You are on page 1of 6

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

PROYECTO: “ MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA Y ALCANTARILLADO DE LA LOCALIDAD DE SUCCHA, DISTRITO DE SUCCHA, PROVINCIA DE AIJA – ANCASH ”

ITEM DESCRIPCION UND METRADO PRECIO PARCIAL MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 TOTAL

01 SISTEMA DE AGUA POTABLE 457,952.97


01.01 TRABAJOS PRELIMINARES 21,891.58
01.01.01 MOVILIZACION DE MAQUINARIAS HERRAMIENTAS PARA LA OBRA glb 1.00 15,000.00 15,000.00 7,500.00 7500 15,000.00
01.01.02 CAMPAMENTO PROVISIONAL DE OBRA m2 35.00 72.93 2,552.55 2,552.55 2,552.55
01.01.03 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 X 1.20 m u 1.00 568.08 568.08 568.08 568.08
01.01.04 LIMPIEZA Y DESBROCE m2 6,615.70 0.57 3,770.95 3,770.95 3,770.95
01.02 RED DE ADUCCION Y DISTRIBUCION 242,807.65 0.00
01.02.01 TRAZO, NIVELACION Y REPLANTEO m2 3,285.85 4.10 13,471.99 3,368.00 3,368.00 3,368.00 3,368.00 13,471.99
01.02.02 EXCAVACION DE ZANJAS m3 1,124.17 76.02 85,459.40 21,364.85 21,364.85 21,364.85 21,364.85 85,459.40
01.02.03 EXCAVACION DE ZANJAS EN ROCA FIJA m3 279.30 30.16 8,423.69 8,423.69 8,423.69
01.02.04 EXCAVACION EN MATERIAL CONGLOMERADO m3 139.65 80.25 11,206.91 11,206.91 11,206.91
01.02.05 NIVELACION Y REFINE DEL FONDO DE LA ZANJA m2 1,511.49 3.51 5,305.33 884.22 884.22 884.22 884.22 884.22 884.22 5,305.33
01.02.06 CAMA DE APOYO PARA TUBERIA a=0.40M m 3,285.85 6.39 20,996.58 3,499.43 3,499.43 3,499.43 3,499.43 3,499.43 3,499.43 20,996.58
01.02.07 PROVISION E INSTALACION TUBERIA PVC SAP C-10 D=2" m 3,285.85 6.31 20,733.71 3,455.62 3,455.62 3,455.62 3,455.62 3,455.62 3,455.62 20,733.71
01.02.08 SUM. Y COLOC. DE ACCESORIOS LINEA DE ADUCCION Y DISTRIBUCION glb 1.00 1,221.60 1,221.60 407.20 407.20 407.20 1,221.60
01.02.09 PRUEBA HIDRAULICA m 3,285.85 3.54 11,631.91 2,907.98 2,907.98 2,907.98 2,907.98 11,631.91
01.02.10 RELLENO Y COMPACTADO MANUAL DE ZANJA m3 930.55 45.70 42,526.14 8,505.23 8,505.23 8,505.23 8,505.23 8,505.23 42,526.14
01.02.11 ELIMINACION MATERIAL EXCEDENTE m3 765.71 28.51 21,830.39 7276.79666666667 7276.79666666667 7276.79666666667 21,830.39
01.03 VALVULAS DE CONTROL (10 UND) 6,655.18 0.00
01.03.01 TRAZO, NIVELACIÓN Y REPLANTEO m2 10.00 4.19 41.90 41.90 41.90
01.03.02 EXCAVACION DE ZANJAS m3 2.50 76.02 190.05 190.05 190.05
01.03.03 ELIMINACION DE MATERIAL EXCEDENTE m3 3.13 33.21 103.95 103.95 103.95
01.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 32.00 82.14 2,628.48 2,628.48 2,628.48
01.03.05 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 66.25 7.35 486.94 486.94 486.94
01.03.06 CONCRETO ARMADO f'c=175 kg/cm2 m3 1.77 454.33 804.16 804.16 804.16
01.03.07 SUM. Y COLOC. DE ACCESORIOS VALVULAS DE CONTROL u 10.00 239.97 2,399.70 2,399.70 2,399.70
