DAILY

INSPECTION
REPORT B&I Department
BV Job No.:
PROJECT: Bogor E-Commerce Hub Date Of Inspection: December 20th, 2022

BV Client: PT. Gudang SPE Indonesia Inspector by: Ibnu Awal H


On today, BVI HSE personnel perform HSE Inspection and found the following problems (unsafe act
and/or unsafe condition) which those put into “Pictures of Findings” table below. PT. Pulau Intan is
required to improve those findings and put the closed out’s evidence(s) in the “Pictures of Corrective
Action Taken” column below:

Pictures of Findings Pictures of Corrective Action Taken


Findings 1

Description: Description :
On December 20th, 2022 time 09:00 AM while BVI-
HSE Performed daily site inspection, found unsafe Work was temporarily stopped, because the
action PIBK workers who were doing steel painting scaffolding material installed was incomplete
work using scaffolding that was not proper and not and the scaffolding was tagged red.
checked/verified/tagged (green) by the certified
scaffolding inspector
Location: Corporate Office
Findings 2

Description: Description :
On December 20th, 2022 time 09:01 AM while BVI-
HSE Performed daily site inspection, found unsafe The panel cover has been repaired. and the
condition the electrical panel casing was damaged and panel is equipped with safety signs and PIC
there was also no safety sign, PIC, and single- line
diagram posted on the electrical panel
Location: Corporate Office

INSP 001 - Inspection Report rev.0 Page 1 of 3 Copyright Bureau Veritas, December 18th, 2020
DAILY
INSPECTION
REPORT B&I Department
BV Job No.:
Findings 3

Description: Description :
On December 20th, 2022 time 09:12 AM while BVI-
HSE Performed daily site inspection, found unsafe Work stopped, until basket Oxygen and gas
condition the gas cylinder was left standing free without cylinders are available
being tied or placed on a trolley/basket and also not
equipped with a metal cap and also use gas for
households for cutting torch raw materials, potentially
causing gas cylinders to collapse and explode
Location: Project gate #2

Findings 4

Description: Description :
On December 20th, 2022 time 09:12 AM while BVI-
HSE Performed daily site inspection, found unsafe
action PIBK workers who were cutting SHS (square
hollow section) steel using cutting torches did not wear
special PPE (aprons, welding gloves, welding masks)
and also did not provide fire extinguishers
Location: Project gate #2

INSP 001 - Inspection Report rev.0 Page 2 of 3 Copyright Bureau Veritas, December 18th, 2020
DAILY
INSPECTION
REPORT B&I Department
BV Job No.:
Findings 5

Description: Description :
On December 20th, 2022 time 15:10 PM while BVI-
HSE Performed daily site inspection, found unsafe Broken webbing slings have been replaced with
condition the webbing sling used to lift the U-ditch new ones.
material was damaged, potentially causing the webbing
sling to cut off and the material to fall down
Location: Excavator PC 200

Findings 6

Description: Description :
On December 20th, 2022 time 15:35 PM while BVI-
HSE Performed daily site inspection, found unsafe Workers have been warned and directed to use
action PIBK workers who were doing wall rectification standard PPE when working at heights.
work did not wear special PPE (full- body harnesses)
and also did not use scaffolding Location: Utility

INSP 001 - Inspection Report rev.0 Page 3 of 3 Copyright Bureau Veritas, December 18th, 2020