CÓMPUTOS MÉTRICOS

PROYECTO:
MEJORAMIENTO Y AMPLIACION SISTEMA DE AGUA POTABLE HUAYCO GRANDE

PARTES DIMENSIONES CANTIDAD CANTIDAD


No ÍTEMS UNIDAD
IGUALES LARGO ANCHO ALTO PARCIAL TOTAL

MODULO I: ACTIDADES GENERALES

1 INSTALACION DE FAENAS GBL 1.00

1 1.00 1.00

2 PROV. Y COLOCADO DE LETRERO DE OBRA PZA 1 1.00

1 1.00 1.00

3 PROVISION Y COLOCADO DE PLACA DE ENTREGA PZA 1 1.00

1 1.00 1.00
CÓMPUTOS MÉTRICOS
PROYECTO:
MEJORAMIENTO Y AMPLIACION SISTEMA DE AGUA POTABLE HUAYCO GRANDE

MODULO II: OBRA DE TOMA

PARTES DIMENSIONES MT CANTIDAD CANTIDAD


No ÍTEMS UNIDAD
IGUALES LARGO ANCHO ALTO PARCIAL TOTAL

1 REPLANTEO DE OBRAS DE TOMA M2 125.0000

Sistema principal 1 1.00 5.00 5.00 25.00


sitema 2 1.00 5.00 5.00 25.00
sitema 3 1.00 5.00 5.00 25.00
sitema 4 1.00 5.00 5.00 25.00
sitema 5 1.00 5.00 5.00 25.00
125.00 125.0000

2 EXCAVACION CON AGOTAMIENTO M3 40.5000

Sistema principal 1 1.00 4.50 1.50 1.20 8.10


sitema 2 1.00 4.50 1.50 1.20 8.10
sitema 3 1.00 4.50 1.50 1.20 8.10
sitema 4 1.00 4.50 1.50 1.20 8.10
sitema 5 1.00 4.50 1.50 1.20 8.10
40.50 40.5000

3 HORMIGON CICLOPEO OBRAS DE TOMA DOS: 1:2:3 M3 58.1300


50%PD
SISTEMAS 1 y 3 58.1260
Muros frontales
azud
base 2.00 2.00 0.80 0.25 0.80
elevació n 1 2.00 2.00 0.50 0.80 1.60
elevació n 2 2.00 2.00 0.25 0.80 0.80
Muro lateral
base 4.00 4.30 1.15 0.30 5.93
elevació n 1 4.00 4.30 0.40 1.25 8.60
elevació n 2 4.00 4.30 0.20 1.25 4.30
Camara de grava
base 2.00 2.00 0.90 0.20 0.72
elevació n 1 2.00 2.00 0.20 0.60 0.48
Caja colectora
base 2.00 1.00 1.30 0.20 0.52
elevació n 1 4.00 1.70 0.20 0.80 1.09
elevació n 2 4.00 0.90 0.20 0.80 0.58
SISTEMAS 2, 4, 5 y 5A
Muros frontales
azud
base 4.00 1.50 1.80 0.25 2.70
elevació n 1 4.00 1.50 0.50 0.80 2.40
elevació n 2 4.00 1.50 0.25 0.80 1.20
Muro lateral
base 8.00 3.50 0.80 0.30 6.72
elevació n 1 8.00 3.50 0.30 1.25 10.50
elevació n 2 8.00 3.50 0.10 1.25 3.50
Camara de grava
base 4.00 1.50 0.50 0.20 0.60
elevació n 1 4.00 1.50 0.20 0.60 0.72
Caja colectora
base 4.00 1.00 1.30 0.20 1.04
elevació n 1 8.00 1.70 0.20 0.80 2.18
elevació n 2 8.00 0.90 0.20 0.80 1.15
58.13 58.1260

4 REVOQUE INTERIOR DE MORTERO IMPERMEABILIZANTE M2 31.0800

Caja colectora 6.00 0.90 0.60 3.24


12.00 0.90 0.80 8.64
12.00 0.60 0.80 5.76
Cámara de salida
12.00 0.90 0.80 8.64
12.00 0.50 0.80 4.80

31.08 31.0800

5 TAPAS HORMIGON ARMADO M3 1.1900


Caja colectora 6.00 1.70 1.30 0.07 0.93 1.1928
Cá mara de salida 6.00 0.70 0.90 0.07 0.26
1.19 1.1928

6 ACCESORIOS OBRA DE TOMA D = 2" , 1 1/2" y 1" GBL 5.0000


Caja colectora
Cá mara de salida 5.00 5.00 5.0000

7 FILTRO DE GRAVA SELECCIONADA M3 3.3000

Sistema principal 1 y 3 2.00 2.00 0.90 0.50 1.80


Sistema 2, 4, 5 Y 5A 4.00 1.50 0.50 0.50 1.50
3.30 3.3000
CÓMPUTOS MÉTRICOS
PROYECTO:
MEJORAMIENTO Y AMPLIACION SISTEMA DE AGUA POTABLE HUAYCO GRANDE

MODULO III: OBRA DE TOMA Y SISTEMA DE ADUCCION

PARTES DIMENSIONES CANTIDAD


No ÍTEMS UNIDAD
IGUALES LARGO ANCHO ALTO PARCIAL

1 REPLANTEO Y CONTROL DE LINEAS DE TUBERIA ML

Sistema principal 1 1.00 796.79 796.79

Sitema 2 1.00 607.57 607.57

Sitema 3 1.00 672.53 672.53

Sitema 4 1.00 434.99 434.99

Sitema 5 1.00 444.92 444.92


2,956.80

2 EXCAVACION EN ROCA M3
Aducciones
Sistema principal 1 1.00 796.79 0.40 0.50 159.36

Sitema 2 1.00 607.57 0.40 0.50 121.51

Sitema 3 1.00 672.53 0.40 0.50 134.51

Sitema 4 1.00 434.99 0.40 0.50 87.00

Sitema 5 1.00 444.92 0.40 0.50 88.98

591.36

3 PROVISION Y COLOCADO TUBERIA PVC D= 2" CLASE - 9


ML
Aducció n
Sistema principal 1 1.00 796.79 796.79

4 PROVISION Y COLOCADO TUBERIA PVC D= 1 " CLASE 12 ML


Aducció n
Sitema 2 1.00 607.57 607.57
Sitema 3 1.00 672.53 672.53
Sitema 4 1.00 434.99 434.99
Sitema 5 1.00 444.92 444.92
2,160.01

