You are on page 1of 2

INSTALLATION - SOBHASAN GGS CUM CTF OIL AND NATURAL GAS CORPORATION LTD.

OIL AND NATURAL GAS CORPORATION LTD., MEHSANA ASSET, SURFACE TEAM D.P.R QHSE/REV4/JAN-2011 DATE
GCP - GAS COMPRESSION DETAILS (SCMD) GAS BALANCE (M3/DAY)
DIP & VOLUME OF CRUDE OIL STORAGE TANKS DIP & VOLUME OF TESTING TANKS HORIZONTAL TANKS (100 ME EACH) GCP-INSCADA PRESSURE (Kg/cm2)
TIME M/S E/S N/S TOTAL A. TOTAL GAS COMPRESSED
HRS. B. GGS-I INJECTION
TANK 1 TANK 2 TANK 3 TANK 4 TANK 5 TANK 6 TANK 1 TANK 2 TANK 1 TANK 2 TIME GCP-I
SUC. PR DISCH. PR
HRS. C.
CM M3 CM M3 CM M3 CM M3 CM M3 CM M3 CM M3 CM M3 CM M3 CM M3 GCP-II GGS-II INJECTION
06:00 6:00 TOTAL COMPRESSION (SCMD) D. CTF INJECTION (A-B-C)
07:00 7:00 E. TOTAL GAS FROM SEPARATORS
08:00 8:00 GAS FROM SEPARATORS (SCMD) F. FLARE
09:00 9:00 M/S E/S N/S TOTAL G. GAIL DUDHSAGAR
10:00 10:00 LP SEP H. INTERNAL CONSUMPTION (HT)
11:00 11:00 HP SEP I. INTERNAL CONSUMPTION (GCP)
12:00 12:00 SEP NO. 1 J. CTF CONSUMPTION (BH)
13:00 13:00 SEP NO. 2 K. GAS RECEIVED FROM GGS-I
14:00 14:00 SEP NO. 3 L. GAS RECEIVED FROM GGS-II
15:00 15:00 SEP NO. 4 M. GAS TO/FROM GRID (A+I-J-K-L)
16:00 16:00 SEP NO. 5
17:00 sZ 17:00 TANKERS DETAIL
18:00 18:00 GAS TO FLARE/COLONY/CONSUMERS (SCMD) Nos QL QO
19:00 19:00 M/S E/S N/S TOTAL CTF
20:00 20:00 FLARE GGS-I
21:00 21:00 GAIL GGS-II
22:00 22:00 SABAR OTHERS
23:00 23:00 COLONY TOTAL
00:00 0:00 JANPATH AVG. W/C (%)
01:00 1:00
02:00 2:00 TRUNK LINE W/C (%) (CHEM. LAB) REMARKS/COMMENTS
03:00 3:00 TIME SOB CTF GGS-I GGS-II MHN CTF
04:00 4:00 06:00
05:00 5:00 07:00
06:00 6:00 08:00
WELL TEST DATA RECEIVED QTY FROM GGS-1, TANKERS, ETP PUMP RUNNING HOURS M/S 09:00
TIME QL QTY GAS QTY W/C % SEP NO. SEP PR. REMARKS RECEIVED LIQUID W/C NET OIL RUNNING HOURS GCP SUCTION PRESSURE (Kg/cm ) 2 10:00
WELL MODE TEST SHIFT PUMPS
DURATION FROM TO M3/DAY M3/DAY HEADER V-205 KG/CM2 FROM M3 % M3 FROM TO TOTAL MIN. MAX. AVG. 11:00
