Stair and Ramp Plans for SUT Project

The document contains notes on a topic with numbers ranging from 1 to 46 in various columns and rows. It also includes the letters Q, P, O, and N.

Uploaded by

Hossam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views3 pages

Stair and Ramp Plans for SUT Project

The document contains notes on a topic with numbers ranging from 1 to 46 in various columns and rows. It also includes the letters Q, P, O, and N.

Uploaded by

Hossam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Notes:

Q Q

P P

10 10
10

O O

4550 4550 4550


2100

2100

2100

2100

2100

2100
N N
280280280280280280280280280280280280280280

14

280280280280280280280280280280280280280280

280280280280280280280280280280280280280280
43 42 43 42
13
44 41 44 41
12
45 40 45 40
11
46 39 46 39
10
47 38 47 38
9
48 37 48 37
7747

7747
8
3920

49 36 49 36

3920

4105
M 7 M
50 35 50 35
6
51 34 51 34
5
52 33 52 33
4
53 32 53 32
3
54 31 54 31
2
55 30 55 30
1
56 29 56 29

2100 350 2100


2100 350 2100 2100 350 2100
L 4550 L
1727

4.95 9.35

1727

1727

1727
0.45 TRUE NORTH

1542
Key Plan:
FFL FFL FFL
4550 4550

K K

1
10 A_421
10
10
1
J A_421 J

01-GROUND FLOOR -STAIR 02-FIRST FLOOR - STAIR 03-SECOND FLOOR - STAIR


3 1 : 50
4 1 : 50
2 1 : 50
I I

TD.00 Tender Documents NOV 2022


DD.00 Design Developement OCT 2022
REV.NO. REVISION DESCRIPTION DATE
H H

Owner /Developer:

04-ROOF FLOOR 04-ROOF FLOOR

160
13450.00 13450.00
1640.00

G G

Main Consultant :
2940

4000.00
3840.00
3840

3840

5190
Epoxy as per
finishing schedule

6090
Screed
RC (Refer to STR )
900

F 9.45 F
SECOND FLOOR FFL SECOND FLOOR
380

9450.00 9450.00
14* 160.71= 2250.00

Epoxy as per 6 Boulos Hanna St. Third Floor Tel : (202) 3760 7928
finishing schedule
Dokki , 12311 (202) 3760 7933
RC (Refer to STR ) Fax : (202) 3760 7593
Giza, Egypt
900

7.20
FFL

4500.00
E E
4120

Project :
280
14* 160.71= 2250.00

Epoxy as per
finishing schedule
Screed
RC (Refer to STR )
3310

02-FIRST FLOOR 02-FIRST FLOOR


EL SEWEDY UNIVERSITY OF
4210
380

D 4950.00 4950.00 D

TECHNOLOGY S.U.T
14* 160.71= 2250.00

Epoxy as per
finishing schedule
RC (Refer to STR )
900

2.70
FFL
4500.00
4280.00

4120
4120

280

DRAWING TITLE :
C C
14* 160.71= 2250.00

410

Epoxy as per
1960

finishing schedule

STAIR 1 - PLANS & SECTION


1550

Screed
S.O.G
0.45
01-GROUND FLOOR FFL 01-GROUND FLOOR
450.00 450.00

B B

Drawn Checked: Approved:


Y.G M.G K.G
Phase: Date: Scale Rev:

SECTION STAIR 1 NOV 2022 1 : 50 TD.00

1 1 : 50 Project No: Building No: Sheet Number


206.009 01 A_421
A A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Notes:

Q Q

10 11 10 11

P P

450
2141 12*280.00=3360.00 2549

1800
5 5

1900
2063
A_422 A_422
14*280.00=3920.00
STAIR
01 . 0B . 206 -3.65 -1.63 0.45

3823

3823

3823
O O

23
FFL FFL

3373
FFL
2141 12*280.00=3360.00
8050
8050

2023

1610

1900
2141 14*280.00=3920.00 1989

150
F F F F
N N

11 10 9

10 11 10 11

M M

-01-BASEMENT LEVEL STAIR 02 01-GROUND FLOOR STAIR 02


1 1 : 50
2 1 : 50
upper roof Epoxy as per upper roof
finishing schedule
14450.00 Screed 14450.00

900
13.69

1000

1000
RC (Refer to STR )
FFL
L L
04-ROOF FLOOR 04-ROOF FLOOR TRUE NORTH
Key Plan:

14* 151.79= 2125.00


13450.00 13450.00

10 11 10 11 Epoxy as per
finishing schedule
RC (Refer to STR )
11.58

2820
FFL

4000
3720
14* 151.79= 2125.00
K K

Epoxy as per

450
450

finishing schedule
Screed
RC (Refer to STR )

