Key Plan:

BASEMENT 01 BASEMENT 01
-3.600M SSL -3.600M SSL

ROAD 12.50M NEIGHBOUR PLOT

A B C D E F G H J K L M N P Q R S T U V W X Y
104150
PLOT LIMIT
3450 4550 2750 2300 2600 2000 1300 4000 8000 8000 8000 8000 8000 8000 4000 3300 2600 2400 3150 4600 8250 4900 PLOT LIMIT
NOTES:
107.43m
E:490340.877 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS

4C
N:2770044.110 ARE IN METER UNLESS OTHERWISE NOTED.
SIDE-4

6D
5C
2. ALL DIMENSIONS & LEVELS SHALL BE VERIFIED ON SITE

SET BACK
E:490285.354

5.00m
3C N:2770136.078 PRIOR TO INSTALLATION.

50
m
63
33

SET BACK
8.

27

6C

50
7.50m
00
LINEAR SECTION

44
4D
SECTION - AA

5D
SE
7. B

PLOT LIMIT
50 A

TOWER SET BACK LINE


T
m CK

0
E:490349.251 70
14 LEGENDS AND SYMBOLS

33
N:2770042.041

3D
00

50
80

TOWER SET BACK LINE


23
2C

14
69
5
80
50
1C

00
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23
33

TRENCH DETAIL
49

2D
260 THK. RC SLAB 260 THK. RC SLAB
1 SCALE 1:20

24
11900

5.00m

33

1D
SET BACK

50
25
PEDESTRIAN CROSS
50

DRIVE WAY 5.50 m WIDE


SCHEDULE OF OPENING / SLEEVES
F.F.L -4.00

26
S.S.L -4.00 TAG NO. SIZE OPENING / SLEEVES FOR SERVICE QTY.
51

curb stone
as per details
RAMP
UP

SLOPE 1:12

27
PRD
22
S/S GRADE 316 CAT 260 THK. RC F.F.L
SLAB -3.90
SPEED HUMP
2500

LADDER WITH STAINLESS S.S.L -4.00


STEEL FIXINGS ACCESS FIRE
LIFT LOBBY

28
FOR MAINTENANCE LIFT-01
TOWER-02 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29
BLOCK-A
21 F.F.L -3.90
S.S.L -4.00
2500

VENTILATION GUEST GUEST


SHAFT LIFT-01 LIFT LOBBY LIFT-02
DRIVE WAY 5.50 m WIDE

TOWER-02
BLOCK-B S/S GRADE 316 CAT
20 F.F.L -3.90
LADDER WITH STAINLESS
STEEL FIXINGS ACCESS
S.S.L -4.00 FOR MAINTENANCE
TEL.CAB ELE.CAB
2500

GUEST
TC1 LIFT-03
52
F.F.L -3.90
19 260 THK. RC SLAB
S.S.L -4.00
57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 curb stone
as per details VENTILATION
276
SLOPE 1:12

SHAFT

RAMP
SLOPE 1:12
UP

53 PEDESTRIAN CROSS
RAMP
UP
6000

PS1
SPEED HUMP
50.90m

54 TOWER-02 277 7.50m


DRIVE WAY 5.50 m WIDE
SET BACK
PEDESTRIAN CROSS

18
UPUP UP
F.F.L -5.70
278
2500

F.F.L -3.90 STEEL STAND FOR FIRE HOSE


S.S.L -5.70 CABINET BOTTOM OF
S.S.L -3.90
CABINET 270mm FROM FFL
STAIR-T02-A

17 55 56 DNDN F.F.L -4.00 UP F.F.L -5.70


S.S.L -4.00 UP S.S.L -5.70

S.S.L -3.90
F.F.L -3.90
260 THK. RC SLAB 275

STAIR-T02-B
279
3550

92 91 90 89 88 87 86 85 84 83 82 81 80 79
DN 78 77
MANEUVERING
16 AREA 274 280
93
A
4250

TC2
102 273 281
A
94

15 ETS PUMP ROOM DRIVE WAY 5.50 m WIDE


91.31 m²
F.F.L -4.00
260 THK.
F.F.L -4.00RC SLAB SPEED HUMP S.S.L -4.00
VENTILATION
S.S.L -4.00 SHAFT
350 mm THK 350 mm THK 350 mm THK 103
COL. DROP COL. DROP COL. DROP 272 282
UP UP
6400

