“Agende-forPRM of TG Pkg of Khurja STPP tobe held on 19-04-23 at Khurja Milestones Target Start Up Power ‘Apr 23 (Nov'22) TG Box Up May'23(Feb'23) TG on Barring Gear July’23 (May'23) Boiler Light Up = ‘Aug’23 (May'23) TG Synchronization ___suly23 Full Load Operation. Aug’23, (Trial Operation - _ ~Sept23 a Legend | R: Previous Commitment (R1, R2, ...: Revised Commitments) SI.No. | = ‘Agenda Discussion/ Commitment ‘A __| Main Structures 1. | MPH Readiness Unit#1: July'22 (L2:23.02.21) ‘Completion of MPH Unit#1: RI: Jul-22, R2: Aug-22, R3: 31.12.22 - Delayed a) Structural Supply: 7100 MT structure dispatched. | 6614/7100 MT erection completed on 05.02.2023 ‘Completion of MPH Unit# RI: Jul-22, R2: Aug-22, R3: 31.12.22 - Delayed a) Structural Suppl 7100 MT structure dispatched. 682517 100 MT erection completed ‘Supply Supplied | Balance | Target Supply | Total | Supplied | Balance Target | —_—— 4 eek eee — = ‘Scope o — a | Supply completed. Erection status [Ru 3inos | Supply completed. Erection status- Completed Columns || Gratings 36MT 144 WT] PO Placed Gratings | 180 | i0sWT | TMT | POPlaced | Balance supply MT Balance supply | Erection | by end Apri'23 Erection | by end May 23, status | (Rt: 31.1222 status. | Reseawr by 102.29, | 25 MT and balance by end- | erection _ | Aprir'23) | - completed | PeiCabie 280 | Supply completed. Erection status || [PiperCabie | 280° | Suppiy completes. Erection status- 1777280 Rack a || |Rack completed, Cantilever 235MT | Supply completed. Erection status | Cantilever ‘235M | Supply completed. Erection status- 70MT anal eee _ rection completed. Piatforme Tati 0 72 | Dispaiched-a5 MT- |__| RRow by 30104.23.6 row(6-14) by 10.05.23. | Status, Paaiorms | 7eMT]aSMY | 27 MT” | Dipalched-46 MT: | Supply of Balance 27 I Stetus. Cae > et up Vz Page 1 of 12 SILNo. ‘Agenda Discussion! Commitment Extractors ] MT by 20.04.23- | Supoly of Balance | status 27 Mt by MOT Stucture | BMT | Supply completed Erection status 20.04.23 Erection | __ | by 10.05.23 CWP SE MT | Supaly completed. Erection status WOT SMT | Suppiy completed. Erection status- 4 MT Condenser “Structure erection completed. ICEP Structure ‘Cwrt) | 65 WT | Supply completed Stair Case 5 3 2 [Balance Pros. under ||| Condenser Erection status- Front readiness in progress. | fabrication dispateh by | || ICEP __| a 30.0423 & 15.05.23” ||| Stucture Roof Exraciors | 12 | Material available. Erection status StairCase | 5 3 2 | Balance 2 nos | under fabrication- | diapaten by | 300423 & 415.05.23(inclucing Lift material) i} Roof, 12 Material available. Erection status- Material shifting in progress. Erection by 25.04.23. a) Civil Readiness: 1. Floor Readiness: b) Civil Readiness: 1. Floor Readiness: Manpower Civil: 240 Nos. as on 05.02.2023 ~ current status Structure: 110 Nos. as on 05.02.2023 - current status Structure:121 nos as on 18.04.23 2. Readiness for Panel! Equipment erection: Manpower I: 244 2. Readin Floor Total | Casted Floor (in | Balance Target Floor Total | Casted Floor | Balance Target Level Scope (in| sqm) status as on | (in sqm) Level | Scope (in | (in sqm) status | (in sqm) ie sqm) _| 08.02.23 ae) a sqm) _| as on 08.02.23 