RANGKA ATAP BAJA RINGAN

MATERIAL : ZINIUM EMERALD (AZ100) /ALUZINC 100

KANAL C75 @6,00M KANAL C80 & KANAL C75 KLASIK @6,00M
TEBAL 960 Batang 480 Batang 160 Batang HET TEBAL 960 Batang 480 Batang 160 Batang HET
0.45 64,000 65,750 67,750 70,500 0.45 72,000 74,250 76,500 79,500
0.50 70,500 72,500 74,750 77,750 0.50 79,250 81,500 84,000 87,500
0.55 75,750 78,000 80,250 83,500 0.55 85,500 88,000 90,500 94,250
0.60 82,750 85,250 87,500 91,000 0.60 93,000 95,750 98,750 102,500
0.65 89,000 91,750 94,500 98,250 0.65 100,250 103,250 106,500 110,750
0.70 95,750 98,750 101,500 105,750 0.70 107,750 111,000 114,500 119,000
0.75 101,250 104,250 107,500 111,750 0.75 114,250 117,500 121,000 125,750
0.80 109,000 112,250 115,750 120,250 0.80 122,750 126,500 130,250 135,250
0.85 115,500 118,750 122,500 127,250 0.85 130,000 133,750 137,750 143,250
1.00 142,250 146,500 151,000 156,750 1.00 160,000 165,000 169,750 176,750

RENG TH30 @6,00M TEBAL C100x28.5 C120x33 C125x35 C125Xx45


TEBAL 2000 Batang 900 Batang 300 Batang HET 1.00 162,000 191,750 221,750 224,750
0.40 42,250 43,750 45,250 47,000
0.45 47,750 49,500 51,250 53,250
0.50 52,750 54,500 56,500 58,750

RANGKA PARTISI BAJA RINGAN


MATERIAL : ZINIUM
C73X27 KANAL STUD & U RUNNER 75X30 @3,00M 27 30

TEBAL 500 Batang 250 Batang 150 Batang HET


0.35 26,500 27,500 28,500 29,750
75
73

0.40 28,250 29,250 30,500 31,750


0.45 32,000 33,250 34,750 36,000 27 30
0.50 35,250 36,500 38,000 39,500 KANAL STUD C73 U RUNNER 75

SYARAT DAN KETENTUAN SURABAYA 4-Jul-22


1. HARGA ACUAN ADALAH HARGA SESUAI VOLUME YANG TABEL.
2. HARGA INCLUDE PPN 11%
3. HARGA BERLAKU UTK JARAK KIRIMAN <50KM DARI DEPO KMB HARGA PONTI LAMPUNG
4. HARGA PER BATANG

28 24 33
80

75

75

30 26
35
KANAL C80 KANAL C75 KANAL C75 KLASIK

25
17
16
45

30

25

RENG TH45 RENG TH30 RENG TH25


RANGKA ATAP BAJA RINGAN
MATERIAL : ZINIUM RUBY (AZ70) /ALUZINC 70

KANAL C75 @6,00M KANAL C80 & KANAL C75 KLASIK @6,00M
TEBAL 960 Batang 480 Batang 160 Batang HET TEBAL 960 Batang 480 Batang 160 Batang HET
0.45 61,500 63,250 65,250 67,750 0.45 69,250 71,250 73,500 76,250
0.50 68,250 70,094 72,197 75,085 0.50 76,750 79,000 81,250 84,500
0.55 73,000 75,250 77,500 80,500 0.55 82,250 84,750 87,000 90,500
0.60 80,000 82,250 84,750 88,000 0.60 90,000 92,500 95,500 99,250
0.65 86,250 89,000 91,500 95,250 0.65 97,250 100,250 103,250 107,250
0.70 92,750 95,500 98,500 102,500 0.70 104,500 107,750 110,750 115,250
0.75 98,500 101,500 104,500 108,500 0.75 110,750 114,250 117,500 122,250

RENG TH30 @6,00M NOTE :


TEBAL 2000 Batang 900 Batang 300 Batang HET KANAL PER IKAT @8 BATANG
0.40 40,750 42,250 43,500 45,250 RENG PER IKAT @10 BATANG
0.45 46,000 47,500 49,250 51,250

SYARAT DAN KETENTUAN SURABAYA 4-Jul-22


1. HARGA ACUAN ADALAH HARGA SESUAI VOLUME YANG TABEL.
2. HARGA INCLUDE PPN 11%
3. HARGA BERLAKU UTK JARAK KIRIMAN <50KM DARI DEPO KMB HARGA PONTI LAMPUNG