Professional Documents
Culture Documents
Fem Bo SD B1 Mep BW 099
Fem Bo SD B1 Mep BW 099
BASEMENT 01 BASEMENT 01
-3.600M SSL -3.600M SSL
A B C D E F G H J K L M N P Q R S T U V W X Y
104150
PLOT LIMIT
3450 4550 2750 2300 2600 2000 1300 4000 8000 8000 8000 8000 8000 8000 4000 3300 2600 2400 3150 4600 8250 4900 PLOT LIMIT
NOTES:
107.43m
E:490340.877 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS
4C
N:2770044.110 ARE IN METER UNLESS OTHERWISE NOTED.
SIDE-4
6D
5C
2. ALL DIMENSIONS & LEVELS SHALL BE VERIFIED ON SITE
SET BACK
E:490285.354
5.00m
3C N:2770136.078 PRIOR TO INSTALLATION.
50
m
63
33
SET BACK
8.
27
6C
50
7.50m
00
LINEAR SECTION
44
4D
SECTION - AA
5D
SE
7. B
PLOT LIMIT
50 A
0
E:490349.251 70
14 LEGENDS AND SYMBOLS
33
N:2770042.041
3D
00
50
80
14
69
5
80
50
1C
00
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23
33
TRENCH DETAIL
49
2D
260 THK. RC SLAB 260 THK. RC SLAB
1 SCALE 1:20
24
11900
5.00m
33
1D
SET BACK
50
25
PEDESTRIAN CROSS
50
26
S.S.L -4.00 TAG NO. SIZE OPENING / SLEEVES FOR SERVICE QTY.
51
curb stone
as per details
RAMP
UP
SLOPE 1:12
27
PRD
22
S/S GRADE 316 CAT 260 THK. RC F.F.L
SLAB -3.90
SPEED HUMP
2500
28
FOR MAINTENANCE LIFT-01
TOWER-02 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29
BLOCK-A
21 F.F.L -3.90
S.S.L -4.00
2500
TOWER-02
BLOCK-B S/S GRADE 316 CAT
20 F.F.L -3.90
LADDER WITH STAINLESS
STEEL FIXINGS ACCESS
S.S.L -4.00 FOR MAINTENANCE
TEL.CAB ELE.CAB
2500
GUEST
TC1 LIFT-03
52
F.F.L -3.90
19 260 THK. RC SLAB
S.S.L -4.00
57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 curb stone
as per details VENTILATION
276
SLOPE 1:12
SHAFT
RAMP
SLOPE 1:12
UP
53 PEDESTRIAN CROSS
RAMP
UP
6000
PS1
SPEED HUMP
50.90m
18
UPUP UP
F.F.L -5.70
278
2500
S.S.L -3.90
F.F.L -3.90
260 THK. RC SLAB 275
STAIR-T02-B
279
3550
92 91 90 89 88 87 86 85 84 83 82 81 80 79
DN 78 77
MANEUVERING
16 AREA 274 280
93
A
4250
TC2
102 273 281
A
94
A
SMDB-LL-B1 SMDB-T1-B
VENTILATION
95 PS1 PS3 PS3 PS3
104 SHAFT
BANK-3
SUBSTATION FINAL PS1 271 283
CAP.
EMCC-LL-B1-FAN
OPENING SIZES AND 260 THK. RC SLAB
A
LV ROOM FINAL
LOCATION IN SLAB WILL
96 97PER DEWA 98
BE AS SUBSTATION 99OPENING SIZES AND
100 101
.C.
FINAL APPROVAL.
FREESIA
ETS ROOM ROOM FINAL APPROVAL.
F.F.L -3.85
NG L.L
L.V.ROOM
191.95 m² S.S.L -4.00 73.83 m²
PANEL-3
270 284
EMDB-LL-B1
S.S.L -4.75
LV
260 THK. RC SLAB
3550
CT I
ETS ROOM
105
ELE
wall 2.4m height
RA
300 THK. RC SLAB LV CAP.
RO
CT
PANEL-1 BANK-1 T
PS2 PS2 PS2 MEC ON
HA NICA L W ORK S C
F.F.L -3.85
PS2 PS2
S.S.L -4.00
13 269 285
350 mm THK 350 mm THK 350 mm THK
E:490392.826 350 mm THK
COL. DROP COL. DROP COL. DROP COL. DROP
RAMP UP FROM
BASEMENT-02
3500
RAMP UP TO
N:2770068.347
A
GR FLR.