A
SMDB-LL-B1 SMDB-T1-B
VENTILATION
95 PS1 PS3 PS3 PS3
104 SHAFT

BANK-3
SUBSTATION FINAL PS1 271 283

CAP.
EMCC-LL-B1-FAN
OPENING SIZES AND 260 THK. RC SLAB
A
LV ROOM FINAL
LOCATION IN SLAB WILL
96 97PER DEWA 98
BE AS SUBSTATION 99OPENING SIZES AND
100 101

DRIVE WAY 5.50 m WIDE


PS1 SUBSTATION LOCATION IN SLAB WILL
REQUIREMENTS AND 67.59 LV LV
ROOM CAP.

14 SUB METER 260 THK. RC SLAB PANEL-2 BANK-2 BE AS PER DEWA

.C.
FINAL APPROVAL.

FREESIA
ETS ROOM ROOM FINAL APPROVAL.
F.F.L -3.85

NG L.L
L.V.ROOM
191.95 m² S.S.L -4.00 73.83 m²

PANEL-3
270 284
EMDB-LL-B1

S.S.L -4.75

LV
260 THK. RC SLAB
3550

CT I
ETS ROOM
105

ELE
wall 2.4m height

RA
300 THK. RC SLAB LV CAP.
RO

CT
PANEL-1 BANK-1 T
PS2 PS2 PS2 MEC ON
HA NICA L W ORK S C
F.F.L -3.85
PS2 PS2
S.S.L -4.00
13 269 285
350 mm THK 350 mm THK 350 mm THK
E:490392.826 350 mm THK
COL. DROP COL. DROP COL. DROP COL. DROP
RAMP UP FROM
BASEMENT-02
3500

RAMP UP TO
N:2770068.347

A
GR FLR.
A

SLOPE 10.00 % LENGTH 39.00 M


F.F.L -4.00
106
DN
DN EXPANSION JOINT
12 PS2 PS2 PS2
S.S.L -4.00
UP FROM 350 mm THK PS1 AS/ STR.DETAILS PS1
B2 T0 B1 COL. DROP PS1
F.F.L -4.00 F.F.L -4.00
700

S.S.L -4.00 S.S.L -4.00


PS2
PS2 PS2 PS1
11 GRP PANEL TANK PS1 PS1

118.51m
RAMP DN FROM
350 mm THK
EXPANSION JOINT DOWN FROM
BASEMENT-02
RAMP DN TO

SIDE-3
SIZE - 5mX4mX2M

GR. FLR.
B1 T0 B2 COL. DROP
107

ROAD
AS/ STR.DETAILS SLOPE 10.00 % LENGTH 39.00 M
3600

CAPACITY 32M3 UP

350 mm THK 268 286


GRP PANEL TANK
10 SIZE - 1.5X1.5X2M WAVE & KIDS POOL &
PS2 COL. DROP PS2 350 mm THK
COL. DROP WATER GARDEN & WALL
ROAD 31.00M

CAPACITY 3.6M3 PS2 PUMP ROOM


550

IRRIGATION PUMP ROOM UP


SIDE-1

28.17m2

A
125.37 m² 350 mm THK F.F.L -3.85
PS1 PS1 PS1 PS1 PS1 267 287

DRIVE WAY 5.50 m WIDE


S.S.L -4.00
09 F.F.L -3.85 EXPANSION JOINT 350 mm THK
PS1
EXPANSION JOINT
COL. DROP
260 THK. RC SLAB
S.S.L -4.00
GRP PANEL TANK AS/ STR.DETAILS COL. DROP AS/ STR.DETAILS
4750

SIZE - 1.5mX1mX1M
107000

VENTILATION
350 mm THK

SHAFT
A
129 COL. DROP

PS1
F.F.L -4.00
S.S.L -4.00 288
08 A 128 PB5
130
MANEUVERING 266 IFC DRAWINGS REFERENCE
AREA 127 126 125 124 123 122 121 120 119 118 117 116 115 114 113
PS1 PS1 108 289
LPG H/L LPG H/L

211 DWG. NO. DRAWING NAME DATE REV


PS1
6200

6000

PS1

131 PS1 PS1 PS1 265


13960 A-102 BASEMENT-01 FLOOR PLAN 28.03.2023
109 290

DRIVE WAY 5.50 m WIDE


212 210 F.F.L -4.00 GBC-BO-ST-SD
S.S.L -4.00 BASEMENT-01 OVERALL SLAB GA DRAWING 15.03.2023
-GA-B1-001
DRIVE WAY 5.50 m WIDE

