Inspection chamber 500 x 500 mm depth upto
Sl No Description Unit No Length
Inspection chamber
A EARTH WORK cum 1.00 0.80
B PCC cum 1.00 0.60
C Bricks cum 2.00 0.50
Bricks cum 2.00 0.96
E Concrete benching Cum 1.00 0.50
F External plastering Sqmt 4.00 0.96
G Top plastering Sqmt 4.00 0.73
H Internal plastering Sqmt 1.00 2.00
I Medium duty perforated cover (Material cost) NO's 1.00
J Frame & Cover fixing NO's 1.00
material cost
Sub Total
11,507.64 14550
0.10 1,150.76
12,658.40
0.15 1,898.76
14,557.16
Enclosed
the rate
analysis
for your
reference.
Installation Nos 18
Installation Nos 6
Installation Nos 2
Installation Nos 10
Installation Nos 2
Installation Nos 8
Installation Mtr 30
Sewage line cleaning Feet 140
Sub Total
14,998
Installation
Nos
6
800
4,800
-
c
110 mm 45*bend (supply)
Nos
2
2,499.64
4,999
Installation
Nos
2
800
1,600
Installation
Nos
10
800
8,000
-
d
110 mm tee (supply)
Nos
2
2,499.64
4,999
Installation
Nos
2
800
1,600
-
e
L.N 110mm Long Bush
Nos
8
2,499.64
19,997
Installation
Nos
8
800
6,400
2
supply and fixing Hdpe cutting,fitting and jointing pipe pe-100 all complete work.
-
a
110 mm dia (supply)
Mtr
30
771.42
23,143
Installation
Mtr
30
200
6,000
Sub Total
264,926
Existing DG shifting
Sl No Description Unit Quantity Rate
sewage line chamber fixing
SEWAGE LINE CHAMBER FIXING
NO's
A REMOVING OF CABLES FOR DG AND PANELS LS 1.00 5,000
B FOUNDATION BREAKING AND SHIFTING NO's 1 10,000
C BARICATTION SHEETS REMOVING AND SHIFTING NO's 60 100
D MS ANGLES/SUPPORTS REMOVING AND SHIFTING LS 1 5,000
E HYDRA FOR DG AND PANEL SHIFTING DAY 1 12,000
Total
I TOTAL
5,000.00
10,000.00
6,000.00
5,000.00
12,000.00
38,000.00
38,000.00
5,700.00
43,700.00
LT Cable joint kits 3c x 25 sqmm, Supply
Sl No Description Unit Quantity Rate Amount
sewage line chamber fixing
SEWAGE LINE CHAMBER FIXING
NO's
A 3.5 Core*25sqmm XLPE joint kit nos 1.00 2,956.00 2,956.00
B 2,956.00
TOTAL 2,956.00
B 3,868.00
TOTAL 3,868.00
7,828.00
TOTAL 7,828.00
261.25
TOTAL 261.25