e oom | 4600 4350 20 | 300523 | 4600 4350 | 250 30.05.25 3.5M 840 840 Completed 840 840 Conpieted 85M 4000 4000 4000 4000 12,0 M 840 840 840 840 17.0 M. 4000 4000 4000 | “4000 [2s.0m._[ 4700 1700 1700 1700 rs nos. as on 18.04.23 ‘ess for Panel/ Equipment erection: [Floor | Brick Worki | Cladding | Door! Ventilation! || [Floor | Brick Work! | Cladding | Door! Ventilation! | Level Wall Window | Illumination! Fire | | Level wall Window | Illumination’ Finishing _| Fighting | Finishing Fire Fighting 30.05.23 ‘Supply, 30.05.23 || (0 30.05.23 ‘Supply 30.05.23 | 30.05.23 | completed. 30.06.23 ||| 3.6 30.05.23 | completed. | 30.06.23 L Completed [30.05.23 Fixing! 30.06.23, 85M _| Completed | 30.05.23 30.06.23 Po} Page 2 of 12 = GP ee Nw. BI.No. | Agenda Discussion/ Commitment i 72.0 M 30.05.23 | erection Completed 120M 30.05.23, Completed 17.0 M. 30.05.23 status Completed 17.0 M. 30.05.23 Completed 25.0 M. 30.05.23, 25.0 M. 30.05.23 i. Cladding: UptoGrid no. 10 completed lumination:Status Ventilation System: 5110/12506 sqm Gi sheet already supplied. Duct fabrication! erection status Exhaust Fan for battery room shall be supplied by Apr23-status, 3. CW Pit Readiness — Completed i. Cladding: UptoGrid no. 10 completed ii, Mumination:Status- Conduit work under progress ._ Ventilation System: 5110/12506 sqm Gl sheet already supplied. Duct fabrication/ erection status- Smoke test of 08 nos duct completed iv. Exhaust fan for battery room shall be supplied by Apr'23. 3. CW Pit Readiness - Completed CCR Readiness: (L2: - 04.10.21) @) Structural Erection: Commitments: i, CCR Readiness for panel erection (17m floor): by May-23 (R1: Aug- 22, R2: 12.10.22) CCR Readiness for commissioning ~ R1: Feb-23 Supply - 4782 MT received out of total 5,000MT. Supply plan of balance ii, I b) Civil Front Readiness: a) Structural Erection: Commitments: CCR Readiness for panel erection (17m floor): by May-23 (Rt. Aug-22, R2: 12.10.22) ii, CCR Readiness for commissioning ~ R1: Feb-23 |. Supply - 4782 MT received out of total 5,000MT. Supply plan of balance ii,_17.0mtr shall be ready for panel erection by May’23-end, b) Civil Front Readiness: + Readiness for Battery Room (8.5m floor) ~ Competed (E-H) + Readiness for Battery Room (8.5m floor) - Competed (E-H) + Casting of Floors (E-H)- Status + Casting of Floors (E-H)- Status ° fl : __| [Hor Tanck Sang] boon] Vertaton] Fase —) Floor | Brick Work! | Cladding | Doar Window | Ventilation’ [False | | Lovel | Work! Wall | Window | ittumination’ | Ceiling Level Wail IMumination’ | Ceiling Finishing Fire Finishing Fire Fighting _ _ Fighting OOM | Completed | 30.05.23 | Supply 30.06.25, GUM | Completed | 30.05.23 | Supply. 30.08.22 5 isom | completed. 50. Mi completed. aa 35M Fixing [Bone2s [one [asm | Fixing! 30.06.28 [13.0 erection 13.0 M erection status [aane237] |Fi70 status 30.06.23 25.0M, = M. 29.0M. | Completed | 30.05.23 | Completed | Completed zi 230 : [29.0 | Completed | 30.05.23 | Completed | Compleed - i. Balance Staircase shall be dispatched by Apr'23. uw | Ge og Uet Kio SINo. ~ Agenda Discussion/ Commitment Ventilation system shail be ready by 30.06.23. i Balance Staircases shall be dispatched by Apr'23. ii, 17.0mtr shall be ready for panel erection by 15May'23. i. Ventilation system shall be ready by 30.06.23.