THE TALARA REFINERY

MODERNIZATION PROJECT (PMRT)


Scope Description
In scope
Implementation of new state-of-the-art process units, which are:

• Physical separation units: Primary Distillation - DP1, Vacuum distillation - DV3 and Gas recovery -
RG1 and RG2.

• Catalytic Reform Unit (RCA)

• Conversion units: Fluid catalytic cracking units - FCC and Flexicoking - FCK

• Sulfur reduction units: Diesel hydrotreatment –HTD, Hydrotreatment of Naphtha - HTN and FCC
Naphtha Hydrotreatment - HTF

• Auxiliary units in charge of the Cobra - SCL consortium

Out of scope
• Track and sidewalk Project.
• Home improvement near the refinery.
Acceptance Criteria
• Compliance with international construction standards.
• Decrease sulfur pollution in fuels up to 10 parts per million
• Comply with the increase in production capacity and estimated time
of 95,000 barrels per day.
Project Deliverables

🠶 21 new tanks (1.5 million barrels of capacity).


🠶 Processes units and facilities oriented to improve the quality of the
products.
🠶 Desulfurize and cleaner fuels
🠶 Improve the octane rating of gasoline.
🠶 Process heavier crudes.
🠶 Reduce waste production.
🠶 New facilities that the modernized refinery will require.
Project Exclusions

🠶 The improvement of the quality of the water.


🠶 A decoration inside and outside the proyect.
🠶 Recycling.
Project constraints

*produce a cleaner fuels.


* get a investment of $ 5 000 000
* avoiding the environment pollution
* Be respectul with the laws of the goberment
* schedule the project scope management
Project assumptions

● Develop the schedule of the company


● resources to create the fuels
● improve sells
● get along well with the goberment
● be the best company in the world