07 132
ME-DR-
BASEMENT 02 HIGH LEVEL DRAINAGE LAYOUT 27.02.2023
DRIVE WAY 5.50 m WIDE 098-HL
213 EXTENT OF WATER 209 F.F.L -4.00 110 264 291
ME-DR-
TANK BELOW 136
74 S.S.L -4.00 BASEMENT 01 LOW LEVEL DRAINAGE LAYOUT 27.02.2023
099-LL
VENTILATION
ME-WS-
SHAFT BASEMENT 01 WATER SUPPLY LAYOUT 27.02.2023
099-00
8300

214 208 PS1


LPG H/L
PS1 PS1 LPG H/L
PS1 111 263 292
ME-AC-
BASEMENT 01 FLOOR AC LAYOUT 27.02.2023
099-00
PS1 PS1
133 PS1 ME-VE-
207 136 137 138 139 140 141 142
260 143RC SLAB
THK. 144 145 146 147 148 149 150 293 BASEMENT 01 FLOOR VENTILATION LAYOUT 27.02.2023
215 112 262 099-00
12030
ME-SM- BASEMENT 01 FLOOR SMOKE VENTILATION
27.02.2023
099-00 LAYOUT
06
50.00m

F.F.L -5.70
UP UP UP UP F.F.L -5.70
ME-FP-
S.S.L -5.70
F.F.L -3.90 F.F.L -3.90 S.S.L -5.70
294 BASEMENT 01 FLOOR FIRE FIGHTING LAYOUT 27.02.2023
261 099-00
STAIR-T01-B

216 S.S.L -3.90 S.S.L -3.90


3350

F.F.L -4.00
STAIR-T01-A

S.S.L -4.00 EE-P-


134 BASEMENT 01 FLOOR SMALL POWER LAYOUT 27.02.2023
DN DN 099-00
05 15.00m EE-P-
217 LPG H/L
165 164 163 162 161 160 159 158 157 156 155 154 153 152 151 LPG H/L
260 BACK
SET295 SUBSTATION ROOM-1 DETAILS 27.02.2023
PS1
LPG H/L
PS1 PS1 PS1 PS1 PS1 LPG H/L
PS1 500-07
257 258 EE-P-
SUBSTATION ROOM-2 DETAILS 27.02.2023
4350

206 PS1
TC3 500-08
135 296
218 259 EE-P-
LV ROOM-01 DETAILS 27.02.2023
500-02
04 EE-P-
LV ROOM-02 DETAILS 27.02.2023
500-03
SPEED HUMP
219 297
DRIVE WAY 5.50 m WIDE
SPEED HUMP
14739-1-2022 SUBSTATION-1 LAYOUT 27.02.2023 0
F.F.L -4.00
F.F.L -4.00 SPEED HUMP S.S.L -4.00
TC4
S.S.L -4.00
14739-2-2022 SUBSTATION-2 LAYOUT 27.02.2023 0
8300

UP UP
220 RAMP
TOWER-01
RAMP
EE-TC-
SLOPE 1:12

SLOPE 1:12

PS1 BASEMENT 01 FLOOR TELECOM LAYOUT 27.02.2023


LPG H/L
PS1 PS1 PS1 PS1 PS1 LPG H/L
PS1 099-00
PEDESTRIAN CROSS
F.F.L -3.90
260S.S.L
THK.-4.00
RC SLAB 260 THK. RC SLAB
F.F.L -3.90 VENTILATION
221 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 S.S.L -4.00 SHAFT
TOWER SET BACK LINE

TEL.CAB ELE.CAB

03 S/S GRADE 316 CAT


255 256 LADDER WITH STAINLESS
S/S GRADE 316 CAT STEEL FIXINGS ACCESS
GUEST GUEST FOR MAINTENANCE
LADDER WITH STAINLESS
VENTILATION
SHAFT STEEL FIXINGS ACCESS LIFT-01 LIFT LOBBY LIFT LOBBY LIFT-03 254
FOR MAINTENANCE TOWER-01 TOWER-01 260 THK. RC SLAB
5000

