  2 
No.  Name  Quantity  Remarks

© 2006, ZTE Corporation. All rights reserved. 
n  Installation Flow

Start 

Installation preparation 

Install cabinet 

Install modules inside the cabinet 

Install cables 

End 

© 2006, ZTE Corporation. All rights reserved. 
n  Check and determine if current 
19” location satisfies the 
installation requirements. 
n  Inset the floating nut into the 
mounting holes in the vacant 5U 
slot in the mounting bracket 
according to the location of the 
ZXSDR B8200 equipment and the 
wiring trough 
n  Carefully insert the wire trough 
into the 1U space corresponding 
to the floating nut,and fasten the 
screw 
n  Install the B8200 equipment 
above the wire trough. Check the 
stability of B8200. It should not 
shake with hand shaking.

© 2006, ZTE Corporation. All rights reserved. 
Warning

n  Be carefull with ventillation and air flow when installing ZXSDR 
B8200 indoor, or the purity of air can not comply  requirements, 
causing fan air intake jam and raising temperature in ZXSDR 
B8200, causing overtemperature alarm, and damaging the BBU. 
n  Radiating heat requirements: A minimum of 40mm ventilation 
space should be reserved both the left/right sides of the ZXSDR 
BS8700 cabinet. The air inlet is at the right side and the air outlet 
is at the left side. No heat source should be located to the right 
side of the ZXSDR B8200 cabinet. If there is, ZXSDR B8200 
should be installed in other place. 

© 2006, ZTE Corporation. All rights reserved. 
Module Installation 

•Control and clock module CC is installed in slot 1 and slot 2. it supports one or 
two CC 
•Fabric switch module FS is installed in slot 3 and slot 4. it supports one or two 
FS. When uses one FS, slot 4 can be used to configure TAM, BPC, or UBPG. 
•Site alarm extender board SE is installed in slot 5. It can have one SE or no SE. 
If no SE, slot 5 can be used to configure BPC or UBPG. 
•Tower amplifier module TAM can be installed in slot 4, 5, 6, 7, or 8. Usually, 
TAM is installed in slot 8 first, and then 4. If no TAM , slot 4, 5, 6, 7, and 8 can 
be used to configure BPC or UBPG. 
•Baseband processing board BPC/UBPG can be installed in slots 4, 5, 6, 7, 8. 
•Site alarm module SA is installed in slot 13. 
•Power module PM is installed in slot 14 and 15. It supports one or two PM.

© 2006, ZTE Corporation. All rights reserved. 
Cable Installation 
n  Cabling Flow n  Cable List 
l  Power cable 
l  Grounding cable 
l  Ethernet cable 
l  Optical fiber 
l  GPS jumper cable 
l  BITS cable 
l  Data cable 

© 2006, ZTE Corporation. All rights reserved. 
n  Cabling Principles 

l  If the equipment room is equipped with racks and antistatic floorboards, 
use downward cabling mode. If upward cabling mode is used, need to 
install a cabling rack/cabling ladder at the upper part of the cabinet and 
route the cables in the cabling rack. 
l  Cabling position should be designed in advance. The cables should be 
arranged orderly, and their skin should not be damaged. 
l  External cables include power cables, tail fibers, trunk cables, and other 
signal cables. Cables in the cabling rack should be categorized and 
bundled, should not be crossed each other. Cables should be fixed by 
cable ties. Bundling interval should be 20 cm. 
l  Bending position of each cable should be even and smooth. The 
minimum bending radius = 60 mm. 
l  Cables should be bundled orderly and straightly. Cable ties should be 
distributed at regular intervals, and tightened moderately.

© 2006, ZTE Corporation. All rights reserved. 
l  Cables in a cabling trough may not be bundled. Cables in a cabling 
trough should be straight,  not cross each other, and not overflow the 
trough. Cables should be bundled at the entrance and exit of the cabling 
trough and at the turning positions. 
l  Trunk cables routed from the cabinet to the cable terminal rack should 
not be strained. Redundant cables should not be cut. In a cabling trough 
or in a movable floor, cables leading to different cabinets should be 
bundled separately from eachother. Cables should be straight and 
ordered, not cross each other. Their skin should not be damaged. If 
necessary, reserve additional length for the cables. 
l  Cable should be affixed with corresponding labels. Every label should be 
affixed 2 cm away from one end of the cable. Label indicates the 
destinations of both ends: cabinet number plus slot number plus socket 
number. 
l  The cables should be routed to facilitate maintenance and future 
expansion capacity.

