GENERAL NOTES :

2900 1. All dimensions are in MM. Unless specified. Do not scale.


Only figured dimensions be followed.
2. Grade of Concrete for Foundation, Columns, Beams shall be
M-25 unless otherwise mentioned .

29
400

00
200 3. Grade of concrete in Container is M 30 .

00
29
4. All steel in reinforcement shall be High Yield Strength
Deformed Bars , confirming to IS: 1786-1979 or TATA -
2-16mm Ø+ 1-20mmØ 2.8m long TMT.

600
Stirrups 2L-8Ø @ 140/220 c/c 5. Clear cover to reinforcement shall be :-

6600
BRACING Columns 40mm Foundation Beams 40 mm
600 BEAM BB1 2-16mm Ø+ 1-20mmØ 2.8m long 400 Beams 25mm
200 Slabs in contact with water face 25 mm
BRACING BEAM BB1 Slabs away from water face 20 mm
6. Bending and fixing or bars in reinforcement be done as IS:
200x600(M25) 2502-1963 and IS: 5525-1968. Lap length for joining the bars

00
29
shall not be less than the development length for deformed

29
00
bars.
7. The design data for foundation bearing capacity considered as
10.56 T/m2 as per soil report.
8. Not more than 50% bars are spliced at any point. No splicing
2900 be done within column or joint with another beam.
9. Closed stirrups @ 150mm c/c be provided over the entire
splice length.
BRACING BEAM PLAN RING BEAM B3 PLAN 10. Development length for deformed bars in tension and
compression for M-25 concrete is as under :
Bar dia. Development length in Cms.
Tension Compression
20 mm 94.0 cms. 75.2 cms.
16 mm 75.2 cms. 60.2 cms.
4L Stps 8Ø @ 100 c/c 4L Stps 8Ø @ 100 c/c 4L Stps 8Ø @ 100 c/c 4L Stps 8Ø @ 100 c/c 4L Stps 8Ø @ 100 c/c
2-12mmØ 8Ø @ 180 c/c in Lightening
12 mm 56.4 cms. 45.1 cms.
2L Stps 8Ø @ 130 c/c both directions
600 600 600 600
450 around man-hole Arrester
10 mm 47.0 cms, 37.6 cms.
B3

100

100
80
B2
10-20mmØ M.H.
Stps 2L-12 mmØ @ 100 c/c 5-20mmØ
400 8 mm 37.6 cm. 30.1 cms
7-20mm Ø Hoops 750

400
6-16Ø 4nos-12Ø 12 At least 3 nos. Column Ties should be within the beam

500
400
650

Stps 8Ø @ 100 c/c 150X150

700
650 2-10mm Ø 6-16Ø
Section at Man Hole
Ties 8Ø @100c/c
depth.

200
[600x750] Opening

100
B2
10-20mmØ
7-16mm Ø hoops
5-20mmØ
RING BEAM B2 Top Spherical 200 800 200
Top Spherical
14 Stirrups in Beam be started from column edge and in no
1200 2-12mmØ at top & Dome 100 th. 4-12Ø
Details of Reinforcement in
400x400 bottom at the periphery 2L Stps 6Ø @ 120 c/c
Dome 100 th.
case it shall be more than 50mm from edge.
450
B3

450 Ring Beam [B2] [400x400] at Junction of Wall & Conical Dome of MH opening DETAIL's OF CHIMNEY
2675
RING BEAM B3
Details of Reinforcement in
450x650 Lantern Ring
IMPORTANT NOTES :
Cols 150x150 1. 120x120mm splay be provided at the joint of Wall & Domes
Ring Beam B3 [450x650] above Columns Beam 200x200
2. Water Proofing admixture such as "DONCRETE RMW" or equivalent
confirming to IS: 2645 1999, be mixed as per manufacturer's specification,
200 800 200
at the time of making the concrete for RETAINING WALL AND FLOOR SLAB
to increase workability, and cohesion and reducing air gaps in the concrete.
2L Stps 8Ø @ 130 c/c Plan showing details of Reinforcement at 3. Water proof treatment to be provided for faces of Domes & Walls with
Plan of Chimney "SUPERCRETE-SB" [an acrylic co-polymer based emulsion cement based
the opening of Man Hole [600x750]

B1
3-16mmØ
200 water proofing coating] of Don Building Chemicals (India) Pvt. Ltd. or
equivalent or any other standard water proofing treatment be done on the

200
4-12Ø inner face of wall & Bottom and Conical Domes.

300
4-12Ø 4. To increase the workability of concrete, an air-entraining agent such as
3-16mmØ "CONCRETE N" of Don Building Chemicals (India) Pvt. Ltd. or equivalent be

B1
RING BEAM B1 used.
Details of Reinforcement in 5. At the construction joints, KEY HOLE be provided. The old concreted
Ring Beam [B1] [200x200] at Junction of Wall & Top Spherical Dome 200x200 surface should be thoroughly cleaned free of LATINS, DUST or any loose
concrete before placing concrete above it.
6. Cubes 15cm x 15cms x 15cms be molded and tested for M-25 concrete
before actual concreting is carried out to ascertain the strength achieved.

ER
EV 1
N TILM CB No. Revision/Issue Date
CA BEA
R
VE
ILE B1
A NT AM C 200
C BE
4-16mmØ 450
275 Kltres OVER HEAD TANK
450

2-16mmØ
Section at CB1-CB1
WITH 14M HIGH STAGING
2L Stps 8Ø @ 110 c/c Beam B1
AT
CB1
PURA VILLAGE W/S SCHEME
00

Beam CB1 7-12mmØ


To
250x450-->350 7-12mmØ ps
CA
28

-
@ 12m
N
BE TIL 12 m BLOCK AASPUR DEVSARADHAKWA
350

0 Ø 450
450

AM EV 1. 14 Flight in 2240mm rise c/ D.


CB ER 2. Tread = 200mm
c S.
-
@ 12m
DISTRICT PRATAPGARH (U.P)
1 3. Rise = 160mm Beam CB1 4-12mmØ 15 m
4. Slab Thickness = 140mm 4-12mmØ 56 0 Ø
0 c/
c
5. Main Steel 12mmØ @ 120 c/c
6. D.S. - 12mmØ @ 150 c/c 880 CONSULTING AGENCY :-

160
85 To
CB1

0 12 ps
7. Cantilever Beam 250x350 at alt mm
er
200
-
@ 12m
SWASTIK TEST HOUSE
landing level na Ø @ 12 m 2L Stps 8Ø @ 110 c/c 645B/489 VASHISHTHAPURAM JANKIPURAM ,LUCKNOW
(a) 6-16mmØ at Top te 1 0 Ø
CA BE

b 20 c/
(b) 3-16mmØ at bottom up ars c c
be /c
N AM

(c) 2L Stps 8mmØ @ 110 c/c 7-12mmØ Beam B1


TI

nt
7-12mmØ FOR M/S ASHOKA, CONTRACTORS
LE CB

200x450-->350
56
VE 1

0 2/61 VISHESH KHAND


80
85

350
0
R

450

450
8 2675 GOMTI NAGAR LUCKNOW
4-12mmØ Beam B1 Beam CB1

3-16mmØ
880

- DETAILS OF
R Details of Reinforcement in Stairs Slab
VE REINFORCEMENT
ILE B1
A NT AM C CANTILEVER [140mm th.] and Beam [CB1] - BEAMS, STAIRS AND
C BE
BEAM CB1
CHIMNEY
As per Scale
STAIR CASE PLAN