5 PROV. Y COLOCADO DE CAMA DE ARENA M3


Aducció n
1.00 2,956.80 0.40 0.10 118.27

6 RELLENO CON TIERRA CERNIDA M3


aducció n
Excavacion en roca 1.00 2,956.80 0.40 0.10 118.27

7
8 RELLENO Y COMPACTADO CON MAQUINA M3
Aducció n
Volumen total de excavació n 1.00 591.36
restar cama de arena -1.00 118.27 -118.27
restar tierra seleccionada -1.00 118.27 -118.27
CÓMPUTOS MÉTRICOS
PROYECTO:
MEJORAMIENTO Y AMPLIACION SISTEMA DE AGUA POTABLE HUAYCO GRANDE

MODULO III: OBRA DE TOMA Y SISTEMA DE ADUCCION

PARTES DIMENSIONES CANTIDAD


No ÍTEMS UNIDAD
IGUALES LARGO ANCHO ALTO PARCIAL
354.82

8 PRUEBA HIDRAULICA (hasta D = 4") ML


Aducció n
1.00 2,956.80 2,956.80

DESINFECCION DE TUBERIA (hasta D = 4") CON HIPOCLORITO


9
AL 70% ML
Aducció n
1.00 2,956.80 2,956.80

10 CAMARA DE H°C° PURGA DE LODOS CON TAPA METALICA PZA

Sistema principal 0.00 0.00


Sitema 2 1.00 1.00
Sitema 3 1.00 1.00
Sitema 4 0.00 0.00
Sitema 5 1.00 1.00
3.00

11 CAMARA DE H°C° PURGA DE AIRE CON TAPA METALICA PZA

Sistema principal 1.00 1.00


Sitema 2 1.00 1.00
Sitema 3 1.00 1.00
Sitema 4 0.00 0.00
Sitema 5 1.00 1.00
4.00
CANTIDAD
TOTAL

2,956.800

2,956.800

591.360

591.360

796.790

796.790

2,160.010

2,160.010

118.270
118.272
118.272

118.270

118.272

354.820
354.820
CANTIDAD
TOTAL
354.820

2,956.800

2,956.800

2,956.800

2,956.800

3.000

3.000

4.000

4.000
CÓMPUTOS MÉTRICOS

PROYECTO:
MEJORAMIENTO Y AMPLIACION SISTEMA DE AGUA POTABLE HUAYCO GRANDE

MODULO IV: TANQUES DE ALMACENAMIENTO DE AGUA

PARTES DIMENSIONES MT CANTIDAD CANTIDAD


No ÍTEMS UNIDAD
IGUALES LARGO ANCHO ALTO PARCIAL TOTAL
1 REPLANTEO Y TRAZADO DE TANQUE M2 244.000

Sistema principal (30 m3) 1.00 10.00 10.00 100.00


Sitema 2 (3,50 m3) 1.00 6.00 6.00 36.00
Sitema 3 (2 m3) 1.00 6.00 6.00 36.00
Sitema 4 (2m3) 1.00 6.00 6.00 36.00
Sitema 5 (3,50m3) 1.00 6.00 6.00 36.00
244.00 244.000

2 EXCAVACION EN ROCA M3 28.210


28.208
Sistema principal (30 m3) 1.00 6.80 6.80 0.30 13.87
Sitema 2 (3,50 m3) 1.00 3.60 3.60 0.30 3.89
Sitema 3 (2 m3) 1.00 3.10 3.10 0.40 3.84
Sitema 4 (2m3) 1.00 3.10 3.10 0.35 3.36
Sitema 5 (3,50m3) 1.00 3.60 3.60 0.25 3.24
28.21 28.208

3 ZAMPEADO DE PIEDRA M3 30.140


Tanque principal 30.140
Sistema principal (30 m3) 1.00 4.20 4.20 17.64
Sitema 2 (3,50 m3) 1.00 2.00 2.00 4.00
Sitema 3 (2 m3) 1.00 1.50 1.50 2.25
Sitema 4 (2m3) 1.00 1.50 1.50 2.25
Sitema 5 (3,50m3) 1.00 2.00 2.00 4.00
30.14 30.140

4 HORMIGON CICLOPEO 1:2:3 50% PD TANQUE DE M3 30.980


ALMAC.
30.975
Sistema principal (30 m3)
base mayor 1.00 6.80 1.60 0.30 3.26
laterales mayor 1.00 5.50 0.30 2.10 3.47
laterales mayor 1.00 5.50 0.35 2.10 4.04

base menor 1.00 4.20 1.60 0.30 2.02


laterales menor 1.00 4.20 0.20 2.10 1.76
laterales menor 1.00 4.20 0.35 2.10 3.09

Sitema 2 y 5 (3,50 m3)


base mayor 2.00 3.60 1.00 0.20 1.44
laterales mayor 2.00 3.00 0.20 1.30 1.56
laterales mayor 2.00 3.00 0.20 1.30 1.56

base menor 2.00 2.00 1.00 0.20 0.80


laterales menor 2.00 2.00 0.20 1.30 1.04
laterales menor 2.00 2.00 0.20 1.30 1.04