© 2006, ZTE Corporation. All rights reserved. 
n  Cable Conection (BBU)

© 2006, ZTE Corporation. All rights reserved. 
n  Data Cable Description (for 
indoor installations) 
• End A is SCSI50 plug 
• End B1 is grounding end 
• End B2 is DB44 plug 
(connected to E1/T1) 
• End B3 is RS232/RS485 
connector for monitoring 
ZXDU58 B121 power 
supply equipment 
• End B4 is dry contact 
connector

© 2006, ZTE Corporation. All rights reserved. 
n  Incomming cables to PC8910 cabinet 

AC Power 

DC Power 

Optical 
Fiber 

Optical 
Fiber, UTP, 
E1
© 2006, ZTE Corporation. All rights reserved. 
Optical Fibers 
Installation Care
In order to prevent damages to fiber core, special cares must be paid to 
Optical Fiber installation: 

l  Don’t step on the fibers of let heavy materials lay over them. 
l  Don’t bend the fibers forming angles, respect the minimum bending radius 
l  Don’t force connectors through passtrough engineering holes. Remove the hole 
cap, lay the cables, cut the appropriate holes with side cuts to pass the cables and 
reinstall the cap in the engineering hole. Use always outtern holes for the fibers 
l  Don’t force connectors into position by pressing from the cable surface. 
l  Don’t stress fibers with plastic straps, clamps or tools. 
l  Don’t cut the sheat of fibers 

© 2006, ZTE Corporation. All rights reserved. 
Installation Procedure

Do not pull the optical 
fiber cable from the 
inner side of the coil 
because the cable may 
get tangled. 

If the cable is 
tangled, carefully 
Carefully release the 
untangle it and 
optical fiber cable coil 
make sure the 
after coil while is 
bending radius is 
gently pulled up the 
at least 200 mm. 
tower. 

© 2006, ZTE Corporation. All rights reserved. 
To pass trough enginnering passtrough holes, two operators should cooperate at the two 
sides of the wall to thread the optical fiber cables through holes in the wall or feeder outlets 
smoothly: one pulls the cable and the other releases the cable coil after coil so that the cable 
will not get tangled. Do not pull cable from the connectors.

© 2006, ZTE Corporation. All rights reserved. 
Do not bundle the 
optical cable too 
tightly. Otherwise, 
optical loss will be 
increased.

If the optical cables 
are laid outdoors, 
they shall be bundled 
together with the 
power cables with 
anti­ultraviolet ties or 
clamps. The intervals 
between adjacent 
ties/clips should be 
consistently 500 mm. 

© 2006, ZTE Corporation. All rights reserved. 
Connecting Optical Fiber Cables at the RRU Side 

Note: Optical modules of 
Step 1: Remove the  different kinds of 
dustproof cap, hold the  equipment may have 
Press here to 
LC connector with the  different directions. Please 
unplug the LC 
thumb and the  carefully distinguish the 
forefinger, and insert the  connector. 
direction before inserting 
connector in the correct  the connector.
direction (if it is inserted 
successfully, you can 
hear a crisp sound).  。  Hold the two flank 
sides when inserting 
the LC connector. 

© 2006, ZTE Corporation. All rights reserved. 
Check the two sub­ 
cables to make sure 
they are not tangled. 
They can have a 
slight curvature. 

Step 2: Gently insert the 
inner sleeve into the 
optical port.

© 2006, ZTE Corporation. All rights reserved. 
After the outer sleeve is 
Step 3: Screw the 
tightly screwed, if the yellow 
outer sleeve upward 
ring is exposed, then it is 
to make it tightly 
considered that the inner 
cover the flange of 
sub­cables are not crooked. 
the optical port. 
Otherwise, redo Step 2.

© 2006, ZTE Corporation. All rights reserved. 
Keep the optical fiber 
cables from sharp  Correct operation: The 
edges and make sure  optical cable should be 
placed along the outer 
the bending radius is at  side of the E1 cable so 
least 40 times of the  that its bending radius 
cable external diameter.  can be increased.

