5.STE SP - Foundation Layout2-Model
5.STE SP - Foundation Layout2-Model
200
200
100 152 304
200
200
50 100 300 100 100
200
200
200
200
50
200
50 50 100
200
200
200
200
3. FOUNDATION CONCRETE SHALL BE OF M-10 GRADE & SHALL CONFORM TO IS 456 OR ITS LATEST VERSION.
200
200
100
200
100
50
100
200
200
DL/RL = 100.540 DL/RL=100.540 DL/RL=100.540 DL/RL=100.540 DL/RL=100.540 1000 4. THE FOUNDATION IS DESIGNED FOR HAVING SILTY SAND SOIL OF S.B.C 15000 KG/SQM IN DEPTH OF 1000mm.
DL/RL=100.540 DL/RL=100.540 DL/RL =100.540 DL / RL =100.540
FGL=100.340 FGL=100.340 FGL
1100
FGL=100.340 FGL=100.340 FGL FGL=100.340 FGL FGL=100.340 FGL=100.340 FGL FGL FGL=100.340 FGL FGL FGL=100.340 FGL 5. THE CORE HOLE OF FOUNDATION SHOULD BE FILLED UP WITH M-15 GRADE CONCRETE CONFORMING TO IS 456:1964 OR ITS LATEST
400
400
1900
1685
1985
550
550
550
550
550
550
550
550
550
550
650
650
650
550
550
550
650
650
650
650
650
650
800
800
VERSION. THE TOP OF FOUNDATION SHALL BE GIVEN A SLOPE OF 1:50 TOWARDS THE EDGES TO ENSURE THAT WATER DOES NOT
1000
1000
STE STE STE AVG.GL=99.890 AVG.GL=99.890 AVG.GL=99.89 AGL=99.890 AGL=99.890 AGL=99.890
STE AGL=99.890 AGL=99.890 AGL=99.890
1500
1500
1500
1500
1500
1500
1500
1500
21 COLLECT AT THE BASE OF THE STRUCTURE THE FRAME WORK OF EQUIPMENT.
1700
1700
1700
1700
1700
1700
27 25
1700
1700
1700
1700
23
2811.5
1700
1700
1700
1700
1700
100
400
STE 100 100 100 100 200
2000
2000
2000
2000
2000
2000
600
2300
2300
2000
2000
200 200 200 250 200 600 600 600 600 6. SUITABLE GROOVES OR NICHES SHALL BE PROVIDED THE FOUNDATION BLOCKS AT THE TIME OF CASTING TO ENABLE EMBEDMENT
19 CONTROL AND 600 200
2000
450 450
1350
2000x3300
3808
1350
1350
1350
OF EARTH STRIP WITH OUT CHIPPING OFF THE CONCRETE.
1650
1350
1350
645
1350
EQUIPMENT ROOM
1350
STE STE
STE
3000x3300 BATTERY ROOM 450 450 450 450 450 450 450 450 7. ALL THE DRAWINGS AND SPECIFICATION MENTIONED IN THIS DRAWING HAS BEEN FOLLOWED WITH THEIR LATEST VERSION .
24 STE
8. FOUNDATION SHALL BE REST 1000 MM IN PARENT SOIL OR AS PER SITE REQUIREMENT .
300
300
300
300
28 26
300
300
300
300
22 150 Ø R.C HUME PIPE
300
300
2576.5
300
300
300
300
300
300
FOR CABLE ENTRY
BOTTOM LEVEL=98.540 BOTTOM LEVEL=98.540 BOTTOM LEVEL=98.540 BOTTOM LEVEL=98.54
BOTTOM LEVEL=98.540 BOTTOM LEVEL=98.540 BOTTOM LEVEL=98.540 BOTTOM LEVEL=98.24
5623
2576.5
2000 2000 1700 1200 1200 1200 1200 1700 1700
2000 2000 2000 2000 1200
2000 1985
500
50
5000 5000
1800
STE
2811.5
STE 01
GGM/C/RITES/SBC
S-1 S-1 06 S-1
575 625
1815
STE
12 1200 POCKET SIZE POCKET SIZE AGM/C/RITES/SBC
STE STE 1200
2000
1800
LOC FOR:- 600 200X100X550 200X100X550
901.5
10 09 STE 600 STE STE STE 2000 275
STE 07 STE 04 03 02 2000 2000
STE
11 08 05
1800 1800 1800 STE STE STE STE STE 325 LOC FOR:- STE 1200 JGM/C/RITES/MYS
550
550
1900 POCKET SIZE 2 3 4 7 10 STE 01 800 FOUNDATION LAYOUT AND CROSS SECTION
250
250 350
300 1000 500 300 1000 500 500 1000 300 38 LOC FOR:-
200X100X550
1200
1200
1700 20 S3
600
600
1200
1700
1000
STE STE STE STE STE
600
500 300
100
VOL - 0.77 cum
350
JGM/ELECT/RITES/MYS
200
800 500 400 50 13 14 15 16 17 POCKET SIZE 200X100X550 CORE HOLE STE DETAILS FOR
650
650
VOL - 0.78 cum
3000 3000 3000 3000 3000 3000 2775 25 CORE HOLE CORE HOLE CORE HOLE LOC FOR:- STE STE
21 WITH 22 VOL - 1.04 cum 262
LOC FOR:- STE WITH STE Ø450 29 11000
STE WITH STE STE WITH STE STE SAGARAKATTE SP
LOC FOR:- STE WITH
500
HASSAN
8000
500
500
5000
S-1 LOC FOR:- S-1 LOC FOR:- S-1 18 19 VOL - 5.28 cum SDGM/CIVIL/RITES/MYS
Ø450 11 12 Ø450 08 09 05 06 Ø450 600 600 5000
STE WITH STE 338
203
*
203
203
23 24 1200
740
SSP STR SSP END 638 562 1200 VOL - 3.01 cum (CH:25/957.00- 25/977.80)
1100
100 1700
1985
1685
VOL - 6.71 cum 152 VOL - 6.71 cum MGR/ELECT/RITES/MYS
2000
152
1800
152 POCKET
2000
VOL - 6.71 cum
2000
1800
1800
STE WITH STE
901.5
901.5
POCKET SIZE
901.5
CH:25/957.00 CH:25/977.80
0.390m
0.700m
0.640m
0.64m
25 26 PLAN VIEW PLAN VIEW PLAN VIEW
*
Ø 100
2000
1800
Ø450
STE WITH STE PLAN VIEW
645
ENG/CIVIL/RITES/MYS
27 28 POCKET SIZE
MYS HAS
385
398.5
398.5
398.5
200X250X800
1.00
1700 VOL - 6.34 cum For KEC
415
1000 INTERNATIONAL
1.50
400 400
CH:25/966.50 POCKET SIZE POCKET SIZE POCKET SIZE SOUTH WESTERN RAILWAY
i=4.50 200X100X550 200X100X550 200X100X550 * SPACING OF FOUNDATION BOLT OF PLAN VIEW
PLAN VIEW PLAN VIEW PLAN VIEW INTERRUPTER SHOULD BE AS PER DETAIL, REV. DATE DESCRIPTION INITIAL RAILWAY ELECTRIFICATION
PLAN VIEW NATURAL GROUND LEVEL
1700
S7 PROVIDED BY MANUFACTURE.
STE DSGN RUSTAM
29
CHKD KARTHIK SCALE :- 1:1