BLOCK-A BLOCK-B
F.F.L -3.90 F.F.L -3.90
S.S.L -4.00
5.00m FIRE S.S.L -4.00 GUEST
LIFT-01 LIFT-04 253
SET BACK 205 204 203 202 201 200 199 198 197 196 195 194 193 192 191 190 189 188 187 186

02 REV DATE REVISION BY CHK APP


curb stone
RAMP

RAMP

as per details
UP
SLOPE 1:12 SLOPE 1:12
UP
Project:
curb stone
as per details PROPOSED 2B-G-9 FLOOR RESIDENTIAL
2

BUILDING ON
22

PEDESTRIAN CROSS
E:490435.631
N:2770094.189 DRIVE WAY 5.50 m WIDE DDA PLOT NO: 6750293
25

F.F.L -4.00 135


3

21
22

S.S.L -4.00
AT STUDIO CITY, DUBAI - UAE
12750

PLOT LIMIT
260 THK. RC SLAB (BEACH OASIS)
25
4
22

25
0
Client:
5
22
T 50m

00

226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249
C

34

4B
A
SE 7.
B
33
50
4A

21
01 .2 3B
1 m
00
3A

80

0
80 Consultant:
14
80

E:490385.390
50
14

TOWER SET BACK LINE


N:2770199.613
77
0

SET BACK

SET BACK
5.00m

5.00m

00
34
2B
10

9m

PLOT LIMIT
35
33

ARCHITECTURAL DESIGN CONSULTANCY LLC


9
6B
6A
70

4.
2A

97.68m
1B

Main Contractor:
PLOT LIMIT SIDE-2
5A
1A

5B

E:490390.234
N:2770198.408
ROAD 46.00M
P.O. BOX 121385,
E:490440.719 DUBAI, UNITED ARAB EMIRATES
N:2770114.783 WWW.GARDINIA.AE

MEP Contractor:

FREESIA ELECTROMECHANICAL
WORKS CONTRACTING LLC.
SHEIKH ZAYED ROAD, DUBAI, UAE
Drawing Title:
BASEMENT - 01 FLOOR
SLAB BUILDERS WORK LAYOUT
OVERALL
Job No: Scale Date Drawn Checked Approved
1:200 @A0 06.04.2022 SHJ IA SM
BASEMENT - 1 FLOOR SLAB BUILDERS WORK LAYOUT OVERALL
1 SCALE 1:200
Drawing No: Rev No.
FEM-BO-SD-B1-MEP-BW-099 0
6400
A Key Plan:
SMDB-LL-B1 SMDB-T1-B
VENTILATION
95 PS1 PS3 PS3 PS3 104 SHAFT

BANK-3
SUBSTATION FINAL PS1
271 283

CAP.
EMCC-LL-B1-FAN
OPENING SIZES AND 260 THK. RC SLAB
A
LV ROOM FINAL
LOCATION IN SLAB WILL
96 97PER DEWA 98
BE AS 99OPENING SIZES AND
100 101

DRIVE WAY 5.50 m WIDE


PS1 LV LOCATION IN SLAB WILL
REQUIREMENTS AND SUBSTATION LV ROOM CAP.

14 SUB METER
ROOM
FINAL APPROVAL.
260 THK. RC SLAB PANEL-2 BANK-2 BE AS PER DEWA
ETS ROOM F.F.L -3.85 FINAL APPROVAL.
191.95 m² S.S.L -4.00

PANEL-3
270 284

EMDB-LL-B1
S.S.L -4.75

LV
260 THK. RC SLAB

3550
ETS ROOM
wall 2.4m height 105
300 THK. RC SLAB LV CAP.
PANEL-1 BANK-1
PS2 PS2 PS2
PS2 F.F.L -3.85 PS2
S.S.L -4.00
13 269 285
350 mm THK 350 mm THK 350 mm THK
E:490392.826 350 mm THK
COL. DROP COL. DROP COL. DROP COL. DROP

RAMP UP FROM
BASEMENT-02
3500

RAMP UP TO
N:2770068.347

A
GR FLR.
A

A
SLOPE 10.00 % LENGTH 39.00 M
F.F.L -4.00
106 NOTES:
DN
DN
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS
12 PS2 PS2 PS2
S.S.L -4.00
350 mm THK
PS1
PS1 PS1
ARE IN METER UNLESS OTHERWISE NOTED.
COL. DROP
F.F.L -4.00 F.F.L -4.00
2. ALL DIMENSIONS & LEVELS SHALL BE VERIFIED ON SITE
700