(Annexure-A). iv. Inert gas system : Balance main fittingsshall be dispatched by 20.04.23. 17.0mtr Unit#1 ready by 10.05.23. 3. | MPH Structure Readiness Unit#2: TG Deck casting completed on 23.07.22 (L2: TG-2 Start- 03.03.22) i. | Structural Erection (5,600 MT): a) Supply status (M/s SREI), as on 12.04.23: a) Supply status (M/s SREI), as on 12.04.23: Description Dispatched Remark Description Dispatched Remark ] | (nwt) a (In MT) ! For TG Erection 5250 | For TG Erection 5250 | | | [Balance 350 Dispatch (250MT) Balance 350 Supply Plan | completion by 25.04.23 i and balance \100MT) by | 15"May'23. b) Detailed Fabrication Plan for Unit#2 are as follows:), as on 12.04.23: | Description Scope | Dispatched | Balance | b) Erection Plan for Unit#2 are as follows: Floor Beam | 1700,MT | 1650 50 | Balance for BC Bay 25 & | 37M floors under Major all structure(material availability by 15.05.23) by 30.05.23 | fabrication. Supply by | 16.04.23.- Supply status a and balance misc. structure including pipe rack, stair case, cantilever etc. by 30.07.23. Erection status_ | Roof Girder_| feceived. Erection status. Crane Girder_| status. | twa Borer] 6a Selence sp EY All civil floor readiness by 30.06.23(except 0.0mtr floor). "30.04.23 TG Piatform | ragressively by end- | | | May'23. T6 platform | ‘RUSt received. Erection status. column - Cantilever progressively by end: May'23 | San pe vet Ew Discussion Commitment BINo. ‘Agenda Stair Case: Tor as | *Parially dispatched no, | Bay, Grid no. | Balance (..... no.) shall be received by 20.04.23 _¢)_ Structural Readiness of MPH for TG Erection: Description Requirement Structure Erected || Steel (in MT) (amt) | Power House 5600 5100 3700 Unita Status of balance 500 MT supply Erection: Balance 1900 MT by June’23. Month-wise erection program ii. | Unit#2 TG Erection by M/s EEPL started on 25.02.23. Unit#2 TG Erection by M/s EEPL started on 25.02.23. | Status of works Status of works-Condenser-2 Side-wall erection 4/6 nos completed. Condenser -1 Water chamber alignment under-progress.Generator anchor and sole plate blue matching under-progress. Turbine Pedestal Levelling and alignment under Progress _| B__| Milestones 1_| Readiness for Start Up Power - R: Nov'22 (L2: 07.01.22) a) | Station Transformer-1 charging planned by 18-Apr-23 - status. Gund: eh gs) an Yur BHEL readiness for ST-1 charging by 18" April'23. Page § of 12 BI.No. ‘Agenda Discussion/ Commitment b) | 11 KV SWGR & 3.3. KV SWGR: (19 nos. Boards) (L2: -Civil front readiness-14.04.2021, Erection-18,02.2022) 11KV SWGR-Priority boards (04 nos-OBA, OBB, 1BA, 18B) received at site. Erection! installation status Dispatch of Balance 3.3 Kv AHP/CHP & WTP boards (03 boards) of Unit-1 by 15.04.23, - Status Unit Balance boards (03 nos) by May'23 (R1: Mar23) | Balance boards by June"23 (R1: Mar'23) 11 KV SWGR & 3.3. KV SWGR: (19 nos. Boards) (L2: -Civil front readiness-14.04.2021, Erection-18.02.2022) Supply: Unit-t 11KV SWGR-Priority boards (04 nos-0BA, OBB, 1BA, 1BB) received atsite. Erection! installation status-Completed 