Sitema 3 y 4 (2 m3)
base mayor 2.00 3.10 1.00 0.20 1.24
laterales mayor 2.00 2.40 0.20 1.30 1.25
laterales mayor 2.00 2.40 0.20 1.30 1.25

base menor 2.00 1.50 1.00 0.20 0.60


laterales menor 2.00 1.50 0.20 1.30 0.78
laterales menor 2.00 1.50 0.20 1.30 0.78
30.97 30.975

5 HORMIGON ARMADO LOSA DE FONDO M3 3.620


3.617

Sistema principal (30 m3) 1.00 4.20 4.20 0.12 2.12


Sitema 2 (3,50 m3) 1.00 2.00 2.00 0.12 0.48
Sitema 3 (2 m3) 1.00 1.50 1.50 0.12 0.27
Sitema 4 (2m3) 1.00 1.50 1.50 0.12 0.27
Sitema 5 (3,50m3) 1.00 2.00 2.00 0.12 0.48
3.62 3.617

6 HORMIGON ARMADO LOSA - TAPA M3 5.030


5.027
Sistema principal (30 m3) 1.00 4.80 4.80 0.12 2.76
Sitema 2 (3,50 m3) 1.00 2.40 2.40 0.12 0.69
Sitema 3 (2 m3) 1.00 1.90 1.90 0.12 0.43
Sitema 4 (2m3) 1.00 1.96 1.90 0.12 0.45
Sitema 5 (3,50m3) 1.00 2.40 2.40 0.12 0.69
5.03 5.027

7 REVOQUE INTERIOR DE MORTERO IMPERMEABILIZANTE M2 70.000

Sistema principal (30 m3)


laterales 4.00 4.20 2.00 33.60

Sitema 2 y 5 (3,50 m3)


laterales 8.00 2.00 1.30 20.80

Sitema 3 y 4 (2 m3)
laterales 8.00 1.50 1.30 15.60
70.00 70.000

8 REVOQUE EXTERIOR DE CEMENTO DEL TANQUE M2 111.000

Sistema principal (30 m3)


elevació n 4.00 5.50 2.12 46.64
bordes 4.00 4.50 0.30 5.40

Sitema 2 y 5 (3,50 m3)


elevació n 8.00 2.80 1.30 29.12
bordes 8.00 2.10 0.20 3.36

Sitema 3 y 4 (2 m3)
elevació n 8.00 2.30 1.30 23.92
bordes 8.00 1.60 0.20 2.56
111.00 111.000

9 PINTURA LATEX EXTERIOR TANQUE M2 111.000

tanque grande 1.00 111.00 111.000

10 DESINFECCION DEL TANQUE CON HIPOCLORITO M3 46.530

Sistema principal (30 m3) 1.00 4.20 4.20 2.00 35.28


Sitema 2 (3,50 m3) 1.00 2.00 2.00 0.90 3.60
Sitema 3 (2 m3) 1.00 1.50 1.50 0.90 2.03
Sitema 4 (2m3) 1.00 1.50 1.50 0.90 2.03
Sitema 5 (3,50m3) 1.00 2.00 2.00 0.90 3.60
46.53 46.530
11 CAMARA DE VALVULAS DE H° C° ( 70X70 CM) PZA 10.000

10.00 10.00 10.000

12 TAPA HORMIGON ARMADO PZA 0.200


5.00 0.70 0.70 0.08 0.20 0.196

13 HIPOCLORADOR AUTOMATICO INCLUYE CASETA GBL 5.000


5.00 5.00 5.000

14 CIERRE PERIMETRAL DE MALLA OLIMPICA H=2,30 MT + ML 136.000


PUERTA

Sistema principal (30 m3) 4.00 10.00 40.00


Sitema 2 (3,50 m3) 4.00 6.00 24.00
Sitema 3 (2 m3) 4.00 6.00 24.00
Sitema 4 (2m3) 4.00 6.00 24.00
Sitema 5 (3,50m3) 4.00 6.00 24.00
136.00 136.000
CÓMPUTOS MÉTRICOS
PROYECTO:
MEJORAMIENTO Y AMPLIACION SISTEMA DE AGUA POTABLE HUAYCO GRANDE

MODULO V: PUENTES COLGANTES

PARTES DIMENSIONES CANTIDAD CANTIDAD


No ÍTEMS UNIDAD
IGUALES LARGO ANCHO ALTO PARCIAL TOTAL

MODULO V: PUENTES COLGANTES

1 REPLANTEO TOPOGRAFICO DE PUENTES COLGANTES M2 660.000


ADUCCION
Sistema principal 1
Puente colgante L = 20 MT 2 20.00 1.00 40.00
Puente colgante L = 40 MT 1 40.00 1.00 40.00
Sistema 2
Puente colgante L = 20 MT 1 20.00 1.00 20.00
Puente colgante L = 30 MT 2 30.00 1.00 60.00

Sistema 3
Puente colgante L = 20 MT 1 20.00 1.00 20.00

Sistema 4
Puente colgante L = 10 MT 2 10.00 1.00 20.00

Sistema 5
Puente colgante L = 30 MT 1 30.00 1.00 30.00

RED DE DISTRIBUCION
Sistema principal 1
Puente colgante L = 40 MT 2 40.00 1.00 80.00

Ramal 2
Puente colgante L = 20 MT 1 20.00 1.00 20.00
Ramal 3
Puente colgante L = 30 MT 1 30.00 1.00 30.00
Ramal 4
Puente colgante L = 40 MT 1 40.00 1.00 40.00
Ramal 7
Puente colgante L = 30 MT 1 30.00 1.00 30.00
Ramal 8
Puente colgante L = 60 MT 1 60.00 1.00 60.00

Sistema 5
Puente colgante L = 50 MT 1 50.00 1.00 50.00
Puente colgante L = 40 MT 1 40.00 1.00 40.00
Puente colgante L = 30 MT 1 30.00 1.00 30.00
Puente colgante L = 50 MT 1 50.00 1.00 50.00
660.00 660.000