A
118.51m
RAMP DN FROM
350 mm THK
EXPANSION JOINT DOWN FROM
BASEMENT-02
RAMP DN TO
SIDE-3
SIZE - 5mX4mX2M
GR. FLR.
B1 T0 B2 COL. DROP
107
ROAD
AS/ STR.DETAILS SLOPE 10.00 % LENGTH 39.00 M
3600
CAPACITY 32M3 UP
28.17m2
A
125.37 m² 350 mm THK F.F.L -3.85
PS1 PS1 PS1 PS1 PS1 267 287
SIZE - 1.5mX1mX1M
107000
VENTILATION
350 mm THK
SHAFT
A
129 COL. DROP
PS1
F.F.L -4.00
S.S.L -4.00 288
08 A 128 PB5
130
MANEUVERING 266 IFC DRAWINGS REFERENCE
AREA 127 126 125 124 123 122 121 120 119 118 117 116 115 114 113
PS1 PS1 108 289
LPG H/L LPG H/L
6000
PS1
07 132
ME-DR-
BASEMENT 02 HIGH LEVEL DRAINAGE LAYOUT 27.02.2023
DRIVE WAY 5.50 m WIDE 098-HL
213 EXTENT OF WATER 209 F.F.L -4.00 110 264 291
ME-DR-
TANK BELOW 136
74 S.S.L -4.00 BASEMENT 01 LOW LEVEL DRAINAGE LAYOUT 27.02.2023
099-LL
VENTILATION
ME-WS-
SHAFT BASEMENT 01 WATER SUPPLY LAYOUT 27.02.2023
099-00
8300
F.F.L -5.70
UP UP UP UP F.F.L -5.70
ME-FP-
S.S.L -5.70
F.F.L -3.90 F.F.L -3.90 S.S.L -5.70
294 BASEMENT 01 FLOOR FIRE FIGHTING LAYOUT 27.02.2023
261 099-00
STAIR-T01-B
F.F.L -4.00
STAIR-T01-A
206 PS1
TC3 500-08
135 296
218 259 EE-P-
LV ROOM-01 DETAILS 27.02.2023
500-02
04 EE-P-
LV ROOM-02 DETAILS 27.02.2023
500-03
SPEED HUMP
219 297
DRIVE WAY 5.50 m WIDE
SPEED HUMP
14739-1-2022 SUBSTATION-1 LAYOUT 27.02.2023 0
F.F.L -4.00
F.F.L -4.00 SPEED HUMP S.S.L -4.00
TC4
S.S.L -4.00
14739-2-2022 SUBSTATION-2 LAYOUT 27.02.2023 0
8300
UP UP
220 RAMP
TOWER-01
RAMP
EE-TC-
SLOPE 1:12
SLOPE 1:12
TEL.CAB ELE.CAB
BLOCK-A BLOCK-B
F.F.L -3.90 F.F.L -3.90
S.S.L -4.00
5.00m FIRE S.S.L -4.00 GUEST
LIFT-01 LIFT-04 253
SET BACK 205 204 203 202 201 200 199 198 197 196 195 194 193 192 191 190 189 188 187 186
RAMP
as per details
UP
SLOPE 1:12 SLOPE 1:12
UP
Project:
curb stone
as per details PROPOSED 2B-G-9 FLOOR RESIDENTIAL
2
BUILDING ON
22
PEDESTRIAN CROSS
E:490435.631
N:2770094.189 DRIVE WAY 5.50 m WIDE DDA PLOT NO: 6750293
25
21
22
S.S.L -4.00
AT STUDIO CITY, DUBAI - UAE
12750
PLOT LIMIT
260 THK. RC SLAB (BEACH OASIS)
25
4
22
25
0
Client:
5
22
T 50m
00
226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249
C
34
4B
A
SE 7.
B
33
50
4A
21
01 .2 3B
1 m
00
3A
80
0
80 Consultant:
14
80
E:490385.390
50
14
SET BACK
SET BACK
5.00m
5.00m
00
34
2B
10
9m
PLOT LIMIT
35
33
4.
2A
97.68m
1B
Main Contractor:
PLOT LIMIT SIDE-2
5A
1A
5B
E:490390.234
N:2770198.408
ROAD 46.00M
P.O. BOX 121385,
E:490440.719 DUBAI, UNITED ARAB EMIRATES
N:2770114.783 WWW.GARDINIA.AE
MEP Contractor:
FREESIA ELECTROMECHANICAL
WORKS CONTRACTING LLC.