01.04 VALVULAS DE PURGA (01 UND) 661.82 0.00
01.04.01 TRAZO, NIVELACIÓN Y REPLANTEO m2 1.00 4.19 4.19 4.19 4.19
01.04.02 EXCAVACION DE ZANJAS m3 0.25 76.02 19.01 19.01 19.01
01.04.03 ELIMINACION DE MATERIAL EXCEDENTE m3 0.31 33.21 10.30 10.30 10.30
01.04.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 3.20 82.14 262.85 262.85 262.85
01.04.05 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 10.23 7.35 75.19 75.19 75.19
01.04.06 CONCRETO ARMADO f'c=175 kg/cm2 m3 0.18 454.33 81.78 81.78 81.78
01.04.07 CONCRETO f'c=140 kg/cm2 m3 0.04 474.06 18.96 18.96 18.96
01.04.08 SUM. Y COLOC. DE ACCESORIOS VALVULA DE PURGA u 1.00 189.54 189.54 189.54 189.54
01.05 CONEXIONES DOMICILIARIAS (264 UND) 102,669.70 0.00
01.05.01 TRAZO, NIVELACIÓN Y REPLANTEO m2 633.60 4.19 2,654.78 663.70 663.70 663.70 663.70 2,654.78
01.05.02 EXCAVACION DE ZANJAS m3 63.36 58.13 3,683.12 920.78 920.78 920.78 920.78 3,683.12
01.05.03 NIVELACION Y REFINE DEL FONDO DE LA ZANJA m2 237.60 3.51 833.98 208.50 208.50 208.50 208.50 833.98
01.05.04 CAMA DE APOYO PARA TUBERIA a=0.30M m 475.20 4.73 2,247.70 561.93 561.93 561.93 561.93 2,247.70
01.05.05 PROVISION E INSTALACION TUBERIA PVC SAP C-10 D=1/2" m 528.00 2.42 1,277.76 319.44 319.44 319.44 319.44 1,277.76
01.05.06 RELLENO Y COMPACTADO MANUAL DE ZANJA m3 79.20 45.70 3,619.44 904.86 904.86 904.86 904.86 3,619.44
01.05.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 242.35 52.07 12,619.16 3,154.79 3,154.79 3,154.79 3,154.79 12,619.16
01.05.08 CONCRETO f'c=140 kg/cm2 m3 26.33 474.06 12,482.00 3,120.50 3,120.50 3,120.50 3,120.50 12,482.00
01.05.09 SUM. Y COLOC. DE ACCESORIOS CONEXIONES DOMICILIARIAS DE 1/2" u 264.00 239.59 63,251.76 15,812.94 15,812.94 15,812.94 15,812.94 63,251.76
01.06 VARIOS 13,371.29 0.00
01.06.01 DESINFECCION Y CLORACION glb 1.00 219.68 219.68 219.68 219.68
01.06.02 PRUEBA HIDRAULICA DEL SISTEMA m 422.40 1.88 794.11 794.11 794.11
01.06.03 CAPACITACION EN OPERACION Y MANTENIMIENTO DEL SISTEMA GLB 1.00 12,357.50 12,357.50 12,357.50 12,357.50
01.07 FLETE 69,895.75 0.00
01.07.01 FLETE TERRESTRE AGUA POTABLE glb 1.00 41,291.23 41,291.23 13,763.74 13,763.74 13,763.74 41,291.23
01.07.02 FLETE RURAL AGUA POTABLE glb 1.00 28,604.52 28,604.52 9,534.84 9,534.84 9,534.84 28,604.52
02 SISTEMA DE ALCANTARILLADO 927,332.29 0.00
02.01 TRABAJOS PRELIMINARES 9,680.96 0.00
02.01.01 TRAZO, NIVELACION Y REPLANTEO m2 2,361.21 4.10 9,680.96 9,680.96 9,680.96
02.02 MOVIMIENTO DE TIERRAS 494,106.95 0.00
02.02.01 EXCAVACION DE ZANJAS m3 2,844.30 38.02 108,140.29 54,070.15 54,070.15 108,140.29
02.02.02 EXCAVACION EN ROCA SUELTA m3 1,531.55 65.53 100,362.47 50,181.24 50,181.24 100,362.47
02.02.03 EXCAVACION PARA BUZONES m3 159.65 45.62 7,283.23 3,641.62 3,641.62 7,283.23
