Item Description

Unit Qty Material Amount

BUIDERS WORK MAIN BUILDING

SUBSTRUCTURES (ALL
PROVISIONAL)

A Clear the site of all undergrowths and


burn the arising 225 -
-
EXCAVATIONS -
Excavations including trimming sides
of excavations; -
maintaining and supporting sides and
keeping free from water, -
mud and fallen material -
-
B Excavate pit for column bases not
exceeding 1.5m deep commencing from
the reduced levels
30 -
-
C Excavate for foundation trench ditto 99 -
-
D Extra-over excavations in any position
for excavating in rock (all classes)
2 -
-
Disposal; -
-
E Take delivery of surplus excavated
material and spread on site or cart away
as where directed
45 -
-
Fillings; -
-
A Backfill selected excavated material
around foundations 85 -
-
B Approved imported hardcore filling,
spread, levelled, well rammed and
consolidated in 100 mm thick layers to
receive concrete surface bed (m.s)
41 -
-
-
-
-
C Level and blind hardcore surfaces with
12-19mm quarry dust to receive concrete
surface bed (m.s).
240 -
-
Anti-Termite Treatment; -
TAKE DELIVERY ON SITE AND
APPLY -
D "Termidor EC" chemical anti-termite
treatment to top surfaces of hardcore
blinding executed by Insecta Limited or
other equal and approved under a ten-
year guarantee and provide guarantee
certificate
225 -
-
Damp-proof Membrane; -
-
A 1000 Gauge polythene sheeting laid over
blinded hardcore bed (measured nett -
allow for laps)
225 -
-
Concrete Works; -
-
Plain concrete class 15 (1:4:8) as
described in:- -
-
B 50mm thick blinding under strip
foundations 88 -
-
C Ditto under column bases 24 -
-
Reinforced Concrete class 25/20 as
described in; -
-
D Strip foundation 15 -
-
E Column bases 7 -
-
F Foundation Columns 1 -
-
G 100mm thick surface bed 225 -
-
Steel Reinforcement; -
-
B.R.C. Mesh -
-
A Mesh fabric reinforcement complying
with B. S 4483 Ref A142 embedded in
floor slab (measured net with no
allowance for minimum of 225mm. laps)
including tying wire and supporting as
required
225 -
-
Labour Only for fix re-bar reinforcement
including bending, hooks, tying wire,
cutting spacers and supporting all in
position as described:
-
-
High yield square twisted reinforcement
bars to B. S 4461 as described in:-
-
-
-
-
B Asoreted Bars 1,405 -
-
FORMWORK -
Fair-faced formwork in marine ply as
described to:
-
A Sides of strip foundations 28 -
-
B Ditto column bases 25 -
-
C Vertical sides of foundation columns 18 -
-
D Edges of slab 75 - 150mm high 100 -
Foundation Walling; -
-
Natural Quarry Stone Walling in mortar
(1:3) including 25mm wide x 20 gauge
hoop iron reinforcement in alternate
courses as described in:-
-
E 200mm thick walling 207 -
-
Plinth Finishes; -
-
F 15mm thick Cement and sand (1:4)
screed rendering to plinths 50 -
Sundries -
G Provide for keeping the whole of the
excavations free from all water during
excecution of the works by pumping or
other such means as may be necessary

1 -
-
H upholding sides of excavations against
collapse from whatever cause during
execution of the works by planking,
strutting or other means as may be
necessary
1 -
-
Carried to summary -
-
COLLECTION -
-
-
From Page No. 2/ 1 -
-
-
From Page No. 2/ 2 -
-
-
From Page No. 2/ 3 -
-
-
From Page No. 2/ 4 -
-
-
From Page No. 2/ 5 -
-
TOTAL -
-
-
Vibrated Reinforced Concrete class 30
as described in:- -
A Beams 8 -
-
B Columns 5 -
-
REINFORCEMENT -
Supply and fix bar reinforcement
including bending, hooks, tying wire,
cutting spacers and supporting all in
position as described:
-
-
High yield square twisted reinforcement
bars to B. S 4461 as described in:-
-
-
C Assorted bars 733 -
-
lay Precast Concrete class 25 finished
fair on all exposed surfaces including
hoisting to the heights indicated and all
the necessary strutting to retain members
in position during casting

