KOLOM H - BEAM 300

BASE PLAT Space 2850


30X30 T=15
400 2050 400
1ST FLOOR
Hoistway 2450
± 0,00

200
D13 - 150 D13 - 150
D13 - 150

1350
1850

D13 - 150

D13 - 300
300

D13 - 150 D13 - 150


LEVELING CONCRETE
PONDASI STRAUS PILE T=10 cm
D30 cm - 4,5 m

2550
2750

DETAIL PENULANGAN PIT MELINTANG 1


SKALA 1 : 25 -

nama proyek /project title no gambar /dwg no tanggal /date 12 / 05 / 2023 tanggal /date arah utara /northpoint
PT. PARDIC JAYA CHEMICAL TANGERANG skala /scale
TANGERANG PUC/02/17/Elv-008B digambar /drawn by ZAQ
nama gambar /drawing title no revisi /revision no diperiksa /checked by Ir. HERMAN K.
SHOP DRAWING / ELEVATOR disetujui /approved by A3