© 2006, ZTE Corporation. All rights reserved. 
Power Cables 
Color Code Standards 
DC Cable Color code for ­48V:  DC Cable Color code for Batteries: 
Function  Label  Color 
Function  Label  Color 
Negative  ­, ­48V  Blue 
Negative  NEG, ­  Black 
Positive/ Neutral/  +, N, ­  Black 
Working Ground  48VRTN,  Positive/ Neutral/  POS, +  Red 
GND  Working Ground 

Protective Ground  PE, PGND  Yellow/ Green 

AC Cable Color code (IEC 60446 / BS 7671): 

Color 
Function  Label 
New  Old 
Protective Ground  PE, PGND  green­yellow  green­yellow 
Neutral  N  blue  blue 
Line, single phase  L  brown  brown or black 
Line, 3­phase  L1  brown  brown or black 
Line, 3­phase  L2  black  brown or black 
Line, 3­phase  L3  grey  brown or black 
For single phase installations using 3 core cable, use brown/white for 
phase, blue for neutral and black for ground

© 2006, ZTE Corporation. All rights reserved. 
Power Cable Installations (outdoor cabinet)
n  Arrange DC and AC cables at PC8910 cabinet to keep them sepparated 

AC Cable 

DC Cables 

© 2006, ZTE Corporation. All rights reserved. 
n  Cable connections at the PDU of BC8910 cabinet 

Battery 
Temperature 
Sensors (move 
to PC8910 
cabinet) 

DC Power cables 
Smoke  AC Power 
(black to +, blue to ­) Sensor cable  cable 

© 2006, ZTE Corporation. All rights reserved. 
n  Power Cable connections at the back of BC8910 cabinet (ZXDU58 B121 
PDU)

© 2006, ZTE Corporation. All rights reserved. 
n  Power Breakers at the front of BC8910 cabinet (ZXDU58 B121)

© 2006, ZTE Corporation. All rights reserved. 
Battery Installation PC 8910 Cabinet 

•The four batteries are in serial 
connection with each other to reach 
48V (12V each). 

•Connect battery rack fan cables to the 
batteries

© 2006, ZTE Corporation. All rights reserved. 
•Measure output power with a multimeter to verify power output.

© 2006, ZTE Corporation. All rights reserved. 
•Connect Battery cables to Rectifier 
Connection Panel at the back of the 
cabinet 

•Attach Battery temperature sensors to 
3 of the batteries 

•Arrange cables and apply protective 
cobers to the batteries 

•Label cables and batteries

© 2006, ZTE Corporation. All rights reserved. 
•Connect Open Door sensor cable DS­ 
95820­012­V1.1 to sensor at PC8910 
cabinet and sensor cable of BC8910 
cabinet

© 2006, ZTE Corporation. All rights reserved. 
Indoor Rectifier and Battery Rack 

n  Emerson Netsure 501 A50 Rectifier

© 2006, ZTE Corporation. All rights reserved. 
© 2006, ZTE Corporation. All rights reserved.
n  Emerson Rack 588820100

© 2006, ZTE Corporation. All rights reserved. 
© 2006, ZTE Corporation. All rights reserved.
Indoor Lightning Protection Box

n  Connect Input of ILP to 
a 32A breaker of 
rectifier 
n  Connect each output to 
one RRU DC Power 
cable 

© 2006, ZTE Corporation. All rights reserved. 
Checking Installation 

n  Cabinet installation location complies with the engineering design. 
n  Cabinet is installed in a stable and secure manner. 
n  Cabinet vertical deviation ≤2mm 
n  Cabinet surface is clean and tidy, with no paint loss. If paint is lost, 
cabinet must be repainted with adequate paint for outdoor use, in 
the same color of the cabinet. 
n  All screws are tightly screwed. The flat washers or spring washers 
are in place. 
n  All cables are laid flat and smooth. 
n  Cable bending is smooth. 
n  Each cable is marked correctly and clearly. 
n  Cable connectors are in good contact with the interfaces. 
n  All metal connectors of the power cable and grounding cable must 
be secured with plain/spring washers at the binding post.

© 2006, ZTE Corporation. All rights reserved. 
n  Cables are strapped in a clean and tidy way. Strap ties are evenly 
distributed, neither tight nor loose. Surplus part of the straps/cables 
should be cut.

© 2006, ZTE Corporation. All rights reserved. 
n  Engineering wastes are cleaned. 
l  Any engineering waste materials like unused electric cables, cutoff 
cable pieces, etc are disposed off. There should be no cable clips or 
sundries left at the installation site. 
l  Any waste materials should be put in a dust cover, closed tightly and 
disposed off.