2 EXCAVACION EN SUELO SEMIDURO 0 - 2 MT M3 41.820


ADUCCION 41.818
Puente colgante L = 10 MT
zapata 4.00 0.30 0.30 0.90 0.32
anclaje 4.00 0.55 0.40 0.80 0.70
Puente colgante L = 20 MT
zapata 8.00 0.30 0.30 0.90 0.65
anclaje 8.00 0.55 0.40 0.80 1.41
Puente colgante L = 30 MT
zapata 6.00 0.50 0.50 0.90 1.35
anclaje 6.00 0.80 0.55 0.80 2.11
PROYECTO:
MEJORAMIENTO Y AMPLIACION SISTEMA DE AGUA POTABLE HUAYCO GRANDE

MODULO V: PUENTES COLGANTES

PARTES DIMENSIONES CANTIDAD CANTIDAD


No ÍTEMS UNIDAD
Puente colgante L = 10 MT
zapata 2.00 1.20 0.50 1.50 1.80
anclaje 2.00 1.10 0.80 1.20 2.11
Puente colgante L = 60 MT
zapata 1.20 0.50 1.50 0.00
anclaje 1.10 0.80 1.20 0.00
Puente colgante L = 75 MT
zapata 1.50 0.60 1.60 0.00
anclaje 1.20 0.80 1.30 0.00
RED DE DISTRIBUCION
Puente colgante L = 20 MT
zapata 2.00 0.30 0.30 0.90 0.16
anclaje 2.00 0.55 0.40 0.80 0.35
Puente colgante L = 30 MT
zapata 6.00 0.50 0.50 0.90 1.35
anclaje 6.00 0.80 0.55 0.80 2.11
Puente colgante L = 40 MT
zapata 8.00 1.20 0.50 1.50 7.20
anclaje 8.00 1.10 0.80 1.20 8.45
Puente colgante L = 50 MT
zapata 4.00 1.20 0.50 1.50 3.60
anclaje 4.00 1.10 0.80 1.20 4.22
Puente colgante L = 60 MT
zapata 2.00 1.20 0.50 1.50 1.80
anclaje 2.00 1.10 0.80 1.20 2.11

41.82 41.818

3 HORMIGON CICLOPEO 1:2:3 50% PD PUENTE COLG. M3 41.820


ADUCCION 41.818
Puente colgante L = 10 MT
zapata 4.00 0.30 0.30 0.90 0.32
anclaje 4.00 0.55 0.40 0.80 0.70
Puente colgante L = 20 MT
zapata 8.00 0.30 0.30 0.90 0.65
anclaje 8.00 0.55 0.40 0.80 1.41
Puente colgante L = 30 MT
zapata 6.00 0.50 0.50 0.90 1.35
anclaje 6.00 0.80 0.55 0.80 2.11
Puente colgante L = 10 MT
zapata 2.00 1.20 0.50 1.50 1.80
anclaje 2.00 1.10 0.80 1.20 2.11

RED DE DISTRIBUCION
Puente colgante L = 20 MT
zapata 2.00 0.30 0.30 0.90 0.16
anclaje 2.00 0.55 0.40 0.80 0.35
Puente colgante L = 30 MT
zapata 6.00 0.50 0.50 0.90 1.35
anclaje 6.00 0.80 0.55 0.80 2.11
Puente colgante L = 40 MT
zapata 8.00 1.20 0.50 1.50 7.20
anclaje 8.00 1.10 0.80 1.20 8.45
Puente colgante L = 50 MT
zapata 4.00 1.20 0.50 1.50 3.60
PROYECTO:
MEJORAMIENTO Y AMPLIACION SISTEMA DE AGUA POTABLE HUAYCO GRANDE

MODULO V: PUENTES COLGANTES

PARTES DIMENSIONES CANTIDAD CANTIDAD


No ÍTEMS UNIDAD
anclaje 4.00 1.10 0.80 1.20 4.22
Puente colgante L = 60 MT
zapata 2.00 1.20 0.50 1.50 1.80
anclaje 2.00 1.10 0.80 1.20 2.11

41.82 41.818

4 PUENTES COLGANTES L = 10 +/- 2 MT PZA 2.000

Aducció n 2.00 2.00 2.000

5 PUENTES COLGANTES L = 20 +/- 2 MT PZA 5.000

Aducció n 4.00 4.00


Distribució n 1.00 1.00
5.00 5.000

6 PUENTES COLGANTES L = 30 +/- 2 MT PZA 6.000

Aducció n 3.00 3.00


Distribució n 3.00 3.00

6.00 6.000

7 PUENTES COLGANTES L = 40 +/- 2 MT PZA 5.000

Aducció n 1.00 1.00


Distribució n 4.00 4.00

5.00 5.000

8 PUENTES COLGANTES L = 50 +/- 2 MT PZA 2.000

Aducció n 0.00
Distribució n 2.00 2.00
2.00 2.000

9 PUENTES COLGANTES L = 60 +/- 2 MT PZA 1.000

Aducció n 0.00
Distribució n 1.00 1.00 1.000
CÓMPUTOS MÉTRICOS
PROYECTO:
MEJORAMIENTO Y AMPLIACION SISTEMA DE AGUA POTABLE HUAYCO GRANDE

MODULO VI: RED DE DISTRIBUCION

PARTES DIMENSIONES CANTIDAD CANTIDAD


No ÍTEMS UNIDAD
IGUALES LARGO ANCHO ALTO PARCIAL TOTAL

1 REPLANTEO Y CONTROL DE LINEAS DE TUBERIA ML 14,966.7100

Sistema principal 1
1.00 5,647.64 5,647.64
Ramal 1 1.00 208.49 208.49
Ramal 2 1.00 204.37 204.37
Ramal 3 1.00 632.08 632.08
Ramal 4 1.00 645.02 645.02
Ramal 5 1.00 437.85 437.85
Ramal 6 1.00 476.27 476.27
Ramal 7 1.00 677.87 677.87
Ramal 8 1.00 234.86 234.86