S.S.L -4.00 S.S.L -4.00 PS2


PRIOR TO INSTALLATION.
PS2 PS2 PS1
11 PS1 PS1

118.51m
RAMP DN FROM
350 mm THK

BASEMENT-02
RAMP DN TO

GR. FLR.
COL. DROP
107

SIDE-3
SLOPE 10.00 % LENGTH 39.00 M
3600

ROAD
UP
LEGENDS AND SYMBOLS
350 mm THK 268 286
10 WAVE & KIDS POOL &
PS2 COL. DROP PS2
350 mm THK
COL. DROP WATER GARDEN & WALL
PS2 PUMP ROOM
550

IRRIGATION PUMP ROOM


ROAD 31.00M

28.17m2
SIDE-1

A
125.37 m² 350 mm THK F.F.L -3.85
PS1 PS1 PS1 PS1 PS1
267 287

DRIVE WAY 5.50 m WIDE


S.S.L -4.00
09 F.F.L -3.85 350 mm THK
PS1 COL. DROP
260 THK. RC SLAB
S.S.L -4.00 COL. DROP
4750
107000

VENTILATION
350 mm THK

SHAFT
A
129 COL. DROP

PS1

F.F.L -4.00
S.S.L -4.00 288
08 A 128 PB5
130
MANEUVERING 266
AREA 127 126 125 124 123 122 121 120 119 118 117 116 115 114 113 PRD

PS1
211
PS1 LPG H/L LPG H/L

108 289
PS1
6200

6000
PS1

131 PS1 PS1 PS1 265


13960

109 290

DRIVE WAY 5.50 m WIDE


212 210 F.F.L -4.00
S.S.L -4.00

DRIVE WAY 5.50 m WIDE


07 132

DRIVE WAY 5.50 m WIDE


213 209 F.F.L -4.00 110 264 291
74 S.S.L -4.00
136

VENTILATION
SHAFT
8300

214 208 PS1


LPG H/L PS1 PS1 LPG H/L PS1 111 263 292

PS1 PS1
133 PS1

207 136 137 138 139 140 141 142


260 143RC SLAB
THK. 144 145 146 147 148 149 150 293
215 112 262
12030

06
50.00m

UP UP
216 261 294
3350

F.F.L -4.00
S.S.L -4.00
134
DN DN

05
15.00m
217 165 164 163 162 161 160 159 158 157 156 155 154 153 152 151 260 BACK
SET295

.C.
FREESIA
LPG H/L LPG H/L

NG L.L
PS1
LPG H/L PS1 PS1 PS1 PS1 PS1 LPG H/L PS1

CT I
ELE
257 258

RA
RO

CT
NT
4350

MEC CO
TC3 HA NICA L W ORK S
206 135
PS1

218 259 296

04

219 DRIVE WAY 5.50 m WIDE


297
F.F.L -4.00
F.F.L -4.00 S.S.L -4.00
TC4
S.S.L -4.00
8300

UP UP
220 RAMP
TOWER-01
RAMP
SLOPE 1:12

SLOPE 1:12
PS1 PS1 PS1 PS1 PS1
LPG H/L
PS1 PS1 LPG H/L

F.F.L -3.90
260S.S.L
THK.-4.00
RC SLAB 260 THK. RC SLAB
F.F.L -3.90 VENTILATION
221 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 S.S.L -4.00 SHAFT
TOWER SET BACK LINE

TEL.CAB ELE.CAB

03
255 256
GUEST GUEST IFC DRAWINGS REFERENCE
VENTILATION
SHAFT
LIFT-01 LIFT LOBBY LIFT LOBBY LIFT-03 254
TOWER-01 TOWER-01 260 THK. RC SLAB DWG. NO. DRAWING NAME DATE REV
5000

BLOCK-A BLOCK-B
F.F.L -3.90 F.F.L -3.90 A-102 BASEMENT-01 FLOOR PLAN 28.03.2023
S.S.L -4.00
5.00m FIRE S.S.L -4.00 GUEST GBC-BO-ST-SD
BASEMENT-01 OVERALL SLAB GA DRAWING 15.03.2023
LIFT-01 LIFT-04 253
SET BACK 205 204 203 202 201 200 199 198 197 196 195 194 193 192 191 190 189 188 187 186 -GA-B1-001
ME-DR-
BASEMENT 02 HIGH LEVEL DRAINAGE LAYOUT 27.02.2023
098-HL
02 ME-DR-
RAMP

