Atlas Copco Underground drill rigs

Boltec M, L and E series rigs


Transport instruction

WARNING! Risk area when moving the rig!

2m

C
ec L
Bolt

2m
2m
1250 0218 34

2m

Lifting

LC
lte c
Bo
1250 0218 35

Be very careful when strapping and lifting the rig!


CAUTION! The lift must be done through the centre of gravity so the rig is balanced
during lifting.
Atlas Copco Underground drill rigs
Boltec M, L and E series rigs
Transport instruction

Transport position

www.atlascopco.com

LC
1250 0218 36

LC

Boom must be laid down and supported by floor for transport!

Boltec Length [m] Width [m] Height [m] Weight [ton]


MC 13.4 2.3 3.0 22
MD 13.4 2.3 2.9 22
LC 14.2 2.5 3.1 26
LD 14.2 2.5 3.0 26

Securing the load


1250 0226 16

www.atlascopco.com

LC

LC

Securing points

CAUTION! Make sure all hatches and plates are closed.


9852 2329 01a

Atlas Copco Rock Drills AB


ÖREBRO, Sweden
© Atlas Copco Rock Drills AB, 2015. All rights reserved