3.3kV Board readiness by 30.05.23. Dispatch of Balance 3.3 kV AHP/CHP & WTP boards (03 boards) of Unit-1 by 30.04.23. (Under inspection) Unit-2: ‘¢) | BUS DUCT: (L2: - 12.05.2021): i. SP Bus Duct: All 383/383 bus ducts supplied. - Erection status SPBD Structure- Structure (62 MT) — Dispatched. - Erection status ii, IP Bus Duct - 150/202 dispatched. Balance by 30.04.23 progressively. | Erection status of received BD. “d) | 220V DC System: a) DC Battery: Supplied |b) DC Battery Charger ~ All4/4 dispatched. c) DCDB (LT Switchgear): Supplied. | Readiness of 220V DC System BUS DUCT: (L2: - 12.08.2021): i, SP Bus Duct: All 383/383 bus ducts supplied. - Erection status- 65 Nos. completed. ‘SPBD Structure- Structure (62 MT) ~ Dispatched. Erection of Busduct from 3.3 kv Switchgear to UAT (Except UT) will be completed by 30” April23, ii, IP Bus Duct - 150/202 dispatched. Balance by 30.04.23, progressively. __Erection to commence in May, 23. 220V DC System: a) DC Battery: Supplied b) DC Battery Charger - All4/4 dispatched cc) DCDB (LT Switchgear): Supplied. Readiness of 220V DC System by 30" April'23. e) | LT Switchgear (MOST CRITICAL)(R: Feb’23): DCDB - Received at site. | Supply of priority boards (04 nos.: 1FA, 1DG, 1DA, ODA) - Supply | completion by Apr23: + 1DG - despatched. + ODA & 1DA- MOC applied, permission to dispatch boards without relays received. Relays shall be dispatched and installed directly at site. LT Switchgear (MOST CRITICAL)(R: Feb'23) Supply of priority boards (04 nos.: 1FA, 1DG, 1DA, 0DA) - Supply completion by Apr'23: + DCDB and 1DG Received at site + ODA & 1DA-Dispatch by 20.04.23. ws Ke — Be Page 6 of 12 So Nh SINo. ‘Agenda_ Discussion/ Commitment Dispatch by 15.04.23. i. Supply status ofODA & 1DA and Relays ii, Supply status of 1FA i. Supply status of ODA & 1DA Relays- By first week cf May'23. ii, Supply status of 1FA- Received. Relay (pending 06 relays) by 30.04.23, Dry Type Transformer (04 no.): 02 Nos DTT (2500 kVA) (required for startup power) received at site. Erection/ installation status Supply of balance 02 no. by May'23. ~ Manufacturing status Dry Type Transformer (04 no.): 02 Nos DTT (2500 kVA) (required for startup power) received at site. Erection! installation status- 02 Nos DTT erection completed. Supply of balance 02 no. by May'23. TG Box Up (Unit-1) = May’23 TURBINE-1:(L2: Complete supply 02.06.22) ‘System Readiness by (R:15.05.23): |. HPIIP Turbine: Boxed up 2. LP Turbine: under erection. 3. Generator: under installation. 4, Turbine Integral Piping (MOST CRITICAL): a) Oil System (SS piping)-Ordered on M/s GIPL: 9.81): + 4.1 MT — received at site ~ erection status + 3.5 MT under inspection. -Issue of rolled and welded pipes (8", 10" & 12") under discussion between Haridwar Quality and NTPC. - status * Balance 2 MT under fabrication and completion by 15.04.23. - status b) Steam/ Overload System (AS, CS, P91, and P92 piping): PO placed by HWR on GeM on 05.12.22. i. AS & CS piping (28T):M/s Bend Joints, Dispatch by May'23. ii, P91 piping (137): Mis Pal Engg, Raw material expectedtrom China in May'23, Dispatch fromJune to July23. P92 piping (87): Dee Development, Raw material expectedfrom China (M/s JiangsuChina) in June'23. Manufacturing and Dispatch from first week of July'23. Manufacturing status at suppliers’ works Gre ee ®t TURBINE-1:(L2: Complete supply 02.06.22) ‘System Readiness by (R:15.05.23): 1. HPIIP Turbine: Boxed up. 2. LP Turbine: under erection. 