Sitema 2
R1 1.00 411.92 411.92
R2 1.00 624.10 624.10

Sitema 3
R1 1.00 694.21 694.21
Sitema 4
R1 1.00 834.65 834.65
Sitema 5
R1 1.00 2,581.00 2,581.00
R2 1.00 656.38 656.38
14,966.71 14,966.7100

2 EXCAVACION SUELO SEMIDURO 0 - 2 MT M3 867.1800


867.1820
Sistema principal Nº 1
Ramal 1 1.00 208.49 0.40 0.50 41.70
Ramal 4 1.00 645.02 0.40 0.50 129.00
Ramal 6 1.00 476.27 0.40 0.50 95.25

Sitema Nº 2
Ramal Principal 1.00 411.92 0.40 0.50 82.38

Sitema Nº 3
Ramal unico 1.00 694.21 0.40 0.50 138.84
Sitema Nº 5
Ramal Principal (tramo Nº 1) 1.00 1,900.00 0.40 0.50 380.00

867.18 867.1820

3 EXCAVACION CON RETROEXCAVADORA M3 2,352.0700


2,352.0656
Sistema principal Nº 1
1.00 5,647.64 0.40 0.60 1,355.43
Ramal 2 1.00 204.37 0.40 0.50 40.87
Ramal 3 1.00 632.08 0.40 0.50 126.42
Ramal 5 1.00 437.85 0.40 0.50 87.57
Ramal 7 1.00 677.87 0.40 0.50 135.57
Ramal 8 1.00 234.86 0.40 0.50 46.97

Sitema 2
Ramal Nº 2 1.00 624.10 0.40 0.50 124.82

Sistema 4
Ramal unico 1.00 834.65 0.40 0.50 166.93
Sistema 5
Ramal Principal (tramo Nº 2) 1.00 681.00 0.40 0.50 136.20
Ramal Nº 2 1.00 656.38 0.40 0.50 131.28
10,630.80
2,352.07 2,352.0656

4 PROV. Y TENDIDO TUBERIA PVC D=3" C - 6 ML 800.0000


Sistema Principal Nº 1
Prog. 2 + 000 - 2 + 800 1.00 800.00 800.00 800.0000

5 PROV. Y TENDIDO TUBERIA PVC D=2" C - 9 ML 4,847.6400

Sistema Principal Nº 1
Prog. 0 + 000 - 2 + 000 1.00 2,000.00 2,000.00
Prog. 2 + 800 - 5 + 647,64 1.00 2,847.64 2,847.64

4,847.64 4,847.6400

6 PROV. Y TENDIDO TUBERIA PVC D=1 1/2" C - 9 ML 1,278.4200


Sistema Principal Nº 1
Ramal Nº 1 1.00 208.49 208.49
Ramal Nº 3 1.00 632.08 632.08
Ramal Nº 5 1.00 437.85 437.85

1,278.42 1,278.4200

7 PROV. Y TENDIDO TUBERIA PVC D=1" C - 12 ML 6,770.2700


Sistema Principal Nº 1
Ramal Nº 2 1.00 204.37 204.37
Ramal Nº 4 1.00 645.02 645.02
Ramal Nº 6 1.00 476.27 476.27
Ramal Nº 7 1.00 677.87 677.87
Ramal Nº 8 1.00 234.86 234.86
SISTEMA Nº 2
Ramal Nº 1 1.00 411.92 411.92
Ramal Nº 2 1.00 624.10 624.10
SISTEMA Nº 3
Ramal unico 1.00 694.21 694.21
SISTEMA Nº 4
Ramal unico 1.00 834.65 834.65

PARA CONEXIONES DOMICILIARIAS


longitudes mayor a 30 mt desde la matriz a la vivienda
Sistema Principal Nº 1 1.00 500.00 500.00
Ramal Nº 3 1.00 175.00 175.00
Ramal Nº 4 1.00 515.00 515.00
Ramal Nº 5 1.00 75.00 75.00
Ramal Nº 7 1.00 95.00 95.00
SISTEMA Nº 2 1.00 195.00 195.00
SISTEMA Nº 5 1.00 412.00 412.00

6,770.27 6,770.2700

8 PROV. Y TENDIDO TUBERIA PVC D= 1" C - 15 ML 3,237.3800


SISTEMA Nº 5
Ramal Principal 1.00 2,581.00 2,581.00
Ramal Nº 1 1.00 656.38 656.38

3,237.38 3,237.3800

9 PROV. Y COLOCADO DE CAMA DE ARENA M3 677.3500


677.3484
PROV. Y COLOCADO TUBERIA PVC D=3" CLASE - 6 1.00 800.00 0.40 0.10 32.00
PROV. Y COLOCADO TUBERIA PVC D=2" CLASE - 9 1.00 4,847.64 0.40 0.10 193.91
PROV. Y COLOCADO TUBERIA PVC D=1 1/2" CLASE - 9 1.00 1,278.42 0.40 0.10 51.14
PROV. Y COLOCADO TUBERIA PVC D=1" CLASE - 12 1.00 6,770.27 0.40 0.10 270.81
PROV. Y COLOCADO TUBERIA PVC D=1" CLASE - 15 1.00 3,237.38 0.40 0.10 129.50
677.35 677.3484