GGS-1 RC/DISP. (BPCL-1) 12:00
TANKER RC/DISP. (BPCL-2) 13:00
ETP DISPATCH (BPCL-3) GCP DISCHARGE PRESSURE (Kg/cm ) 2 14:00
M/S R/C DISPATCH (BPCL-4) MIN. MAX. AVG. 15:00
RC (9 GR) 16:00
TIME QL QTY GAS QTY W/C % SEP NO. SEP PR. REMARKS TOTAL RC (11 GR) 17:00
WELL MODE TEST E/S
DURATION FROM TO M /DAY
3
M /DAY
3 HEADER 1 KG/CM 2 RC (NEMO) EMULSION FROM SOB-GGS-1 18:00
GGS-1 RC/DISP. (BPCL-1) LIQUID (M3) 19:00
TANKER RC/DISP. (BPCL-2) WC (%) 20:00
ETP DISPATCH (BPCL-3) OIL (M3) 21:00
E/S R/C DISPATCH (BPCL-4) 22:00
RC (9 GR) EFFLUENT DETAILS (M3) 23:00
STOCK DATA FOR THE DAY (M 3) TOTAL RC (11 GR) CTF + GGS-I to ETP 00:00
S.NO SHIFT M/S E/S N/S TOTAL RC (NEMO) TANKERS (PMS) 01:00
1 OPENING STOCK GGS-1 RC/DISP. (BPCL-1) TOTAL N/S 02:00
2 OIL PRODUCTION TANKER RC/DISP. (BPCL-2) 03:00
3 TOTAL RECEIPT ETP DISPATCH (BPCL-3) WWTP TANK VOLUME (M3) 04:00
GGS-1 N/S R/C DISPATCH (BPCL-4) WWTP- T 1 05:00
OIL TANKERS (except CTF) RC (9 GR) 06:00
RECEIPT WWTP- T 2
PMS TOTAL RC (11 GR) TOTAL DAY AVERAGE (%)
4 TOTAL (1+2+3) RC (NEMO)
5 DISPATCH MORNING EVENING NIGHT COLD WORK PERMIT ISSUED LF/PMS/WSS JOBS
6 CLOSING STOCK (4-5)
NET OIL
7 MFM
NET WATER
8 LIQUID PRODUCTION
HOT WORK PERMIT ISSUED
C/STOCK M/S E/S N/S
E/OIL (M3) ACCIDENT NEAREMISS
N/OIL (M3)
W/C (%) SHIFT I/C SIGNATURE SHIFT I/C SIGNATURE SHIFT I/C SIGNATURE
INSTALLATION - SOBHASAN GGS CUM CTF OIL AND NATURAL GAS CORPORATION LTD., MEHSANA ASSET, SURFACE TEAM D.P.R QHSE/REV4/JAN-2011 DATE
GCP - GAS COMPRESSION DETAILS (SCMD) GAS BALANCE (M3/DAY)
DIP & VOLUME OF CRUDE OIL STORAGE TANKS DIP & VOLUME OF TESTING TANKS HORIZONTAL TANKS (100 ME EACH) GCP-INSCADA PRESSURE (Kg/cm2)
TIME M/S E/S N/S TOTAL A. TOTAL GAS COMPRESSED
HRS. B. GGS-I INJECTION
TANK 1 TANK 2 TANK 3 TANK 4 TANK 5 TANK 6 TANK 1 TANK 2 TANK 1 TANK 2 TIME GCP-I
SUC. PR DISCH. PR
HRS. C.