3. Generator: under installation. 4. Turbine Integral Piping (MOST CRITICAL): a) Oil System (SS piping)-Ordered on Mis GIPL: 9.57): + 4. MT- dispatched and 2MT received at site. Balance O2MT in | transit + 5.5 MT: Dispatch progressively start by April23 and completion. by 10”May'23, b) Steam/ Overload System (AS, CS, P91, and P92 piping) PO placed by HWR on GeM on05,12.22. i. AS & CS piping (287): M/s Bend Joints, Dispatch start from May'23 and completion by Jun'23. ii, P91 piping (137): M/s Pal Engg, Raw material expected in May'23 to mid-Jun’23. Supply in Jul23 iii, P92 piping (8T): M/s Dee Development Expected by May end -Mid June 23. Supply in Jul'23 iv, TG C&l (Haridwar Supplies) - (R1: Dec-22, R2: 15- Feb-23) Dispatched. Page 7 of 12 SI.No. | ____Discussion/ Commitment ‘Agenda iv. TG C&I (Haridwar Supplies) - Supplyby Apr’23. (R1: Dec-22, R2: 15- Feb-23) 5. OIL MODULE (M/s Hydac): Supply by Mar’23 (Best Effort-Feb-23) Dispatched except Motor and TCV (Temperature Control Valves). Dispatch of Motor by 15.08.23 (CGL) and TCV (Critical-fromGermany) by 15,06.23 (Required by May'23) CONDENSER (2 Nos.) (Total Tubes-52,500 no. approx): i, Tube insertion and Water Fill Test for both the condensers-1 & 2 | completed. Supply of CW Piping inside TG Hall (from Chen: Erection in progress— status &completion plan Received, v. Compensator dispatch by 10.05.23 vi, Vacuum Pump dispatch by mid-May'23. 6. OIL MODULE (M/s Hydac): Dispatched except Motor and TCV (Temperature Control Valves). Inspection of Motor on 26.04.23; Dispatch by 15.06.23 (CGL) and TCV (Critical- from Germany) by 1.08.23 (Required by May'23) ‘CONDENSER (2 Nos.) (Total Tubes-52,500 no. approx) Tube insertion and Water Fill Test for both the condensers-1 & 2 completed. Supply of CW Piping inside TG Hall (from Chennai: Received Erection in progress ~ Erection & welding of U-pipe completed. encasing work in progress& completion by 30.04.2023 ‘c)_| EOT CRANE for Unit#2, M/s Cranex(CRITICAL): EOT CRANE for Unit#2, M/s Cranex (CRITICAL): Last PRM commitments: «Rail : Erection of rail is under progress at site. Completion upto Grid i. Rail supply shall be ensured by 10.02.23 24 by 05.05.23. ii. Girder Fabrication is under progress and completion by 10.02.23; *Girder Fabrication— Fabrication completed; Dimensional iil. Load test by 20.02.23. inspection done on 13.04.23 iv. Dispatch by 28.02.23. «Load test by 28.04.23, Seen + Dispatch by 05.05.23. [3.7 on Barring Gear- Jul'23 z 7 a) | GENERATOR-1: (L2: Complete supply by 02.06.2022) GENERATOR-1: (L2: Complete supply by 02.06.2022, | i, Rotor and Stator:received at site | i. Rotor and Stator: received at site | ii, Portal crane: Commissioned and stator lifted ii, Portal crane: Commissioned and stator lifted Balance Generator supplies: Generator integral piping, baffle ring and Balance Generator supplies: carrier, PW Pump fiter unit by 30.04.23 progressively. ~ Status of supply | Generator integral piping: 1 package by April’23 ard balance 3 by and work May'23. Baffie ring and carrier by April23. PW Pump filter unit by 25.05.23, Balance major 8O1 completion by June'23. 