-
-
A 100mm wide x 200mm high x 2000mm 29
long precast lintel including any
necessary reinforcement, projection bars
and hoisting approximately 2100mm
above ground level

-
Fair-faced formwork in marine ply as
described to:- -
B Sides and soffits of beams 103 -
-
C Vertical sides of columns 81 -
-
-
ELEMENT NO. 03: -
-
WALLING; -
-
External walling; -
-
Approved load bearing machine dressed
masonry '1st quality Thika' stone or
equal and approved bedded and jointed in
cement and sand mortar (1:3) reinforced
with 25mm wide x 20 gauge hoop iron in
alternate courses as described in:

-
-
A 200mm thick walling 275 -
-
Internal Walling; -
-
Approved load bearing machine dressed
masonry '1st quality Thika' stone or
equal and approved bedded and jointed in
cement and sand mortar (1:3) reinforced
with 25mm wide x 20 gauge hoop iron in
alternate courses as described in:

-
-
B 200mm thick walling 215 -
-
C 100mm ditto 25 -
-
-
DOORS -
A steel casement door 900X2100 2 -
-
B 5mm glazing to french doors 2 -
-
C prime door frames 100-200mm 10 -
-
D prime general surfaces of french and grill 8
doors -
-
E 100x76x2mm brass hinges 2 -
-
F 100mm butt hinges 11 -
-
G 3-lever lock set 11 -
-
H 4-lever metal casement door lock 2 -
-
I 38mm dia door stop 11 -
-
J single leaf solid flush door 900x2100 11 -
-
K architrave quandrant n.e 100 girth 36 -
-
WINDOWS -
-
A 1200x1500mm high windows 4 -
-
B 1800X1500mm high windows 2 -
-
C 1500x1500mm windows 6 -
-
D 800x900mm high ditto 4 -
-
E 4mm clear sheet glass 30 -
-
F Ditto obscure glass 4 -
-
G 300x100mm window cill 41 -
-
H 200x25mm window board mahogany 41 -
-
I 25mm quadrant 41 -
-
J paintint to boards 150-225mm girth 41 -
-
K prime general surfaces of windows 30 -
-
L vanish boards 20 -
-
TOTALS -
-
FINISHES -
A 32mm floor screed to receive tiles 240 -
-
B 300x300 ceramic tiles 60 -
-
floor parquet 50 -
-
Terrazo 30 -
-
C 15mm thick plaster to external wall 175 -
-
D Paint to rendered walls 175 -
-
E plaster to internal walls 280 -
-
F 10mm thick baking to receive tiles 60 -
-
G 300x200 wall tiles 60 -
-
H paint to internal walls 280 -
-
-
FITTINGS -
I Kitchen cabinets 1 -
-
J Add 3% profit 1 -
-
K General Attendance 1 -
-
ROOF -
A 100x50mm rafter 60 -
-
B 100x50mm tie beam 50 -
-
C 100x50mm kingpost 6 -
-
D 100x50mm struts and ties 25 -
-
E 100x50mm wall plate 48 -
-
F 200x50mm ridge board 7 -
-
G 100x50mm common rafters 60 -
-
H Ditto valley and hip rafters 18 -
-
I Ditto underpurlins 15 -
-
J 250x25mm thick fascia 80 -
-
K IT5 prepainted sheets 270 -
-
L P.v.c T & G on eaves 18 -
-
M 150 dia rain water gutter 80 -
-
N 100 dia rainwater downpipe 8 -
-
O extra over downpipe 100mm dia 4 -
-
P painting to chipboard eaves boarding 100 -
-
Q painting to fascia board 100 -
-
R ceiling Chip board and timber
240
blundering at 600c/c and painted -
-
-
COLLECTION -
-
-
From Page No. 2/ 1 -
-
-
From Page No. 2/ 2 -
-
-
From Page No. 2/ 3 -
-
-
From Page No. 2/ 4 -
-
-
From Page No. 2/ 5 -
-
-
From Page No. 2/ 6 -
-
-
From Page No. 2/ 9 -
-
TOTAL CARRIED FORWARD -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Equipment Amount Manpower Amount Subcontractor Amount Cost rate