© 2006, ZTE Corporation. All rights reserved. 
RRU & OLP Installation 
•Hoist RRU and OLP/LPU to Tower 

If it is required to hoist RRU and/or OLP/LPU to the tower or a building 
terrace: 

§Natural conditions for hoisting operation are satisfied, such as no fog 
and high visibility. The hoisting operation is prohibited in windy, snowy, 
or rainy days. 
§Tools for hoisting operation are available, such as the rope (with a 
bearing capacity of 100 kg) and the crown block; the crown block is 
firmly installed in appropriate position on the tower. 
§Open the package to check whether the cabinet is 
in good condition. 
§Hoist the cabinet to the tower after the inspection: 
1.  Take out the cabinet, make its fixing board 
upwards, and lay it on the floor 
2.  Bind the fixing board with rope. Make sure that the 
rope is bound on the two fixing boards, and the 
binding is firm

© 2006, ZTE Corporation. All rights reserved. 
3.  Two persons stand at the foot of the tower. 
One pulls the rope slowly, the other one 
releases the rope slowly and prevents the 
cabinet from touching the tower 

WARNING 

•RRU handle can not be used for binding 
the hoisting rope. 
•It is strictly prohibited to use steel wire rope 
as the hoisting rope. 
•During hoisting procedure, irrelevant 
person is prohibited to stand surrounding 
the tower, especially under the RRU/OLP.

© 2006, ZTE Corporation. All rights reserved. 
•  Fix RRU to Support 
NOTE: ENTEL requests RRU to 
easily accessed for maintenance 
duties. 

1.  Install pole anchor clamp 
components.

i.  Fix anchor clamps onto the 
pole, and align the anchor 
clamp holes and screw the 
bolts a bit; 
ii.  Adjust the space between the 
clips based on the screw's 
position of supporting panel, 
and fix the RRU supporting 
panel on the clips at the front 
bracket with M8 bolts and 
tighten it properly; 
iii.  Screw down M10 bolts tightly. 

© 2006, ZTE Corporation. All rights reserved. 
2.  Mount the R8860 cabinet on the supporting panel and fasten the cabinet 
with four M6X20 hexagon socket cap screws

© 2006, ZTE Corporation. All rights reserved. 
•  Fix Outdoor Lightning Protection Unit to Antenna Support 

1.  Install OLP supporting pannel on the back of the 
bracket system for RRU. 
2.  Mount the OLP/LPU cabinet on the supporting 
panel and fasten the cabinet with four M6X20 
hexagon socket cap screws.

© 2006, ZTE Corporation. All rights reserved. 
OLP will lay back­to­back with RRU 

OLP 

Brackets

RRU 

© 2006, ZTE Corporation. All rights reserved. 
RRU Support Plate Antenna Support Pole 

RRU  OLP 

Brackets  OLP Support Plate 

© 2006, ZTE Corporation. All rights reserved. 
•  Location of OLP and RRU (RRU&OLP on Same Pole as Antenna)

© 2006, ZTE Corporation. All rights reserved. 
•  Location of OLP and RRU (RRU&OLP Behind the Antenna)

Top of RRU 
shouldn’t be over H2 
H2≤1/2*H 

© 2006, ZTE Corporation. All rights reserved. 
•  Location of OLP and RRU (RRU on working platform)

© 2006, ZTE Corporation. All rights reserved. 
Cable Installation 
n  Cabling Flow n  Cable List 
l  Power cable 
l  Grounding cable 
l  Optical fiber 
l  Environment Monitoring Cable 
(connects to lightning protection 
unit) 
l  Antenna Jumper 
l  AISG Antenna control cable 

© 2006, ZTE Corporation. All rights reserved. 
Power Cable 
Optical Fiber between RRU and BBU 

Environment Monitoring Cable 

Antenna
RRU 

Antenna Jumper  AISG Antenna control cable 

© 2006, ZTE Corporation. All rights reserved. 
n  ZXSDR 8860E RRU interfaces

© 2006, ZTE Corporation. All rights reserved. 
n  Cable Conection (RRU)

© 2006, ZTE Corporation. All rights reserved. 
n  Cable Connection – OLP Cabling 

Monitoring 
Grounding  cable
cable 

DC Input  DC Output 
(from rectifier)  (to RRU) 