SHEIKH ZAYED ROAD, DUBAI, UAE
Drawing Title:
BASEMENT - 01 FLOOR
SLAB BUILDERS WORK LAYOUT
OVERALL
Job No: Scale Date Drawn Checked Approved
1:200 @A0 06.04.2022 SHJ IA SM
BASEMENT - 1 FLOOR SLAB BUILDERS WORK LAYOUT OVERALL
1 SCALE 1:200
Drawing No: Rev No.
FEM-BO-SD-B1-MEP-BW-099 0
6400
A Key Plan:
SMDB-LL-B1 SMDB-T1-B
VENTILATION
95 PS1 PS3 PS3 PS3 104 SHAFT
BANK-3
SUBSTATION FINAL PS1
271 283
CAP.
EMCC-LL-B1-FAN
OPENING SIZES AND 260 THK. RC SLAB
A
LV ROOM FINAL
LOCATION IN SLAB WILL
96 97PER DEWA 98
BE AS 99OPENING SIZES AND
100 101
14 SUB METER
ROOM
FINAL APPROVAL.
260 THK. RC SLAB PANEL-2 BANK-2 BE AS PER DEWA
ETS ROOM F.F.L -3.85 FINAL APPROVAL.
191.95 m² S.S.L -4.00
PANEL-3
270 284
EMDB-LL-B1
S.S.L -4.75
LV
260 THK. RC SLAB
3550
ETS ROOM
wall 2.4m height 105
300 THK. RC SLAB LV CAP.
PANEL-1 BANK-1
PS2 PS2 PS2
PS2 F.F.L -3.85 PS2
S.S.L -4.00
13 269 285
350 mm THK 350 mm THK 350 mm THK
E:490392.826 350 mm THK
COL. DROP COL. DROP COL. DROP COL. DROP
RAMP UP FROM
BASEMENT-02
3500
RAMP UP TO
N:2770068.347
A
GR FLR.
A
A
SLOPE 10.00 % LENGTH 39.00 M
F.F.L -4.00
106 NOTES:
DN
DN
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS
12 PS2 PS2 PS2
S.S.L -4.00
350 mm THK
PS1
PS1 PS1
ARE IN METER UNLESS OTHERWISE NOTED.
COL. DROP
F.F.L -4.00 F.F.L -4.00
2. ALL DIMENSIONS & LEVELS SHALL BE VERIFIED ON SITE
700
118.51m
RAMP DN FROM
350 mm THK
BASEMENT-02
RAMP DN TO
GR. FLR.
COL. DROP
107
SIDE-3
SLOPE 10.00 % LENGTH 39.00 M
3600
ROAD
UP
LEGENDS AND SYMBOLS
350 mm THK 268 286
10 WAVE & KIDS POOL &
PS2 COL. DROP PS2
350 mm THK
COL. DROP WATER GARDEN & WALL
PS2 PUMP ROOM
550
28.17m2
SIDE-1
A
125.37 m² 350 mm THK F.F.L -3.85
PS1 PS1 PS1 PS1 PS1
267 287
VENTILATION
350 mm THK
SHAFT
A
129 COL. DROP
PS1
F.F.L -4.00
S.S.L -4.00 288
08 A 128 PB5
130
MANEUVERING 266
AREA 127 126 125 124 123 122 121 120 119 118 117 116 115 114 113 PRD
PS1
211
PS1 LPG H/L LPG H/L
108 289
PS1
6200
6000
PS1
109 290
VENTILATION
SHAFT
8300
PS1 PS1
133 PS1
06
50.00m
UP UP
216 261 294
3350
F.F.L -4.00
S.S.L -4.00
134
DN DN
05
15.00m
217 165 164 163 162 161 160 159 158 157 156 155 154 153 152 151 260 BACK
SET295
.C.