900
5 5

3185
1900

1900
A_422 A_422 SECOND FLOOR SECOND FLOOR
14* 280.00= 3920.00 1989

8500
14* 280.00= 3920.00 1979
9450.00 9450.00

14* 160.71= 2250.00


2.70 4.95 7.20 9.45
2923
3823

3823

2923

3823

3823
23

23
J J
FFL FFL FFL FFL
Epoxy as per
finishing schedule
700 1751 3920 1979
RC (Refer to STR )
1900

1900

900
7.20

3220
700 1741 14* 280.00= 3920.00 1989
2441 14* 280.00= 3920.00 1989 FFL

4500
4120
450

450

14* 160.71= 2250.00


F F F F
I I
Epoxy as per
finishing schedule
Screed
RC (Refer to STR )

900
02-FIRST FLOOR 02-FIRST FLOOR

4210

4210
4950.00 4950.00
10 11 10 11

14* 160.71= 2250.00


TD.00 Tender Documents NOV 2022
DD.00 Design Developement OCT 2022
Epoxy as per REV.NO. REVISION DESCRIPTION DATE
finishing schedule
H RC (Refer to STR ) H

Owner /Developer:
2.70

3220
02 -FIRST FLOOR PLAN STAIR 02 FFL

4500

4500
03-SECOND FLOOR PLAN STAIR 02
3

4120
4 1 : 50
1 : 50

14* 160.71= 2250.00


Epoxy as per
finishing schedule
G Screed G
RC (Refer to STR )

900

3140
Main Consultant :
01-GROUND FLOOR 01-GROUND FLOOR

4040
450.00 450.00

13* 160.00= 2080.00


1200

1200
Epoxy as per
finishing schedule
00-GRADE LEVE RC (Refer to STR )
00-GRADE LEVE
10 11 -750.00 -750.00

900
F -1.63 F
FFL

3620

3620
12* 160.00= 1920.00
2800

2800
Epoxy as per
finishing schedule
Screed

1730
RC (Refer to STR ) 6 Boulos Hanna St. Third Floor Tel : (202) 3760 7928
Dokki , 12311 (202) 3760 7933
Giza, Egypt Fax : (202) 3760 7593
450

-01-BASEMENT LEVEL -01-BASEMENT LEVEL


5791
E -3550.00 -3550.00 E
5
1900

A_422 Project :

11.58
FFL
2923
3823

23
1900

D 450 1751 14* 280.00= 3920.00 1562 EL SEWEDY UNIVERSITY OF D

TECHNOLOGY S.U.T
450

F F

DRAWING TITLE :
C C

10 11

STAIR 02 - PLANS & SECTION

B B

Drawn Checked: Approved:


Y.G M.G K.G

04-ROOF FLOOR STAIR 02 1 SECTION STAIR 02 Phase: Date: Scale Rev:


6 1 : 50
5 1 : 50
1 NOV 2022 1 : 50 TD.00

Project No: Building No: Sheet Number


206.009 01 A_422
A A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Notes:

Q Q

P P

29
16 17

O O

25
N

1500
3600
163.30
163.30
0.35 slope 1:12 F.F.L
162.70

3175
100
1 FFL slope 1:12
F.F.L
A_441 slope 1:12
N DN 7200 N

1500
1520 3600
4
A_441 162.60

50
F.F.L

16 17
M M

29

RAMP PLAN 1 RAMP PLAN 2


2 1 : 50
3 1 : 50
L L
TRUE NORTH
Key Plan:
16 17 29
LOCAL STONE

POLYURETHAN BIO
PAINTED METAL HANDRAIL

LOCAL STONE POLYURETHAN BIO


PAINTED METAL HANDRAIL
K K

1100
1100

1700
163.30 163.30
01-GROUND FLOOR 01-GROUND FLOOR 01-GROUND FLOOR
450.00 slope 1:12 162.70 450.00 450.00

600
F.F.L slope 1:12 162.60

J J

RAMP SECTION RAMP SECTION 2


1 1 : 50
4 1 : 50
I I

TD.00 Tender Documents NOV 2022


REV.NO. REVISION DESCRIPTION DATE
H H

Owner /Developer:

G G

Main Consultant :

F F

6 Boulos Hanna St. Third Floor Tel : (202) 3760 7928


Dokki , 12311 (202) 3760 7933
Giza, Egypt Fax : (202) 3760 7593

E E
Project :

D
EL SEWEDY UNIVERSITY OF D

TECHNOLOGY S.U.T

DRAWING TITLE :
C C

RAMPS DETIALS

B B

Drawn Checked: Approved:


M.Y M.G K.G
Phase: Date: Scale Rev:
1 NOV 2022 1 : 50 TD.00

Project No: Building No: Sheet Number


206.009 01 A_441