02.02.04 NIVELACION Y REFINE m2 1,770.91 2.63 4,657.49 2,328.75 2,328.75 4,657.49
02.02.05 CAMA DE APOYO PARA TUBERIA m 2,951.51 7.17 21,162.33 10,581.17 10,581.17 21,162.33
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA
PROYECTO: “ MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA Y ALCANTARILLADO DE LA LOCALIDAD DE SUCCHA, DISTRITO DE SUCCHA, PROVINCIA DE AIJA – ANCASH ”

ITEM DESCRIPCION UND METRADO PRECIO PARCIAL MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 TOTAL

02.02.06 RELLENO Y COMPACTADO C/PLANCHA VIBRATORIA m3 4,021.67 57.79 232,412.31 116,206.16 116,206.16 232,412.31
02.02.07 ELIMINACION DE MATERIAL EXCEDENTE m3 616.60 32.58 20,088.83 10,044.42 10,044.42 20,088.83
02.03 TENDIDO DE TUBERIAS 127,918.44 0.00
02.03.01 SUMINISTRO E INSTALACION DE TUBERIA UPVC UF ISO 200mm m 2,951.51 43.34 127,918.44 63,959.22 63,959.22 127,918.44
02.04 BUZONES 90,003.20 0.00
02.04.01 BUZON DE CONCRETO C/TAPA CºAº H=2.00m u 41.00 2,195.20 90,003.20 45,001.60 45,001.60 90,003.20
02.05 PRUEBA HIDRAULICA 1,623.33 0.00
02.05.01 PRUEBA HIDRAULICA PARA DESAGUE m 2,951.51 0.55 1,623.33 811.67 811.67 1,623.33
02.06 CONEXIONES DOMICILIARIAS 125,981.65 0.00
02.06.01 EXCAVACION DE ZANJAS m3 422.40 38.02 16,059.65 8,029.83 8,029.83 16,059.65
02.06.02 INSTALACIONES PRE-DOMICILIARIAS DE DESAGUE 6"(160mm), RC 8"(200mm), u 264.00 134.16 35,418.24 17,709.12 17,709.12 35,418.24
02.06.03 CAJAS DE REGISTRO u 264.00 162.71 42,955.44 21,477.72 21,477.72 42,955.44
02.06.04 RELLENO Y COMPACTADO C/PLANCHA VIBRATORIA m3 316.80 57.79 18,307.87 9,153.94 9,153.94 18,307.87
02.06.05 ELIMINACION DE MATERIAL EXCEDENTE m3 105.60 32.58 3,440.45 1,720.23 1,720.23 3,440.45
02.06.06 CAPACITACION EN OPERACION Y MANTENIMIENTO glb 1.00 9,800.00 9,800.00 4,900.00 4,900.00 9,800.00
02.07 FLETE 78,017.76 0.00
02.07.01 FLETE RURAL SISTEMA DE DESAGUE glb 1.00 27,844.38 27,844.38 13922.19 13922.19 27,844.38
02.07.02 FLETE TERRESTRE SISTEMA DE DESAGUE glb 1.00 50,173.38 50,173.38 25086.69 25086.69 50,173.38
03 PLANTA DE TRATAMIENTO 194,671.44 0.00
03.01 CAMARA DE REJAS 17,165.82 0.00
03.01.01 TRABAJOS PRELIMINARES 17.61 0.00
03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 2.35 3.30 7.76 3.88 3.88 7.76
03.01.01.02 TRAZO, NIVELACIÓN Y REPLANTEO m2 2.35 4.19 9.85 4.925 4.925 9.85
03.01.02 MOVIMIENTO DE TIERRAS 289.98 0.00
03.01.02.01 EXCAVACION EN TERRENO NORMAL m3 3.88 45.62 177.01 88.505 88.505 177.01
03.01.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 2.35 5.65 13.28 6.64 6.64 13.28
03.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 3.06 32.58 99.69 49.845 49.845 99.69
03.01.03 CONCRETO SIMPLE 4.82 0.00
03.01.03.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=2" m2 0.12 40.13 4.82 2.41 2.41 4.82