RAMP
BASEMENT 01 LOW LEVEL DRAINAGE LAYOUT 27.02.2023
SLOPE 1:12 SLOPE 1:12 099-LL
UP UP
ME-WS-
BASEMENT 01 WATER SUPPLY LAYOUT 27.02.2023
099-00
ME-AC-
BASEMENT 01 FLOOR AC LAYOUT 27.02.2023
099-00
2

ME-VE-
22

BASEMENT 01 FLOOR VENTILATION LAYOUT 27.02.2023


099-00
E:490435.631 ME-SM- BASEMENT 01 FLOOR SMOKE VENTILATION
27.02.2023
099-00 LAYOUT
N:2770094.189 DRIVE WAY 5.50 m WIDE
ME-FP-

25
F.F.L -4.00 135 BASEMENT 01 FLOOR FIRE FIGHTING LAYOUT 27.02.2023
3

2 1
22

099-00

2
S.S.L -4.00
EE-P-
12750

BASEMENT 01 FLOOR SMALL POWER LAYOUT 27.02.2023


099-00
PLOT LIMIT EE-P-
260 THK. RC SLAB

25
SUBSTATION ROOM-1 DETAILS 27.02.2023
4

500-07
22

1
EE-P-
SUBSTATION ROOM-2 DETAILS 27.02.2023
500-08
EE-P-

25
LV ROOM-01 DETAILS 27.02.2023
5

500-02
22

0
EE-P-
LV ROOM-02 DETAILS 27.02.2023
T 50m

500-03
K

00
226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249
C

34
14739-1-2022 SUBSTATION-1 LAYOUT 27.02.2023 0

4B
A
SE 7.
B
33
50

14739-2-2022 SUBSTATION-2 LAYOUT 27.02.2023 0


4A

EE-TC-
BASEMENT 01 FLOOR TELECOM LAYOUT 27.02.2023
099-00
21

01

3B
.2
1m

00
3A

80
8 00
80

14
E:490385.390
50

TOWER SET BACK LINE


14

N:2770199.613
77
0

REV DATE REVISION BY CHK APP


Project:
BASEMENT - 1 FLOOR SLAB BUILDERS WORK LAYOUT PART - 1
1 SCALE 1:125
PROPOSED 2B-G-9 FLOOR RESIDENTIAL
BUILDING ON
DDA PLOT NO: 6750293
AT STUDIO CITY, DUBAI - UAE
(BEACH OASIS)
SCHEDULE OF OPENING / SLEEVES Client:

TAG NO. SIZE OPENING / SLEEVES FOR SERVICE QTY.

BASEMENT 01 BASEMENT 01
-3.600M SSL -3.600M SSL Consultant:

ARCHITECTURAL DESIGN CONSULTANCY LLC

Main Contractor:

P.O. BOX 121385,

SECTION - AA LINEAR SECTION DUBAI, UNITED ARAB EMIRATES


WWW.GARDINIA.AE

MEP Contractor:

FREESIA ELECTROMECHANICAL
WORKS CONTRACTING LLC.
SHEIKH ZAYED ROAD, DUBAI, UAE
TRENCH DETAIL Drawing Title:
1 SCALE 1:20
BASEMENT - 01 FLOOR
SLAB BUILDERS WORK LAYOUT
PART-1
Job No: Scale Date Drawn Checked Approved
1:125 @A0 08.04.2023 SHJ IA SM
Drawing No: Rev No.
FEM-BO-SD-B1-MEP-BW-099-01 0
Key Plan:

ROAD 12.50M NEIGHBOUR PLOT

A B C D E F G H J K L M N P Q R S T U V W X Y
104150
PLOT LIMIT
3450 4550 2750 2300 2600 2000 1300 4000 8000 8000 8000 8000 8000 8000 4000 3300 2600 2400 3150 4600 8250 4900 PLOT LIMIT
107.43m
E:490340.877

4C
N:2770044.110 6D
SIDE-4

5C
NOTES:

SET BACK
E:490285.354 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS

5.00m
3C N:2770136.078

50
m ARE IN METER UNLESS OTHERWISE NOTED.

33

SET BACK
63
2. ALL DIMENSIONS & LEVELS SHALL BE VERIFIED ON SITE

27

6C

50
8.