- 19 4,250 - 19
- - - -
- - - -

- - - -

- - - -
- - - -
- - - -

- 340 10,200 - 340


- - - -
- 340 33,587 - 340
- - - -

- 587 1,173 - 587


- - - -
- - - -
- - - -

485 21,813 36 1,620 - 521


- - - -
- - - -
- - - -

- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -

- - - -

- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -

- - - -
- - - -

- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -

- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -

- - - -
- - - -

- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Amount

4,250
-
-

-
-
-

10,200
-
33,587
-

1,173
-
-
-

23,433
-
-
-

-
-

-
-
-
-
-

-
-
-

-
-
-
-

-
-
-
-

-
-

-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-

-
-

-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-

-
-
-
-
-

-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-

-
-
-
-

-
-

-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
MANPOWER BASIC FOOD ACCOMODATION TRANSPORT COST PER DAY

UNSKILLED 600.00 50.00 80.00 80.00 810.00


SKILLED 1,500.00 50.00 80.00 80.00 1,710.00
WORKING DAYS WORKING HOURS COST OER HR

26.00 8.00 101.25


26.00 8.00 213.75
MANPOWER HIRE RATE PER DAY OPERATOR FUEL ELECTRICITY

MASON HAMMER 10.00


TINDO 10.00
TALIMBO 10.00
CIRCULAR SAW 150.00 1,000.00 30.00
ANGLE SAW 400.00 1,000.00 30.00
VIBRATOR POKER 1,600.00 1,000.00 500.00
Mixer machine 6,500.00 1,000.00 1,000.00
Welding machine 3,500.00 1,000.00 500.00
dumpy level 3,500.00 1,000.00
Wheel loader 80,000.00 1,500.00 10,740.00
excavator 160,000.00 1,500.00 14,320.00
grinder 1,500.00 1,000.00 500.00
Drill 1,500.00 1,000.00 500.00
Tile cutter 1,500.00 500.00
lorry 20,000.00 1,500.00 3,580.00
Spade 20.00
Saruru 20.00

SKILLED 1,500.00 50.00 80.00


MAINTENANCE TOTAL

10.00
10.00
10.00
10.00 1,190.00
20.00 1,450.00
100.00 3,200.00
250.00 8,750.00
100.00 5,100.00
4,500.00
5,000.00 97,240.00
5,000.00 180,820.00
3,000.00
3,000.00
2,000.00
800.00 25,880.00
20.00
20.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
80.00 1,710.00
MANPOWER
ACTIVITY REQUIRMENT COST PER DAY

1 Clear the site of all undergrowths and burn the arising


1) HELPER 5 810.00

tools 5 40.00

TOTAL
Excavate pit for column bases not exceeding 1.5m deep
2 commencing from the reduced levels 12 810.00

tools 12 40.00

TOTAL

3 Excavate for foundation trench ditto 39.5136 810.00

tools 39.5136 40.00

TOTAL

Extra-over excavations in any position for excavating in


4 rock (all classes) 1.33333333333333 810.00

tools 1.33333333333333 70.00

TOTAL

Take delivery of surplus excavated material and spread on


5 site or cart away as where directed

equipment 0.18 123,120.00

labor 2 810.00

TOTAL

Backfill selected excavated material around foundations


PRODUCTIVITY

TOTAL COST QTY UNIT PER COST PER UNIT

4,050.00 225 M2 DAY 18.00

200.00 225 0.89

4,250.00 18.89

9,720.00 30 M3 DAY 324.00

480.00 30 16.00
-
10,200.00 340.00
-
32,006.02 98.784 M3 324.00

1,580.54 98.784 16.00

-
33,586.56 340.00
-

1,080.00 2 540.00

93.33 2 46.67
-
1,173.33 586.67
-

- 45 -

21,812.60 45 484.72
-
1,620.00 45 36.00
-
23,432.60 520.72
- #DIV/0!
- 85 -
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
- #DIV/0!
ACTIVITY UNIT QTY RATE AMOUNT

You might also like