03.01.04 CONCRETO ARMADO 14,782.77 0.00
03.01.04.01 CONCRETO LOSA CIMENTACION F`C=210 KG/CM2 m3 0.48 382.93 183.81 91.905 91.905 183.81
03.01.04.02 CONCRETO EN MUROS F`C=210 KG/CM2 m3 1.45 413.49 599.56 299.78 299.78 599.56
03.01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 25.73 82.14 2,113.46 1056.73 1056.73 2,113.46
03.01.04.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 174.10 7.35 1,279.64 639.82 639.82 1,279.64
03.01.04.05 TAPAS PRE-FABRICADAS glb 5.00 2,121.26 10,606.30 5303.15 5303.15 10,606.30
03.01.05 REVOQUES ENLUCIDOS Y MOLDURAS 1,641.71 0.00
03.01.05.01 TARRAJEO C/IMPERMEABILIZANTE MEZCLA 1:3 e=1" m2 10.44 92.65 967.27 483.635 483.635 967.27
03.01.05.02 TARRAJEO EN MURO EXT. FROTACHADO C/MORTERO 1:5 X 1.5cm. m2 14.16 47.63 674.44 337.22 337.22 674.44
03.01.06 PINTURA 33.60 0.00
03.01.06.01 PINTADO EN MURO EXTERIOR CON LATEX VINILICO (VINILATEX O SIMILAR)m2 4.20 8.00 33.60 16.8 16.8 33.60
03.01.07 VARIOS 395.33 0.00
03.01.07.01 REJILLA METALICA DE FIERRO LISO DE 3/8" u 1.00 395.33 395.33 197.665 197.665 395.33
03.02 TANQUE SEPTICO (1 UND) 32,992.71 0.00
03.02.01 TRABAJOS PRELIMINARES 128.08 0.00
03.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 17.10 3.30 56.43 28.215 28.215 56.43
03.02.01.02 TRAZO, NIVELACIÓN Y REPLANTEO m2 17.10 4.19 71.65 35.825 35.825 71.65
03.02.02 MOVIMIENTO DE TIERRAS 2,362.49 0.00
03.02.02.01 EXCAVACION EN TERRENO NORMAL m3 48.74 45.62 2,223.52 1111.76 1111.76 2,223.52
03.02.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 17.10 5.65 96.62 48.31 48.31 96.62
03.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 1.30 32.58 42.35 21.175 21.175 42.35
03.02.03 CONCRETO SIMPLE 686.22 0.00
03.02.03.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=2" m2 17.10 40.13 686.22 343.11 343.11 686.22
03.02.04 CONCRETO ARMADO 21,448.25 0.00
03.02.04.01 CONCRETO LOSA CIMENTACION F`C=210 KG/CM2 m3 3.75 382.93 1,435.99 717.995 717.995 1,435.99
03.02.04.02 CONCRETO EN MUROS F`C=210 KG/CM2 m3 6.85 413.49 2,832.41 1416.205 1416.205 2,832.41
03.02.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 101.41 82.14 8,329.82 4164.91 4164.91 8,329.82
03.02.04.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1,017.02 7.35 7,475.10 3737.55 3737.55 7,475.10
03.02.04.05 TAPAS PRE-FABRICADAS PARA TANQUE u 3.00 458.31 1,374.93 687.465 687.465 1,374.93
03.02.05 REVOQUES ENLUCIDOS Y MOLDURAS 6,060.14 0.00
03.02.05.01 TARRAJEO C/IMPERMEABILIZANTE MEZCLA 1:3 e=1" m2 40.63 92.65 3,764.37 1882.185 1882.185 3,764.37
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA
PROYECTO: “ MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA Y ALCANTARILLADO DE LA LOCALIDAD DE SUCCHA, DISTRITO DE SUCCHA, PROVINCIA DE AIJA – ANCASH ”