7.50m
PRIOR TO INSTALLATION.

00

44
SE 4D

5D
7.
PLOT LIMIT T

50
B TOWER SET BACK LINE
A

m
C
0
E:490349.251 LEGENDS AND SYMBOLS
70 K
14
00

33
N:2770042.041

3D
80

50
TOWER SET BACK LINE
23 2C

14
69
5
80
50
1C

0
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23
33

0
49
260 THK. RC SLAB 260 THK. RC SLAB 2D

24
11900

5.00m
1D
PRD

33
SET BACK

50
25
50

DRIVE WAY 5.50 m WIDE


F.F.L -4.00

26
S.S.L -4.00
51

RAMP
UP

SLOPE 1:12

27
22
260 THK. RC F.F.L
SLAB -3.90
2500

S.S.L -4.00
FIRE
LIFT LOBBY

28
LIFT-01
TOWER-02 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29
BLOCK-A
21 F.F.L -3.90
S.S.L -4.00
2500

VENTILATION GUEST GUEST


SHAFT LIFT-01 LIFT LOBBY LIFT-02
DRIVE WAY 5.50 m WIDE

TOWER-02
BLOCK-B
20
TEL.CAB ELE.CAB
2500

GUEST
TC1 LIFT-03
52
F.F.L -3.90
19 260 THK. RC SLAB
S.S.L -4.00
57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76
VENTILATION
276
SLOPE 1:12

SHAFT

RAMP
SLOPE 1:12
UP

53 RAMP
UP
6000

PS1
50.90m

54 TOWER-02 277 7.50m


DRIVE WAY 5.50 m WIDE
SET BACK
18

L.L.C.
FREESIA
40
UPUP
278

00
2500

T ING
ELE

AC
C
RO

TR
ON

T
ME
CHA N SC
ICA L W ORK
17 55 56 DNDN F.F.L -4.00
S.S.L -4.00 UP
260 THK. RC SLAB 275 279
3550

92 91 90 89 88 87 86 85 84 83 82 81 80 79
DN 78 77
MANEUVERING
16 AREA 274 280
93
A
4250

TC2
102 273 281
A
94

15 ETS PUMP ROOM DRIVE WAY 5.50 m WIDE


91.31 m² F.F.L -4.00 IFC DRAWINGS REFERENCE
260 THK.
F.F.L -4.00RC SLAB S.S.L -4.00
VENTILATION
S.S.L -4.00 SHAFT
350 mm THK 350 mm THK 350 mm THK 103 DWG. NO. DRAWING NAME DATE REV
COL. DROP COL. DROP COL. DROP 272 282
A-102 BASEMENT-01 FLOOR PLAN 28.03.2023
UP UP
6400

GBC-BO-ST-SD
A
SMDB-LL-B1 SMDB-T1-B BASEMENT-01 OVERALL SLAB GA DRAWING 15.03.2023
VENTILATION -GA-B1-001
95 PS1 PS3 PS3 PS3
104 SHAFT ME-DR-
BASEMENT 02 HIGH LEVEL DRAINAGE LAYOUT 27.02.2023

BANK-3
SUBSTATION FINAL PS1
271 283

CAP.
EMCC-LL-B1-FAN
098-HL
OPENING SIZES AND 260 THK. RC SLAB ME-DR-
A
LV ROOM FINAL BASEMENT 01 LOW LEVEL DRAINAGE LAYOUT 27.02.2023
LOCATION IN SLAB WILL 099-LL
96 97PER DEWA 98
BE AS 99OPENING SIZES AND
100 101

DRIVE WAY 5.50 m WIDE


LOCATION IN SLAB WILL ME-WS-
PS1
REQUIREMENTS AND SUBSTATION LV CAP. BASEMENT 01 WATER SUPPLY LAYOUT 27.02.2023
LV ROOM 099-00
14 SUB METER
ROOM
FINAL APPROVAL.
260 THK. RC SLAB PANEL-2 BANK-2 BE AS PER DEWA
ME-AC-
ETS ROOM F.F.L -3.85 FINAL APPROVAL.
099-00
BASEMENT 01 FLOOR AC LAYOUT 27.02.2023
191.95 m² S.S.L -4.00