FREESIA
LPG H/L LPG H/L
NG L.L
PS1
LPG H/L PS1 PS1 PS1 PS1 PS1 LPG H/L PS1
CT I
ELE
257 258
RA
RO
CT
NT
4350
MEC CO
TC3 HA NICA L W ORK S
206 135
PS1
04
UP UP
220 RAMP
TOWER-01
RAMP
SLOPE 1:12
SLOPE 1:12
PS1 PS1 PS1 PS1 PS1
LPG H/L
PS1 PS1 LPG H/L
F.F.L -3.90
260S.S.L
THK.-4.00
RC SLAB 260 THK. RC SLAB
F.F.L -3.90 VENTILATION
221 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 S.S.L -4.00 SHAFT
TOWER SET BACK LINE
TEL.CAB ELE.CAB
03
255 256
GUEST GUEST IFC DRAWINGS REFERENCE
VENTILATION
SHAFT
LIFT-01 LIFT LOBBY LIFT LOBBY LIFT-03 254
TOWER-01 TOWER-01 260 THK. RC SLAB DWG. NO. DRAWING NAME DATE REV
5000
BLOCK-A BLOCK-B
F.F.L -3.90 F.F.L -3.90 A-102 BASEMENT-01 FLOOR PLAN 28.03.2023
S.S.L -4.00
5.00m FIRE S.S.L -4.00 GUEST GBC-BO-ST-SD
BASEMENT-01 OVERALL SLAB GA DRAWING 15.03.2023
LIFT-01 LIFT-04 253
SET BACK 205 204 203 202 201 200 199 198 197 196 195 194 193 192 191 190 189 188 187 186 -GA-B1-001
ME-DR-
BASEMENT 02 HIGH LEVEL DRAINAGE LAYOUT 27.02.2023
098-HL
02 ME-DR-
RAMP
RAMP
BASEMENT 01 LOW LEVEL DRAINAGE LAYOUT 27.02.2023
SLOPE 1:12 SLOPE 1:12 099-LL
UP UP
ME-WS-
BASEMENT 01 WATER SUPPLY LAYOUT 27.02.2023
099-00
ME-AC-
BASEMENT 01 FLOOR AC LAYOUT 27.02.2023
099-00
2
ME-VE-
22
25
F.F.L -4.00 135 BASEMENT 01 FLOOR FIRE FIGHTING LAYOUT 27.02.2023
3
2 1
22
099-00
2
S.S.L -4.00
EE-P-
12750
25
SUBSTATION ROOM-1 DETAILS 27.02.2023
4
500-07
22
1
EE-P-
SUBSTATION ROOM-2 DETAILS 27.02.2023
500-08
EE-P-
25
LV ROOM-01 DETAILS 27.02.2023
5
500-02
22
0
EE-P-
LV ROOM-02 DETAILS 27.02.2023
T 50m
500-03
K
00
226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249
C
34
14739-1-2022 SUBSTATION-1 LAYOUT 27.02.2023 0
4B
A
SE 7.
B
33
50
EE-TC-
BASEMENT 01 FLOOR TELECOM LAYOUT 27.02.2023
099-00
21
01
3B
.2
1m
00
3A
80
8 00
80
14
E:490385.390
50
N:2770199.613
77
0
BASEMENT 01 BASEMENT 01
-3.600M SSL -3.600M SSL Consultant:
Main Contractor:
MEP Contractor:
FREESIA ELECTROMECHANICAL
WORKS CONTRACTING LLC.
SHEIKH ZAYED ROAD, DUBAI, UAE
TRENCH DETAIL Drawing Title:
1 SCALE 1:20
BASEMENT - 01 FLOOR
SLAB BUILDERS WORK LAYOUT
PART-1
Job No: Scale Date Drawn Checked Approved
1:125 @A0 08.04.2023 SHJ IA SM
Drawing No: Rev No.
FEM-BO-SD-B1-MEP-BW-099-01 0
Key Plan:
A B C D E F G H J K L M N P Q R S T U V W X Y
104150
PLOT LIMIT
3450 4550 2750 2300 2600 2000 1300 4000 8000 8000 8000 8000 8000 8000 4000 3300 2600 2400 3150 4600 8250 4900 PLOT LIMIT
107.43m
E:490340.877
4C
N:2770044.110 6D
SIDE-4
5C
NOTES:
SET BACK
E:490285.354 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS
5.00m
3C N:2770136.078
50
m ARE IN METER UNLESS OTHERWISE NOTED.
33
SET BACK
63
2. ALL DIMENSIONS & LEVELS SHALL BE VERIFIED ON SITE
27
6C
50
8.
7.50m
PRIOR TO INSTALLATION.
00
44
SE 4D
5D
7.