3b) | Power Cycle piping: Power Cycle piping: For both units Power Cycle piping: Power Cycle piping: For both units See fl @iy Page 8 of 12 ot lap SINo. Agenda Discussion! Commitment Unit#7: 86671598 MIT dispatched Unit#2: 654/1295 MT dispatched Status of erection * Critical systems supply completion by May'23 (R1: by Mar-23) Unit#t: 867/1598 MT dispatched. + BFD:May'23( BFD fittings and bends dispatch ftom mi toend May'23) ‘Auxiliary Piping: May'23 Condensate: Start by Apri’23 and completion byune'23 LP Piping :June'23 Extraction, Sprays and Vents June'23 Non IBR piping: June'23. May'23 Unit#2: 646/1295 MT dispatched. Dispatch shall be completed by July'23. Status of erection- Critical systems erection will be started by May'23 after receipt of material (R1: by Mar-23) ¢) | HP and LP Heater (MOST CRITICAL) — HP and LP Heater (MOST CRITICAL) HP Heaters: i. HP Heaters: * 7A & 7B Dispatched 0 TA&7B received + 8B Dispatched. © 8B — Dispatched on 09.04.23, Erection status 0 BA- Hydro Testing Completed. Blasting & painting under Pare _ progress, Dispatch by 23.04.2023. BE ee ee eee ee eee © 9A- Shroud Assly completed. Skeleton Assly Completed. Tubing + 9A.8 98 - Hydro Test by 25.04.23, 01 no. dispatch by 30.04.23 and Completed. Bundle insertion completed. Testing by 26.04,2023 balance 01 by first week of May'23 Disp by end Aprit23, F | 0 9B- Shroud Assly completed. Skeleton Assly Completed. Tubing Loe ae ee ee ee ee Completed. Bundle insertion completed. Testing 2y 27.04.2023 | Disp by end Aprit23 Erection status- HP Heaters 7A & 7B erection under progress. - ii. LP heaters: - Erection status-3Nos. LP heaters erection completed Deaerator: (MOST CRITICAL) Deaerator: (MOST CRITICAL): dq) Feed Storage Tank from Vizag- Middle Section ~ Received at site LHS section ~ Dispatched on 10.04.23. 1m — 13.04.23 (MDCC Received) Feed Storage Tank from Vizag- Middle Section ~ Received at site. LHS section ~ Dispatched on 10.04.23, RHS section ~ 19.04.23 (MDCC Received) en ee BINo. Agenda Discussion/ Commitment ‘Supply & Erection status ) | HP By-Pass Valve: Received at site. Installation status Supply & Erection status- RHS section receipt expected by 28.04.2023. Shifting of FST sections by 15.05.2023, HP By-Pass Valve: Received at site. BHEL shall revert for HPSU unit, Installation status-Associated Piping is yet to be received. ~f) | LP By Pass Valve: (Apex level commitment: Mar'23)- Drawings approved. Manufacturing and supply status LP By Pass Valve: (Apex le Drawings approved ‘Manufacturing and supply status: Inspection schedule as below: Hydrostatic Pressure Test / seat leakage test on 16.95.2023, Inspection on 02” June'23 Dispatch - June’23 | commitment: Mar'23)- g) | TOBFP — Turbine Driven Boiler Feed Pump: (DELAYED) Dispatched except 01 TDBFP (Under final painting). Expected dispatch by 15.04.23, Erection & Supply status : Last commitments: TOBFP-1: Ready. Supply by 31.01.23 ‘TDBFP-2: Ready. Supply