10 RELLENO CON TIERRA CERNIDA M3 677.3500


677.3484
PROV. Y COLOCADO TUBERIA PVC D=3" CLASE - 6 1.00 800.00 0.40 0.10 32.00
PROV. Y COLOCADO TUBERIA PVC D=2" CLASE - 9 1.00 4,847.64 0.40 0.10 193.91
PROV. Y COLOCADO TUBERIA PVC D=1 1/2" CLASE - 9 1.00 1,278.42 0.40 0.10 51.14
PROV. Y COLOCADO TUBERIA PVC D=1" CLASE - 12 1.00 6,770.27 0.40 0.10 270.81
PROV. Y COLOCADO TUBERIA PVC D=1" CLASE - 15 1.00 3,237.38 0.40 0.10 129.50

677.35 677.3484

11 RELLENO Y COMPACTADO CON MAQUINA M3 1,864.5500


1,864.5500
Excavacion manual 1.00 867.18
Excavacion con retroexcvcavadora 1.00 2,352.07

restar cama de arena -1.00 677.35 -677.35


restar tierra seleccionada -1.00 677.35 -677.35
1,864.55 1,864.5500

12 PRUEBA HIDRAULICA (HASTA D=4") ML 14,966.7100

1.00 14,966.71 14,966.71 14,966.7100

13 DESINFECCION DE TUBERIAS (HASTA D=4") C/HIPOCL ML 14,966.7100

1.00 14,966.71 14,966.71 14,966.7100

14 CAMARA DE H° C° DE (70X70 CM) TIPO 1 C/TAPA PZA 10.0000


METALICA

10.00 10.00 10.0000

15 CAMARA DE H° C° DE (70X70 CM) TIPO 2 C/TAPA PZA 12.0000


METALICA

12.00 12.00 12.0000

CAMARA DE H°C° PURGA DE LODOS CON TAPA


16 PZA 11.0000
METALICA

Sistema principal 1 3.00 3.00

Ramal 2 1.00 1.00


Ramal 3 1.00 1.00
Ramal 4 1.00 1.00
Ramal 5 1.00 1.00
Ramal 8 1.00 1.00

Sitema 5 3.00 3.00


11.00 11.0000

17 CAMARA DE H°C° PURGA DE AIRE CON TAPA METALICA PZA 7.0000

Sistema principal 1 3.00 3.00

Ramal 2 1.00 1.00


Ramal 3 1.00 1.00
Ramal 4 1.00 1.00
Ramal 5 1.00 1.00
7.00 7.0000

18 CAMARA ROMPE PRESION DE Hº Aº C/TAPA METALICA PZA 3.0000

3.00 3.00 3.0000


CÓMPUTOS MÉTRICOS

PROYECTO:
MEJORAMIENTO Y AMPLIACION SISTEMA DE AGUA POTABLE HUAYCO GRANDE

MODULO VII: CONEXIONES DOMICILIARIAS

PARTES DIMENSIONES CANTIDAD CANTIDAD


No ÍTEMS UNIDAD
IGUALES LARGO ANCHO ALTO PARCIAL TOTAL

1 EXCAVACION EN ROCA M3 54.000

para tuberia de 1/2" 30.00 12.00 0.30 0.50 54.00 54.000

2 EXCAVACION EN SUELO SEMIDURO 0 - 2 MT M3 158.400


Acometidas
para tuberia de 1/2" 55.00 12.00 0.40 0.60 158.40 158.400

3 PROV. Y COLOCADO DE CAMA DE ARENA M3 40.800

para tuberia de 1/2" 85.00 12.00 0.40 0.10 40.80 40.800

4 RELLENO CON TIERRA CERNIDA M3 40.800


solo red de distribucion
para tuberia de 1/2" 85.00 12.00 0.40 0.10 40.80 40.800

5 RELLENO Y COMPACTADO CON MAQUINA M3 122.400

excavacion suelo semiduro para tuberia de 1/2" 85.00 12.00 0.40 0.50 204.00 204.000

Restar volumen de cama de arena -1.00 40.80 -40.800


Restar volumen de relleno tierra cernida -1.00 40.80 -40.800

6 PRV. Y TENDIDO TUBERIA PVC D= 1/2" ESQ-40 ML 1020.000

85.00 12.00 1020.00 1020.000

7 ACCESORIOS PARA CONEXIONES DOMICILIARIAS PZA 85.000

85.00 85.00 85.000

8 PROV. Y COLOCADO DE MEDIDORES DE AGUA PZA 85.000

85.00 85.00 85.000

9 PROV. Y COLOCADO LAVANDERIAS DE CEMENTO PZA 85.000

85.00 85.00 85.000

10 CAMARA DE H°S° PARA MEDIDOR CON TAPA PZA 85.000


METALICA

85.00 85.00 85.000

11 ACCESORIOS DE PVC PARA LA RED (tee, codo, tapón) GBL 1.000

1.00 1.00 1.000

12 LIMPIEZA GENERAL DE LA OBRA GBL 1.000


1.00 1.00 1.000
4
3
7
14
CÓMPUTOS MÉTRICOS

PROYECTO:
MEJORAMIENTO Y AMPLIACION SISTEMA DE AGUA POTABLE HUAYCO GRANDE

MODULO VIII: MEDIDAS DE MITIGACION AMBIENTAL

PARTES DIMENSIONES CANTIDAD CANTIDAD


No ÍTEMS UNIDAD
IGUALES LARGO ANCHO ALTO PARCIAL TOTAL

1 DOTACION DE ROPA Y EQUIPO DE SEGURIDAD GBL 1.00


AL PERSONAL

1 1.00 1.00

2 LETREROS DE SEÑALIZACION AMBIENTAL GBL 1.00

1 1.00 1.00

3 SEÑALIZACION AREAS DE TRABAJO Y PASOS GBL 1.00


PEATONALES

1 1.00 1.00

4 DISPOSICION Y MANEJO DE RESIDUOS SOLIDOS GBL 1.00


(INST. CONTENEDORES TEMPORALES)