PANEL-3
270 284 ME-VE-

EMDB-LL-B1
S.S.L -4.75 BASEMENT 01 FLOOR VENTILATION LAYOUT 27.02.2023

LV
260 THK. RC SLAB
3550

ETS ROOM
105 099-00
wall 2.4m height
300 THK. RC SLAB LV CAP. ME-SM- BASEMENT 01 FLOOR SMOKE VENTILATION
PANEL-1 BANK-1 27.02.2023
PS2 PS2 PS2 099-00 LAYOUT
PS2 F.F.L -3.85 PS2
S.S.L -4.00 ME-FP-
BASEMENT 01 FLOOR FIRE FIGHTING LAYOUT 27.02.2023
13 269 285
099-00
EE-P-
350 mm THK 350 mm THK 350 mm THK
BASEMENT 01 FLOOR SMALL POWER LAYOUT 27.02.2023
099-00
E:490392.826 350 mm THK
COL. DROP COL. DROP COL. DROP COL. DROP EE-P-
RAMP UP FROM
BASEMENT-02
3500

RAMP UP TO
SUBSTATION ROOM-1 DETAILS 27.02.2023
N:2770068.347

A
GR FLR.
500-07
A

SLOPE 10.00 % LENGTH 39.00 M


F.F.L -4.00
106
DN
DN EE-P-
SUBSTATION ROOM-2 DETAILS 27.02.2023
12 PS2 PS2 PS2
S.S.L -4.00
350 mm THK PS1 PS1
500-08
COL. DROP PS1 EE-P-
LV ROOM-01 DETAILS 27.02.2023
500-02
F.F.L -4.00 F.F.L -4.00
700

S.S.L -4.00 S.S.L -4.00 EE-P-


PS2 LV ROOM-02 DETAILS 27.02.2023
500-03
PS2 PS2 PS1
11 PS1 PS1
14739-1-2022 SUBSTATION-1 LAYOUT 27.02.2023 0

118.51m
RAMP DN FROM
350 mm THK
BASEMENT-02
RAMP DN TO

GR. FLR.
COL. DROP
107

SIDE-3
SLOPE 10.00 % LENGTH 39.00 M
3600

ROAD
UP 14739-2-2022 SUBSTATION-2 LAYOUT 27.02.2023 0

350 mm THK 268 286 EE-TC-


BASEMENT 01 FLOOR TELECOM LAYOUT 27.02.2023
099-00
10 WAVE & KIDS POOL &
PS2 COL. DROP PS2
350 mm THK
COL. DROP WATER GARDEN & WALL
PS2 PUMP ROOM
550

IRRIGATION PUMP ROOM


ROAD 31.00M

28.17m2
SIDE-1

A
125.37 m² 350 mm THK F.F.L -3.85
PS1 PS1 PS1 PS1 PS1
267 287

DRIVE WAY 5.50 m WIDE


S.S.L -4.00
09 F.F.L -3.85 350 mm THK
PS1 COL. DROP
260 THK. RC SLAB
S.S.L -4.00 COL. DROP
4750

REV DATE REVISION BY CHK APP


Project:
BASEMENT - 1 FLOOR SLAB BUILDERS WORK LAYOUT PART - 2 PROPOSED 2B-G-9 FLOOR RESIDENTIAL
1 SCALE 1:125 BUILDING ON
DDA PLOT NO: 6750293
AT STUDIO CITY, DUBAI - UAE
(BEACH OASIS)
SCHEDULE OF OPENING / SLEEVES Client:
TAG NO. SIZE OPENING / SLEEVES FOR SERVICE QTY.

BASEMENT 01 BASEMENT 01
-3.600M SSL -3.600M SSL
Consultant:

ARCHITECTURAL DESIGN CONSULTANCY LLC

Main Contractor:

P.O. BOX 121385,


SECTION - AA LINEAR SECTION DUBAI, UNITED ARAB EMIRATES
WWW.GARDINIA.AE

MEP Contractor:

FREESIA ELECTROMECHANICAL
WORKS CONTRACTING LLC.

TRENCH DETAIL SHEIKH ZAYED ROAD, DUBAI, UAE

1 SCALE 1:20
Drawing Title:
BASEMENT - 02 FLOOR
SLAB BUILDERS WORK LAYOUT
PART-1
Job No: Scale Date Drawn Checked Approved
1:125 @A0 08.04.2023 SHJ IA SM
Drawing No: Rev No.
FEM-BO-SD-B1-MEP-BW-099-02 0