by 31.01.23 h) | MOBFP — Motor Driven Boiler Feed Pump: Dispatched Erection/ installation status TDBFP - Turbine Driven Boiler Feed Pump: (DELAYED) Dispatched except 01 TDBFP (MDCC received). Expected dispatch by 20.04.23, MDBFP — Motor Driven Boiler Feed Pump: Dispatched, Mechanical Coupling dispatch byend April23. Erection/ installation status- Erection under progress i) | Drip Pump - Dispatched. Erection! installation status d Drain Cooler- Dispatched Erection! installation status Drip Pump - Dispatched. Erection! installation status-Erection under progress Drain Cooler- Dispatched Erection! installation status- Installation in progress. 4. | Boiler Light Up a) [Cad ‘Award of C&l Erection agency: Reverse Auction on 12.04.23, | Award expected by 20.04.23. (R1: Jan-23, R2: Feb-23) _ er ‘Award of C&l Erection agency: Price bid open L1 bidder is M/s Narmada. Work shalll be awarded by 30.04.23, aor Page Wo 2 ae ui wh” BINo. | ‘Agenda Discussion! Commitment b)_| Feed Water System, |__Feed Water System | CPU: System Readiness (M/s MahimaUdyog) CPU: System Readiness (Wis MahimaUdyog) BBU & FOP for DM approved. BBU & FOP for DM approved. 1. Drawings- Total drawings 106 (65 mechanical and 41 C&l) Under 1. Drawings- Approved. submission, Stamping of al basic drawings completed. 52/106 drawings |» Neutralization pit: Work under progress. . | Status of work : Work in Part-1 is in progress while area of Part-2 will Contra or Une lees be taken up after area handed over by M/s. LMB. Status of work 3. Supply: All BOI’s ordered. |3. Supply: All BOl's ordered, + MS plates (53 MT): Received + MS plates (53 MT): Received. «Service Vessels (03 nos. for each unit)-01 no inspection + Service Vessels (03 nos. for each unit)-01 no inspection completed and ‘completed and dispaich by 30.04.23; 02 nos. by “5.05.23 dispatch by 18.04.23.02 nos. by 30.04.23 Balance 03 nos. for Unit-2 by Balance 03 nos. for Unit-2 by June’23. June'23. «Atmospheric tanks- 08/9 nos. dispatched. Balance 01 no. by + Atmospheric tanks- 08/9 nos dispatched. Balance 01 no. by 15.04.23. 20.04.23. + Valves- 130/329 vaives dispatched, Balance 199 by 30.04.23. = Valves- 130/329 valves dispatched. Balance 20 MDC in + Resins- 47/75 cum dispatched. Balance by June’23 progress dispatch by 30.04.23. Balance 179 by May 23. + Resins- 47/75 cum dispatched. Balance by June 23. |e) | DG Set (1.5 MVA) ISG- B'luru: 1 All 03 DG sets dispatched ‘All 03 DG sets dispatched Erection/ installation status Erection! installation status- DG set erection will star from 25.04.23 ‘@) Supply and installation of Fire Protection Systom- inert Gas System (FDA & | Supply and installation of Fire Protection System- Inert Gas System IGES) from Hyderabad (FDA & IGES) from Hyderabad + FDA. dispatched + FDA. dispatched. | + IGES System: Pipe forIGES cispatched on 16.07.2028, Fiting partly + IGES System: Pipe for IGES dispatched on 16.01.2023. Fitting dispatched, balance by 15.04.23. Cylinders by May'23. partially dispatched, balance by 30.04.23. Cylinders oy May'23. Status of erection! installation Status of erectiont installation @)_| Transformer Yard: = - : ri - os Gre Page 11 of 12 a os BINo. ___ Agenda Discussion! Commitment | 1. Completion of Civil Works for: 7,_Completion of Civil Works for: | GT foundation completed. GT foundation completed UT foundation completed UT foundation completed 2. Supply: a. GTI by Jan'23, GT2 by Feb'23. GT3 by Mar'23. (Delayed) - Status 2. Supply: b. UT supply: Supply by June'23 (R1: by Feb’23, (DELAYED) ‘a. 1st GT is planned in May-23. (Subsequent to BHEL Bhopal's proposal for conditional MDCC will be processed.) | b. GTs 2,3 are planned in Juk-23 UT supply: Supply by June'23 (R1: by Feb’23. (DELAYED) Shunt Reactor Bushing dispatch to site by 22.04.23. [57] Drawings: i Drawings: a ] ‘Area for Car Parking THOCIL informed that area will be earmarked after completion of Service Building 6 | Any other Points with the permission of Chair ‘Any other Points with the permission of Chair Deputation of Commissioning Engineer of BHEL ‘Available by 15" May'23, erotd dikuaten 4 For morDrsay and SPER Preyae ety anna Food bea J pry, prretiattir Re > Be o/ ales) Wac tna’ SS B ; Hg) (Pe he pera PRM of of Khurja STPP (2660 MW) Package: Pig. F baihacy aading rg. = én, Co Cony vat chunk Agency: THICIL, NTPC, Cmautlards roses ones ae Name Designation Mob. No. Signature | * 1S Kuna Shae d ei +\ Ta Chao ? lon KK Gi ape Com (es) 3 1Gn A Mesthug Gens) teat (Tun _| |S sesh Aesaruk (194) 49°30 "wag W— 5 S. 6. Neon’ Dem (Oly) Ths 701 Sus 6} Zon. Assotred | $252210778 pon 7 [MUKUL shan [Bama | asnauracs | See? 8 | Nayom Retr [Managarg)| 2126295824 | (9. 8 | Gajendva Singh Aam (Oe) | W4INo3629 | Ge 10 | Kobe} Prarioad G Mayr | 94 31920v9¢ Ge | Suni(Y@ Sunde | Mevociate | 9050997 Se, ha 12 | QR. uD AS HRCA. Osseriels 9bsP 990729 'R Ye | ¢-ehabiogac Bssoghy | asrcurtiob Ce | 14 | Rojesh Kumow Yadav Dy 6M 941) 33 0/22 hin 18 | rewind. Kumar Yul, Dy 61-0) 999 #05 bb | BD (6) INTAKIAG ALAM lam céPiLy | 97532700 Name+ NF] RM. Datars, GM (Elect Tq0g5200057 | WSL 10)| Freon Kuwav [mamceal\ Guip2ags 19. | Arnon Roi SeEngtRs) | bdr sto hen fw 20 | Subhendu sekhar Sahoo Sr. Eng (RS) AABEIGEAOR ced ay | 6.5. Palo) Manager, W449 208 B55 Sy ar] PK, Beheoe Dance) | artiosesreu Ge | Quan Ave Dl Vem QIMKS Raricayg) 25] Munve CnSs Bem Cals) [94120520 W 76] Strotlest Dijon [ASM (Med) | 44 (20256197 ex 2t.— Kent Ravel SE [ N73) 655 FAT 2e PC Theplieel — SMH syoacurs — Kyo PRIM of of Khurja STPP (: Package: 1 Package + Agency: “Brel Venue: Khurja Date: 9.04. Si No. Name Designation Mob. No. Signature 1 | Vibe tuner Goulras teecvagcee| Oy — cae Marmagn 9999655282 | Bea 3 | Sautabh Horde | Dy 9950620950 | Paul? Uv 4 | Shiviomma Dy_myr | 779220404 An 5 |Sondeep Catal loy-may | Isyne oveg, z| 6 | ANLL kumae MAL] Dum | geqq4sisa| Aw 7 Rarer Mow Quooboos Ay Des 8 | Ait ke Thatew | Gy Mgr | §6 ladin) KE 9 | Ajay naidefan Damn (wmy | o¢orgguey | wlet > | MY © | Hiconda Cockav [ram cur) 96 009625: Lesirhe J "| echovym Poaate wit V6S099 (#22 Uyr7 | 1218 R Gato koe Mennyes | 97S 2876/ & 13 | Rojeew Kumoy Sr Moneys} 1695400909 bow | VAC. Ree Gm. REAMOUIY A? Shey — f = 18 | De Retern bh GM Sasrkow a 16.) C.K. Nameth, Rey SB93 6 R94 hl, Z 1] Pradeep Kumar Gr Maser | 44a 07 20 @ 18 | Kv Sing (Menegn | 155843377 AN |

You might also like