1 1.00 1.00

5 REFORESTACION CON ESPECIES NATIVAS GBL 1.00

1 1.00 1.00
|
PRESUPUESTO DE OBRA

PROYECTO: MEJORAMIENTO Y AMPLIACION SISTEMA DE AGUA POTABLE HUAYCO GRANDE

P. UNITARIO P. TOTAL
DESCRIPCION UNIDAD CANTIDAD
BS BS

I MODULO I: ACTIDADES GENERALES 17,060.60


1 INSTALACION DE FAENAS GBL 1.00 12,204.25 12,204.25
2 PROV. Y COLOCADO DE LETRERO DE OBRAS PZA 1.00 3,586.86 3,586.86
3 PROV. Y COLOCACION DE PLACA DE ENTREGA DE OBRAS PZA 1.00 1,269.49 1,269.49
II MODULO II: OBRA DE TOMA 72,450.75
1 REPLANTEO DE OBRAS DE TOMA M2 125.0000 2.33 291.25
2 EXCAVACION CON AGOTAMIENTO M3 40.5000 106.56 4,315.68
3 HORMIGON CICLOPEO OBRAS DE TOMA 1:2:3 50% PD M3 58.1300 931.89 54,170.77
4 REVOQUE INTERIOR DE MORTERO IMPERMEABILIZANTE M2 31.0800 149.57 4,648.64
5 TAPAS HORMIGON ARMADO M3 1.1900 2,033.89 2,420.33
6 ACCESORIOS PARA OBRA DE TOMA D=2", 1 1/2" y 1" GBL 5.0000 1,193.28 5,966.40
7 FILTRO DE GRAVA SELECCIONADA M3 3.3000 193.24 637.69
III MODULO III: ADUCCION 185,221.17
1 REPLANTEO Y CONTROL DE LINEAS DE TUBERIA M2 2,956.80 1.82 5,381.38
2 EXCAVACION EN ROCA M3 591.36 115.06 68,041.88
3 PROVISION Y COLOCADO TUBERIA PVC D= 2" CLASE - 9 M3 796.79 25.91 20,644.83
4 PROVISION Y COLOCADO TUBERIA PVC D= 1 " CLASE 12 M3 2,160.01 15.67 33,847.36
5 PROV. Y COLOCADO DE CAMA DE ARENA ML 118.27 88.38 10,452.70
6 RELLENO CON TIERRA CERNIDA ML 118.270 63.82 7,547.99
7 RELLENO Y COMPACTADO CON MAQUINA M3 354.82 59.52 21,118.89
8 PRUEBA HIDRAULICA (hasta D = 4") M3 2,956.80 1.01 2,986.37
9 DESINFECCION DE TUBERIA (hasta D = 4") CON HIPOCLORITO AL 70% M3 2,956.80 1.16 3,429.89
10 CAMARA DE H°C° PURGA DE LODOS CON TAPA METALICA ML 3.00 1,719.91 5,159.73
11 CAMARA DE H°C° PURGA DE AIRE CON TAPA METALICA ML 4.00 1,652.54 6,610.16