DC Output 
(for RRU 
Expanssion) 

© 2006, ZTE Corporation. All rights reserved. 
n  Cable Connection ­ Monitoring Cable at OLP 

Pin Color Code  Description 


15/16  White and blue/blue  Dry contact 4 ­/+ (external alarms) 
17/18  White and orange/orange  Dry contact 3 ­/+ (external alarms) 
19/20  White and green/green  Dry contact 2 ­/+ (external alarms) 
21/22  White and brown/brown  Dry contact 1 ­/+ (external alarms) 
23/24  Red and blue/blue  RS485 receive (OLP monitoring C) 
25/26  Red and orange/orange  RS485 transmit (OLP monitoring NC) 

NOTE: Use a multimeter to identify the pair 

© 2006, ZTE Corporation. All rights reserved. 
n  Cable Connection – Cable Order 
l  DC Power Cables and Optical 
Fibers are ordered from left to right 
in the clamp. 

n  Cable Grounding 
l  DC cables requires to be grounded 
using grounding kits at top of the 
tower and before it reaches the 
horizontal plane. When lenght of 
DC cable ≤ 20m, only requires 1 
grounding kit
Sector 1  Sector 2  Sector 3 

© 2006, ZTE Corporation. All rights reserved. 
Antenna Installation 
Parameters
n  Height 
The installation height of antenna on the tower is 
determined by network planning design. 
n  Azimuth 
The azimuth/bearing of the antenna is determined by 
network planning design. 
n  Down­tilt/Up­tilt 
The down­tilt angle of the antenna is determined by 
network planning design. Usually the mechanical 
down ­tilt angle is 0°~10°adjustementprovided by 
Fastener B. Aditional down­tilt is provided trough 
electric down­tilt mechanism from 0°to 8°
n  Direction 
Antenna direction depends on the antenna azimuth. If 
two antennas in same sector, must share the same 
azimuth. 

© 2006, ZTE Corporation. All rights reserved. 
Installation 
•The antenna installation position must be in accordance 
with project design 
•The antenna should be hoisted according to same 
safety standards as RRU 
•The antenna installation position needs to take 
care for lightning protection. If thunders storm days≥20 
per year or mountain environment, protection angle 
should be 30º. Otherwise 45º are recommended

1.  Lighting rod  3.  Antenna 


2.  45~30°Lightning protection area  4.  Grounding cable 

© 2006, ZTE Corporation. All rights reserved. 
•Antenna isolation 
The antenna installation position must keep vertical and horizontal separation 
from other antennas in order to prevent interference 

d≥0.7 m between UMTS and  d≥1.4 m between UMTS and 
GSM850/1900 or D­AMPS  GSM850/1900 or D­AMPS antennas.

© 2006, ZTE Corporation. All rights reserved. 
3GPP criterion regarding GSM&WCDMA co­site interference, is focused mainly 
to avoid the block interference, according to the equipment performance and 
actual experience, the isolation dB and distance is defined as follows: 

Parameter\Band  GSM1900 & WCDMA850  DCS1800 & WCDMA850 

isolation (dB)  43  33 

vertical distance(M)  0.7m  0.5m 

horizontal distance  1.4m  1 m 

Because WIMAX 3.5G and WCDMA 850M are at different frequency bands, so 
we don’t need to consider the isolation between them.

© 2006, ZTE Corporation. All rights reserved. 
Other considerations regarding antenna isolation: 
Back to back antennas                  Confronted antennas

© 2006, ZTE Corporation. All rights reserved. 
•Adjust supports along the antenna body according to antenna support size 
and prepare the jumpers.

© 2006, ZTE Corporation. All rights reserved. 
•Fix the antena to the poles, and adjust mechanical down­tilt to meet engineering 
design. Default is 0. 
•NOTE: Leave space for the electric down­tilt adjustment mechanism below the 
antenna.

© 2006, ZTE Corporation. All rights reserved. 
• Consider that if the site requires up­tilt, the antenna brackets must be 
installed reversed. 

Down­tilt mounting  Up­tilt mounting

© 2006, ZTE Corporation. All rights reserved. 
Electric Down­tilt 
Adjustment Mechanism

•Adjust Electric down­tilt according to engineering design. Default is 0 
(all extended) 

© 2006, ZTE Corporation. All rights reserved. 
Pilot Pollution: An Issue to Consider When Installing UMTS 
Antennas 

UMTS ‘breathing cell’ nature requires 
dynamic adjustment of cell footprint. This 
doesn’t happens in the GSM ‘static cell’. 
The effect of the rear and side lobes are 
critical when deploying UMTS networks. 