ITEM DESCRIPCION UND METRADO PRECIO PARCIAL MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 TOTAL

03.02.05.02 TARRAJEO EN MURO EXT. FROTACHADO C/MORTERO 1:5 X 1.5cm. m2 48.20 47.63 2,295.77 1147.885 1147.885 2,295.77
03.02.06 PINTURA 81.12 0.00
03.02.06.01 PINTADO EN MURO EXTERIOR CON LATEX VINILICO (VINILATEX O SIMILAR)m2 10.14 8.00 81.12 40.56 40.56 81.12
03.02.07 ACCESORIOS 1,597.51 0.00
03.02.07.01 SUMINISTRO E INSTALACION DE TEE PVC-U/F DESAGÜE 110 MM S-25 UF. u 2.00 20.58 41.16 20.58 20.58 41.16
03.02.07.02 SUMINISTRO E INSTALACION DE TUBERIA PVC-U/F DESAGÜE 110 MM S-25 m 20.00 28.30 566.00 283 283 566.00
03.02.07.03 TAPA METALICA 1/8" DE 0.60X0.60 M C/SEGURO u 5.00 198.07 990.35 495.175 495.175 990.35
03.02.08 PRUEBA HIDRAULICA 628.90 0.00
03.02.08.01 PRUEBA HIDRAULICA EN TANQUE SEPTICO glb 1.00 628.90 628.90 314.45 314.45 628.90
03.03 POZO DE PERCOLACION (2 UND) 43,320.06 0.00
03.03.01 TRABAJOS PRELIMINARES 217.51 0.00
03.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 29.04 3.30 95.83 47.915 47.915 95.83
03.03.01.02 TRAZO, NIVELACIÓN Y REPLANTEO m2 29.04 4.19 121.68 60.84 60.84 121.68
03.03.02 MOVIMIENTO DE TIERRAS 13,598.96 0.00
03.03.02.01 EXCAVACION EN TERRENO NORMAL m3 116.17 45.62 5,299.68 2649.84 2649.84 5,299.68
03.03.02.02 RELLENO COMPACTADO MANUAL MATERIAL PROPIO m3 5.81 57.04 331.40 165.7 165.7 331.40
03.03.02.03 FILTRO DE GRAVA O CASCAJO m3 20.01 152.29 3,047.32 1523.66 1523.66 3,047.32
03.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 151.03 32.58 4,920.56 2460.28 2460.28 4,920.56
03.03.03 CONCRETO SIMPLE 1,165.38 0.00
03.03.03.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=2" m2 29.04 40.13 1,165.38 582.69 582.69 1,165.38
03.03.04 CONCRETO ARMADO 15,743.84 0.00
03.03.04.01 CONCRETO f 'c=210 kg/cm2 m3 11.94 432.13 5,159.63 2579.815 2579.815 5,159.63
03.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 83.74 78.88 6,605.41 3302.705 3302.705 6,605.41
03.03.04.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 554.15 7.18 3,978.80 1989.4 1989.4 3,978.80
03.03.05 ALBAÑILERIA 5,544.36 0.00
03.03.05.01 MUROS DE LADRILLO KK DE ARCILLA DE SOGA CON MEZCLA 1:4 X 1.5 cm m2 93.12 59.54 5,544.36 2772.18 2772.18 5,544.36
03.03.06 ACCESORIOS 4,415.90 0.00
03.03.06.01 SUMINISTRO E INSTALACION CODO 90° PVC ISO ALC. 110 MM S-25 UF u 2.00 35.20 70.40 35.2 35.2 70.40
03.03.06.02 TAPA DE C° A° P/BUZON u 2.00 2,172.75 4,345.50 2172.75 2172.75 4,345.50
03.03.07 REVOQUES ENLUCIDOS Y MOLDURAS 2,401.79 0.00
03.03.07.01 TARRAJEO CON IMPERMEABILIZANTES m2 23.53 43.29 1,018.61 254.6525 254.6525 254.6525 254.6525 1,018.61
03.03.07.02 TARRAJEO EN MURO EXT. FROTACHADO C/MORTERO 1:5 X 1.5cm. m2 29.04 47.63 1,383.18 345.795 345.795 345.795 345.795 1,383.18
03.03.08 PINTURA 232.32 0.00
