You are on page 1of 1

Page 1

VRW & VBR (FUEL)= AMOUNT TO BE ADDED OR DEDUCTED FROM IPC NO. 02

COMPLETION

PF % OFFUEL
COMPONENT
WORK DONE

OF A STAGE

FOLLOWING
RESPECTIVE

UNDER THE
=VALUE OF

H(1) ROAD
SCHEDULE
ITEMS OF

WORK (2)
FOR THE
MONTH

WORKS
OTHER
RW/BR
SR (FI-
BILL NO DATE DISCRIPTION FO FI VRW & VBR (FUEL) REMARKS
NO FO)/FO)

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l)

- 10 94.27 87.42 -0.073 - EW/GSB/ Other works

- 10 94.27 87.42 -0.073 - Bituminous Work


VRW & VBR (FUEL ) = AMOUNT TO BE ADDED OR
1 IPC-1 30-06-2022 DEDUCTED FROM IPC DUE TO CHANGE IN COST OF Feb-22 - 10 94.27 87.42 -0.073 - Cement Concrete Pavement
FUEL
- 10 94.27 87.42 -0.073 - Culvert, Minor Bridges And Other Structure

56,59,85,339.00 10 94.27 87.42 -0.073 -35,11,939.03 Major Bridge And Structures

- 10 94.27 97.49 0.034 - EW/GSB/ Other works

- 10 94.27 97.49 0.034 - Bituminous Work


VRW & VBR (FUEL ) = AMOUNT TO BE ADDED OR
2 IPC-2 31-08-2022 DEDUCTED FROM IPC DUE TO CHANGE IN COST OF Apr-22 - 10 94.27 97.49 0.034 - Cement Concrete Pavement
FUEL
92,36,972.00 10 94.27 97.49 0.034 26,694.85 Culvert, Minor Bridges And Other Structure

19,56,04,115.00 10 94.27 97.49 0.034 5,65,295.89 Major Bridge And Structures

Page 1 of 1