The parabolic reflector inside the body 
of the antenna minimizes but doesn’t 
eliminates the rear and side lobes of 
the antenna beam. It is estimated an 
effective range of 50 cm to the back 
and back sides of the antenna.
© 2006, ZTE Corporation. All rights reserved. 
n  On UMTS and other CDMA networks a Common Pilot Signal Channel 
(CPICH) is used to estimate the quality of the channel, cell selection and 
handover. This is not necessary on GSM networks. 
n  The power of the CPICH signal defines the cell coverage and has a direct 
impact on the cell capacity and the quality of the service. 
n  Usual CPICH signal power is between ­30 and ­33dBm and its dinamically 
adjusted by the node B according to the quantity of subscribers attached to 
the cell. It will decrease power as more subscribers get connected to the cell. 
n  Subscribers are virtually attached to a channel. Several node B can overlap a 
point with the same channel to make possible the soft­handoff of the 
subscribers when moving from one cell to another. Subscribers remain on 
the same channel when moves from one cell to another. 
n  When located on the overlapped area, a subscriber may be connected to 
several cells simultaneously. 
n  Receiving Equal power CPICH signals or multiple strong CPICH signals with 
its multipath components form cells that doesn’t belong to the current Active 
Set causes Pilot Pollution 
n  On Pilot polluted environments, signaling power consumption increases, 
reducing the power available for subcribers’ traffic; the call establishing 
process is affected and also the degradation of the quality of the signal is 
noticeable, the pilot pollution degrades the Frame Error Rate (FER) and Bit 
Error rate (BER) increasing the number of terminated calls. 
n  Exposing the jumper of the UMTS antenna to the rear lobe of ayn antenna 
may increase the pilot signal power, generating pilot pollution.

© 2006, ZTE Corporation. All rights reserved. 
Installation of RET (Remote Electric Tilt) control 

n  Install Andrew ATM200­A20 actuator on Antenna Electric Tilt 
Adjustment device: 
l  Remove knob,  compression bolt and ring of tilt adjustment 
l  Attach new washer and locking bolt 
l  Attach actuator to tilt adjustment end. 
l  Align actuator so it doesn’t touches the Jumpers.

© 2006, ZTE Corporation. All rights reserved. 
nConnect 3m AISG cable between First ATM200­A20 actuator and 
ALPD, and 3m AISG cable from ALPD to RRU 

AISG Cable doesn’t need 
waterproof treatment on 
actuator side.

© 2006, ZTE Corporation. All rights reserved. 
nConnect 5m AISG cable between ATM200­A20 actuators in a chain 
topology

RCU  RCU  RCU 

RRU  ALPD  RRU  RRU 


BBU 

Opt i cal   f i ber 


Cabl e 

AISG  cabl e 

© 2006, ZTE Corporation. All rights reserved. 
Waterproof Treatment for Cables & Connectors 
l  Seal the jumper connector at RRU, antenna port connector, Monitoring 
cable port connector at RRU and Power port connector at RRU for 
waterproof treatment. 1 layer of vinyl electrical tape ­3 layers of 
waterproof nylon adhesive tape (mastic tape)– 3 layers of PVC insulating 
tape. 
n  Wrap the waterproof adhesive tapes to lower side of connectors. Keep 
wrapping direction same as the one that the jumper is tightened. 
n  While wrapping, extend the adhesive tapes to double their length. Note that 
every wrapping layer must be overlapped the previous layer by half the width 
of the tape Wrapping must be extended up to 50 mm (2 inches) away from 
jumper connector position.

© 2006, ZTE Corporation. All rights reserved. 
n  Grip the tape with the hands to make the tape tightly adhered and 
prevent air bubbles 
n  Wrap PVC tapes on top of the waterproof adhesive tape. During the 
process, make sure the upper layer overlaps the lower layer by half 
the width of the tape 
l  Seal the optical fiber connector of RRU, RET/ASIG port connector 
of RRU and Grounding kit connections of RRU DC Power cables 
with 2 layers of PVC insulation tape

© 2006, ZTE Corporation. All rights reserved. 