03.03.08.01 PINTADO EN MURO EXTERIOR CON LATEX VINILICO (VINILATEX O SIMILAR)m2 29.04 8.00 232.32 77.44 77.44 77.44 232.32
03.04 CAJA DE DISTRIBUCION REPARTIDOR DE CAUDAL 9,069.94 0.00
03.04.01 TRABAJOS PRELIMINARES 29.66 0.00
03.04.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.96 3.30 13.07 4.36 4.36 4.36 13.07
03.04.01.02 TRAZO, NIVELACIÓN Y REPLANTEO m2 3.96 4.19 16.59 5.53 5.53 5.53 16.59
03.04.02 MOVIMIENTO DE TIERRAS 544.87 0.00
03.04.02.01 EXCAVACION EN TERRENO NORMAL m3 5.94 45.62 270.98 90.33 90.33 90.33 270.98
03.04.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 3.96 5.65 22.37 7.46 7.46 7.46 22.37
03.04.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 7.72 32.58 251.52 83.84 83.84 83.84 251.52
03.04.03 CONCRETO SIMPLE 158.91 0.00
03.04.03.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=2" m2 3.96 40.13 158.91 52.97 52.97 52.97 158.91
03.04.04 CONCRETO ARMADO 4,146.96 0.00
03.04.04.01 CONCRETO f 'c=210 kg/cm2 m3 2.49 432.13 1,076.00 358.67 358.67 358.67 1,076.00
03.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 27.99 78.88 2,207.85 735.95 735.95 735.95 2,207.85
03.04.04.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 120.21 7.18 863.11 287.70 287.70 287.70 863.11
03.04.05 REVOQUES ENLUCIDOS Y MOLDURAS 858.74 0.00
03.04.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 15.48 43.29 670.13 223.38 223.38 223.38 670.13
03.04.05.02 TARRAJEO EN MURO EXT. FROTACHADO C/MORTERO 1:5 X 1.5cm. m2 3.96 47.63 188.61 62.87 62.87 62.87 188.61
03.04.06 PINTURA 25.92 0.00
03.04.06.01 PINTADO EN MURO EXTERIOR CON LATEX VINILICO (VINILATEX O SIMILAR)m2 3.24 8.00 25.92 8.64 8.64 8.64 25.92
03.04.07 VARIOS 3,304.88 0.00
03.04.07.01 SUMINISTRO E INSTALACION DE VERTEDERO TRIANGULA u 4.00 826.22 3,304.88 1101.63 1101.63 1101.63 3,304.88
03.05 LECHO DE SECADO 12,571.50 0.00
03.05.01 TRABAJOS PRELIMINARES 60.50 0.00
03.05.01.01 TRAZO, NIVELACIÓN Y REPLANTEO m2 14.44 4.19 60.50 20.17 20.17 20.17 60.50
03.05.02 MOVIMIENTO DE TIERRAS 1,235.09 0.00
03.05.02.01 EXCAVACION EN TERRENO NORMAL m3 14.04 45.62 640.50 213.50 213.50 213.50 640.50
03.05.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 18.25 32.58 594.59 198.20 198.20 198.20 594.59
03.05.03 CONCRETO SIMPLE 579.48 0.00
03.05.03.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=2" m2 14.44 40.13 579.48 193.16 193.16 193.16 579.48
03.05.04 CONCRETO ARMADO 6,315.49 0.00
03.05.04.01 CONCRETO f 'c=210 kg/cm2 m3 5.56 432.13 2,402.64 800.88 800.88 800.88 2,402.64
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA
PROYECTO: “ MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA Y ALCANTARILLADO DE LA LOCALIDAD DE SUCCHA, DISTRITO DE SUCCHA, PROVINCIA DE AIJA – ANCASH ”

ITEM DESCRIPCION UND METRADO PRECIO PARCIAL MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 TOTAL