CM M3 CM M3 CM M3 CM M3 CM M3 CM M3 CM M3 CM M3 CM M3 CM M3 GCP-II GGS-II INJECTION
06:00 6:00 TOTAL COMPRESSION (SCMD) D. CTF INJECTION (A-B-C)
07:00 7:00 E. TOTAL GAS FROM SEPARATORS
08:00 8:00 GAS FROM SEPARATORS (SCMD) F. FLARE
09:00 9:00 M/S E/S N/S TOTAL G. GAIL DUDHSAGAR
10:00 10:00 LP SEP H. INTERNAL CONSUMPTION (HT)
11:00 11:00 HP SEP I. INTERNAL CONSUMPTION (GCP)
12:00 12:00 SEP NO. 1 J. CTF CONSUMPTION (BH)
13:00 13:00 SEP NO. 2 K. GAS RECEIVED FROM GGS-I
14:00 14:00 SEP NO. 3 L. GAS RECEIVED FROM GGS-II
15:00 15:00 SEP NO. 4 M. GAS TO/FROM GRID (A+I-J-K-L)
16:00 16:00 SEP NO. 5
17:00 17:00 TANKERS DETAIL
18:00 18:00 GAS TO FLARE/COLONY/CONSUMERS (SCMD) Nos QL QO
19:00 19:00 M/S E/S N/S TOTAL CTF
20:00 20:00 FLARE GGS-I
21:00 21:00 GAIL GGS-II
22:00 22:00 SABAR OTHERS
23:00 23:00 COLONY TOTAL
00:00 0:00 JANPATH AVG. W/C (%)
01:00 1:00
02:00 2:00 TRUNK LINE W/C (%) (CHEM. LAB) REMARKS/COMMENTS
03:00 3:00 TIME SOB CTF GGS-I GGS-II MHN CTF
04:00 4:00 06:00
05:00 5:00 07:00
06:00 6:00 08:00
WELL TEST DATA RECEIVED QTY FROM GGS-1, TANKERS, ETP PUMP RUNNING HOURS M/S 09:00
TIME QL QTY GAS QTY W/C % SEP NO. SEP PR. REMARKS RECEIVED LIQUID W/C NET OIL RUNNING HOURS GCP SUCTION PRESSURE (Kg/cm ) 2 10:00
WELL MODE TEST SHIFT PUMPS
DURATION FROM TO M3/DAY M3/DAY HEADER V-205 KG/CM2 FROM M3 % M3 FROM TO TOTAL MIN. MAX. AVG. 11:00
GGS-1 RC/DISP. (BPCL-1) 12:00
TANKER RC/DISP. (BPCL-2) 13:00
ETP DISPATCH (BPCL-3) GCP DISCHARGE PRESSURE (Kg/cm ) 2 14:00
M/S R/C DISPATCH (BPCL-4) MIN. MAX. AVG. 15:00
RC (9 GR) 16:00
TIME QL QTY GAS QTY W/C % SEP NO. SEP PR. REMARKS TOTAL RC (11 GR) 17:00
WELL MODE TEST E/S
DURATION FROM TO M /DAY
3
M /DAY
3 HEADER 1 KG/CM 2 RC (NEMO) EMULSION FROM SOB-GGS-1 18:00
GGS-1 RC/DISP. (BPCL-1) LIQUID (M3) 19:00
TANKER RC/DISP. (BPCL-2) WC (%) 20:00
ETP DISPATCH (BPCL-3) OIL (M3) 21:00
E/S R/C DISPATCH (BPCL-4) 22:00
RC (9 GR) EFFLUENT DETAILS (M3) 23:00
STOCK DATA FOR THE DAY (M 3) TOTAL RC (11 GR) CTF + GGS-I to ETP 00:00
S.NO SHIFT M/S E/S N/S TOTAL RC (NEMO) TANKERS (PMS) 01:00
1 OPENING STOCK GGS-1 RC/DISP. (BPCL-1) TOTAL N/S 02:00
2 OIL PRODUCTION TANKER RC/DISP. (BPCL-2) 03:00
3 TOTAL RECEIPT ETP DISPATCH (BPCL-3) WWTP TANK VOLUME (M3) 04:00
GGS-1 N/S R/C DISPATCH (BPCL-4) WWTP- T 1 05:00
OIL TANKERS (except CTF) RC (9 GR) 06:00
RECEIPT WWTP- T 2
PMS TOTAL RC (11 GR) TOTAL DAY AVERAGE (%)
4 TOTAL (1+2+3) RC (NEMO)
5 DISPATCH MORNING EVENING NIGHT COLD WORK PERMIT ISSUED LF/PMS/WSS JOBS
6 CLOSING STOCK (4-5)
NET OIL
7 MFM
NET WATER
8 LIQUID PRODUCTION
HOT WORK PERMIT ISSUED
C/STOCK M/S E/S N/S
E/OIL (M3) ACCIDENT NEAREMISS
N/OIL (M3)
W/C (%) SHIFT I/C SIGNATURE SHIFT I/C SIGNATURE SHIFT I/C SIGNATURE

You might also like