PLOT LIMIT T
50
B TOWER SET BACK LINE
A
m
C
0
E:490349.251 LEGENDS AND SYMBOLS
70 K
14
00
33
N:2770042.041
3D
80
50
TOWER SET BACK LINE
23 2C
14
69
5
80
50
1C
0
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23
33
0
49
260 THK. RC SLAB 260 THK. RC SLAB 2D
24
11900
5.00m
1D
PRD
33
SET BACK
50
25
50
26
S.S.L -4.00
51
RAMP
UP
SLOPE 1:12
27
22
260 THK. RC F.F.L
SLAB -3.90
2500
S.S.L -4.00
FIRE
LIFT LOBBY
28
LIFT-01
TOWER-02 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29
BLOCK-A
21 F.F.L -3.90
S.S.L -4.00
2500
TOWER-02
BLOCK-B
20
TEL.CAB ELE.CAB
2500
GUEST
TC1 LIFT-03
52
F.F.L -3.90
19 260 THK. RC SLAB
S.S.L -4.00
57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76
VENTILATION
276
SLOPE 1:12
SHAFT
RAMP
SLOPE 1:12
UP
53 RAMP
UP
6000
PS1
50.90m
L.L.C.
FREESIA
40
UPUP
278
00
2500
T ING
ELE
AC
C
RO
TR
ON
T
ME
CHA N SC
ICA L W ORK
17 55 56 DNDN F.F.L -4.00
S.S.L -4.00 UP
260 THK. RC SLAB 275 279
3550
92 91 90 89 88 87 86 85 84 83 82 81 80 79
DN 78 77
MANEUVERING
16 AREA 274 280
93
A
4250
TC2
102 273 281
A
94
GBC-BO-ST-SD
A
SMDB-LL-B1 SMDB-T1-B BASEMENT-01 OVERALL SLAB GA DRAWING 15.03.2023
VENTILATION -GA-B1-001
95 PS1 PS3 PS3 PS3
104 SHAFT ME-DR-
BASEMENT 02 HIGH LEVEL DRAINAGE LAYOUT 27.02.2023
BANK-3
SUBSTATION FINAL PS1
271 283
CAP.
EMCC-LL-B1-FAN
098-HL
OPENING SIZES AND 260 THK. RC SLAB ME-DR-
A
LV ROOM FINAL BASEMENT 01 LOW LEVEL DRAINAGE LAYOUT 27.02.2023
LOCATION IN SLAB WILL 099-LL
96 97PER DEWA 98
BE AS 99OPENING SIZES AND
100 101
PANEL-3
270 284 ME-VE-
EMDB-LL-B1
S.S.L -4.75 BASEMENT 01 FLOOR VENTILATION LAYOUT 27.02.2023
LV
260 THK. RC SLAB
3550
ETS ROOM
105 099-00
wall 2.4m height
300 THK. RC SLAB LV CAP. ME-SM- BASEMENT 01 FLOOR SMOKE VENTILATION
PANEL-1 BANK-1 27.02.2023
PS2 PS2 PS2 099-00 LAYOUT
PS2 F.F.L -3.85 PS2
S.S.L -4.00 ME-FP-
BASEMENT 01 FLOOR FIRE FIGHTING LAYOUT 27.02.2023
13 269 285
099-00
EE-P-
350 mm THK 350 mm THK 350 mm THK
BASEMENT 01 FLOOR SMALL POWER LAYOUT 27.02.2023
099-00
E:490392.826 350 mm THK
COL. DROP COL. DROP COL. DROP COL. DROP EE-P-
RAMP UP FROM
BASEMENT-02
3500
RAMP UP TO
SUBSTATION ROOM-1 DETAILS 27.02.2023
N:2770068.347
A
GR FLR.
500-07
A
118.51m
RAMP DN FROM
350 mm THK
BASEMENT-02
RAMP DN TO
GR. FLR.
COL. DROP
107
SIDE-3
SLOPE 10.00 % LENGTH 39.00 M
3600
ROAD
UP 14739-2-2022 SUBSTATION-2 LAYOUT 27.02.2023 0
28.17m2
SIDE-1
A
125.37 m² 350 mm THK F.F.L -3.85
PS1 PS1 PS1 PS1 PS1
267 287
BASEMENT 01 BASEMENT 01
-3.600M SSL -3.600M SSL
Consultant:
Main Contractor:
MEP Contractor:
FREESIA ELECTROMECHANICAL
WORKS CONTRACTING LLC.
1 SCALE 1:20
Drawing Title:
BASEMENT - 02 FLOOR
SLAB BUILDERS WORK LAYOUT
PART-1
Job No: Scale Date Drawn Checked Approved
1:125 @A0 08.04.2023 SHJ IA SM
Drawing No: Rev No.
FEM-BO-SD-B1-MEP-BW-099-02 0