IV MODULO IV: TANQUES DE ALMACENAMIENTO DE AGUA CAP 30, 3,50 Y 2 M3 192,756.38


1 M2 244.00 2.33 568.52
2 EXCAVACION EN ROCA M3 28.21 115.06 3,245.84
3 ZAMPEADO DE PIEDRA M2 30.14 110.52 3,331.07
4 HORMIGON CICLOPEO 1:2:3 50% PD TANQUE ALMAC. M3 30.98 906.53 28,084.30
5 HORMIGON ARMADO LOSA DE FONDO M3 3.62 2,375.83 8,600.50
6 HORMIGON ARMADO LOSA - TAPA M3 5.03 2,844.33 14,306.98
7 REVOQUE INTERIOR DE MORTERO IMPERMEABILIZANTE M2 70.00 149.57 10,469.90
8 REVOQUE EXTERIOR DE CEMENTO DEL TANQUE M2 111.00 118.67 13,172.37
9 PINTURA LATEX EXTERIOR TANQUE M2 111.00 38.59 4,283.49
10 DESINFECCION DEL TANQUE CON HIPOCLORITO M3 46.53 53.67 2,497.27
11 CAMARA DE VALVULAS DE H° C° ( 70X70 CM) PZA 10.00 2,244.62 22,446.20
12 TAPA HORMIGON ARMADO M3 0.20 2,033.89 406.78
13 HIPOCLORADOR AUTOMATICO INCLUYE CASETA GBL 5.00 6,341.72 31,708.60
14 CIERRE PERIMETRAL DE MALLA OLIMPICA H=2,30 MT + PUERTA ML 136.00 364.96 49,634.56
V MODULO V: PUENTES COLGANTES 236,827.13
1 REPLANTEO DE PUENTES COLGANTES M2 660.00 2.33 1,537.80
2 EXCAVACION EN SUELO SEMIDURO 0 - 2 MT M3 41.82 73.32 3,066.24
3 HORMIGON CICLOPEO 1:2:3 50% PD PUENTE COLG. M3 41.82 884.74 36,999.83
4 PUENTES COLGANTES L = 10 +/- 2 MT PZA 2.00 5,445.37 10,890.74
5 PUENTES COLGANTES L = 20 +/- 2 MT PZA 5.00 6,901.54 34,507.70
6 PUENTES COLGANTES L = 30 +/- 2 MT PZA 6.00 8,154.18 48,925.08
7 PUENTES COLGANTES L = 40 +/- 2 MT PZA 5.00 10,531.50 52,657.50
8 PUENTES COLGANTES L = 50 +/- 2 MT PZA 2.00 14,105.17 28,210.34
9 PUENTES COLGANTES L = 60 +/- 2 MT PZA 1.00 20,031.90 20,031.90
VI MODULO VI: RED DE DISTRIBUCION 854,904.50
1 REPLANTEO Y CONTROL DE LINEAS DE TUBERIA ML 14,966.71 1.82 27,239.41
2 EXCAVACION SUELO SEMIDURO 0 - 2 MT M3 867.18 73.32 63,581.64
3 EXCAVACION CON RETROEXCAVADORA M3 2,352.07 22.03 51,816.10
4 PROV. Y TENDIDO TUBERIA PVC D=3" C - 6 M3 800.00 55.61 44,488.00
5 PROV. Y TENDIDO TUBERIA PVC D=2" C - 9 ML 4,847.64 29.52 143,102.33
6 PROV. Y TENDIDO TUBERIA PVC D=1 1/2" C - 9 ML 1,278.42 21.20 27,102.50
7 PROV. Y TENDIDO TUBERIA PVC D=1" C - 12 ML 6,770.27 15.67 106,090.13
8 PROV. Y TENDIDO TUBERIA PVC D= 1" C - 15 ML 3,237.38 21.35 69,118.06
9 PROV Y COLOCADO DE CAMA DE ARENA M3 677.35 88.38 59,864.19
10 RELLENO CON TIERRA SERNIDA M3 677.35 63.82 43,228.48
11 RELLENO Y COMPACTADO CON MAQUINA M3 1,864.55 59.52 110,978.02
12 PRUEBA HIDRAULICA (HASTA D=4") ML 14,966.71 1,01 #VALUE!
13 DESINFECCION DE TUBERIAS (HASTA D=4") C/HIPOCL. 70% ML 14,966.71 1.16 17,361.38
14 CAMARA DE H° C° DE (70X70 CM) TIPO 1 C/TAPA METALICA PZA 10.00 1,432.32 14,323.20
15 CAMARA DE H° C° DE (70X70 CM) TIPO 2 C/TAPA METALICA 12.00 1,646.66 19,759.92
16 CAMARA DE H°C° PURGA DE LODOS CON TAPA METALICA PZA 11.00 1,719.91 18,919.01
17 CAMARA DE H°C° PURGA DE AIRE CON TAPA METALICA PZA 7.00 1,652.54 11,567.78
18 CAMARA ROMPE PRESION DE Hº Aº C/TAPA METALICA PZA 3.00 3,749.32 11,247.96
VII MODULO VII: CONEXIONES DOMICILIARIAS 267,658.85
1 EXCAVACION EN ROCA M3 54.00 115.06 6,213.24
2 EXCAVACION EN SUELO SEMIDURO 0 - 2 MT M3 158.40 73.32 11,613.89
3 PROV. Y COLOCADO DE CAMA DE ARENA M3 40.80 88.38 3,605.90
4 RELLENO CON TIERRA CERNIDA M3 40.80 63,82 #VALUE!
5 RELLENO Y COMPACTADO CON MAQUINA M3 122.40 59.52 7,285.25
6 PROV. Y TENDIDO TUBERIA PVC D= 1/2" ESQ-40 ML 1,020.00 14.50 14,790.00
7 ACCESORIOS PARA CONEXIONES DOMICILIARIAS PZA 85.00 358.55 30,476.75
8 PROV. Y COLOCADO DE MEDIDORES DE AGUA PZA 85.00 572.91 48,697.35
9 PROV. Y COLOCADO LAVANDERIAS DE CEMENTO PZA 85.00 950.80 80,818.00
10 CAMARA DE H°S° PARA MEDIDOR CON TAPA METALICA PZA 85.00 631,97 #VALUE!
11 ACCESORIOS DE PVC PARA LA RED (tee, codo, tapón) GBL 1.00 3,525.24 3,525.24
12 LIMPIEZA GENERAL DE LA OBRA GBL 1.00 4.311,92 #VALUE!
VIII MODULO VIII: MEDIDAS DE MITIGACION AMBIENTAL 25,917.44
1 DOTACION DE ROPA Y EQUIPO DE SEGURIDAD AL PERSONAL GLB 1.00 7,275.38 7,275.38
2 LETREROS DE SEÑALIZACION AMBIENTAL GLB 1.00 3,919.40 3,919.40
3 SEÑALIZACION AREAS DE TRABAJO Y PASOS PEATONALES GLB 1.00 4,057.83 4,057.83
4 DISPOSICION Y MANEJO DE RESIDUOS SOLIDOS (INST. CONTENEDORES GLB 1.00 2,358.95 2,358.95
5 REFORESTACION CON ESPECIES NATIVAS GLB 1.00 8,305.88 8,305.88

PRESUPUESTO TOTAL EN BOLIVIANOS 1,852,796.82


PRESUPUESTO TOTAL GENERAL DEL PROYECTO

PROYECTO T.E.S.A.:

MEJORAMIENTO Y AMPLIACION SISTEMA DE AGUA POTABLE HUAYCO GRANDE

N° Presupuesto por componentes del Proyecto Monto Bs. Porcentaje %

1 Construcción de Obras 1,852,796.82 89.18%


2 Desarrollo comunitario DESCOM 117,586.95 5.66%
3 Supervisión de obras y al DESCOM 107,142.75 5.16%

PRESUPUESTO TOTAL GENERAL DEL PROYECTO 2,077,526.52 100.00%


Fuentes de financiam
Gobierno municipal de
N° Componentes del proyecto Monto total Bs. Villazón
Bs.

1 Construcción de obras 1,852,796.82 277,919.52


2 Desarrollo comunitario DESCOM 117,586.95 17,638.04
3 Supervisión de obras y al DESCOM 107,142.75 16,071.41

PRESUPUESTO GENERAL DE LA OBRA 2,077,526.52 311,628.98


Fuentes de financiamiento
Gobierno municipal de F.P.S. - Potosí o
Villazón Gobernación
% Bs. %

15.00% 1,574,877.30 85.00%


15.00% 99,948.91 85.00%
15.00% 91,071.34 85.00%
0
0.15% 1,765,897.54 0.85%