03.05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 31.23 78.88 2,463.42 821.14 821.14 821.14 2,463.42
03.05.04.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 201.87 7.18 1,449.43 483.14 483.14 483.14 1,449.43
03.05.05 REVOQUES ENLUCIDOS Y MOLDURAS 822.08 0.00
03.05.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 18.99 43.29 822.08 274.03 274.03 274.03 822.08
03.05.06 PINTURA 127.68 0.00
03.05.06.01 PINTADO EN MURO EXTERIOR CON LATEX VINILICO (VINILATEX O SIMILAR)m2 15.96 8.00 127.68 42.56 42.56 42.56 127.68
03.05.07 LECHO FILTRANTE 1,044.19 0.00
03.05.07.01 GRAVA PARA LECHO FILTRANTE glb 1.00 1,044.19 1,044.19 348.06 348.06 348.06 1,044.19
03.05.08 INSTALACIONES DE TUBERIAS 1,003.60 0.00
03.05.08.01 INSTALACION DE TUBERIAS PVC 4" m 20.00 50.18 1,003.60 334.53 334.53 334.53 1,003.60
03.05.09 COBERTURA PARA LECHO DE SECADOS 1,383.39 0.00
03.05.09.01 SUMINISTRO E INSTALACION DE COBERTURA PARA LECHO DE SECADO glb 1.00 1,383.39 1,383.39 461.13 461.13 461.13 1,383.39
03.06 VARIOS 15,521.73 0.00
03.06.01 CERCO PERIMETRICO PLANTA DE TRATAMIENTO m 49.00 116.77 5,721.73 1907.24 1907.24 1907.24 5,721.73
03.06.02 CAPACITACION EN OPERACION Y MANTENIMIENTO glb 1.00 9,800.00 9,800.00 3266.67 3266.67 3266.67 9,800.00
03.07 FLETE 64,029.68 0.00
03.07.01 FLETE TERRESTRE PLANTA DE TRATAMIENTO glb 1.00 35,031.84 35,031.84 11677.28 11677.28 11677.28 35,031.84
03.07.02 FLETE RURALPLANTA DE TRATAMIENTO glb 1.00 28,997.84 28,997.84 9665.95 9665.95 9665.95 28,997.84
COSTO DIRECTO 1,579,956.70 142,570.75 145,276.03 533,283.17 570,571.25 115,187.52 73,067.99 1,579,956.70
GASTOS GENERALES (15.68%) 247,740.00 41,290.00 41,290.00 41,290.00 41,290.00 41,290.00 41,290.00 247,740.00
UTILIDAD (10%) 157,995.67 26,332.61 26,332.61 26,332.61 26,332.61 26,332.61 26,332.61 157,995.67
SUB TOTAL 1,985,692.37 210,193.36 212,898.64 600,905.78 638,193.86 182,810.13 140,690.60 1,023,997.78
IGV (18%) 357,424.63 37,834.80 38,321.75 108,163.04 114,874.89 32,905.82 25,324.31 357,424.63
PRESUPUESTO TOTAL 2,343,117.00 248,028.16 251,220.39 709,068.82 753,068.75 215,715.96 166,014.91 1,208,317.38
PORCENTAJE DE AVANCE VALORIZADO 10.59 10.72 30.26 32.14 9.21 7.09 100.00
02 02
01.01 02.01
01.01.01 02.01.01
01.01.02 02.01.02
01.01.03 02.01.03
01.01.04 02.01.04
01.02 02.02
01.02.01 02.02.01
01.03 02.03
01.03.01 02.03.01
01.04 02.04
01.04.01 02.04.01
01.05 02.05
01.05.01 02.05.01
01.05.02 02.05.02
01.06 02.06
01.06.01 02.06.01
01.06.02 02.06.02
01.06.03 02.06.03
01.06.04 02.06.04
01.06.05 02.06.05
01.07 02.07
01.07.01 02.07.01
01.08 02.08
01.08.01 02.08.01
01.08.02 02.08.02
01.09 02.09
01.09.01 02.09.01
01.09.02 02.09.02
01.09.03 02.09.03
01.10 02.10
01.10.01 02.10.01
01.10.02 02.10.02
01.10.03 02.10.03