KONTRAK
NO PERALATAN KERJA SATUAN HARGA TOTAL
VOLUME
SATUAN HARGA
A. ALAT KERJA
1 Grounding Apparatus (Lengkap accessories) Set 2 155,873 311,745
2 Meger 10.000 Volt Bh 1 323,190 323,190
2 Strainging Device 2 Ton/Takel Kodokan Bh 3 104,566 313,698
3 Tang Multi Tester 600 A Bh 1 59,010 59,010
4 Phasa Squence Bh 1 39,386 39,386
5 Gunting Kawat/Kabel Besar Bh 1 25,515 25,515
5 Lampu Sorot Hologen Bh 1 6,132 6,132
6 head Lamp/Lampu Senter Kepala (12 Jam) Bh 4 1,418 5,670
7 TOOLS SET, Isi :
Kunci Inggris 19" Bh 1 3,675 3,675
Kunci Pas Set 1 11,256 11,256
Kunci Ring Set 1 11,256 11,256
Tang Kombinasi Bh 1 1,019 1,019
Obeng Plus Bh 2 788 1,575
Obeng Minus Bh 2 788 1,575
Tes Pen Bh 1 1,019 1,019
Cutter Bh 1 1,418 1,418
Kunci Pipa 24" Bh 1 3,056 3,056
Gergaji Besi Set 1 1,827 1,827
Parang Bh 2 5,114 10,227
Tali 20 mtr Bh 1 5,114 5,114
Kunci Stainless Steel Bh 1 21,672 21,672
Hand compression tool Bh 1 88,064 88,064
Lemari/Peti Alat Kerja Bh 1 13,776 13,776
Tangga Fiber 32 Feet Bh 1 453,153 453,153
Telescopik stick Bh 1 354,648 354,648
B. ALAT K3
1 Voltage Detector TM Bh 1 137,907 137,907
Helm Pengaman Bh 10 2,657 26,565
Sabuk Pengaman Standart Bh 2 33,490 66,980
Sepatu safety 20 kV Psg 2 102,396 204,792
Sarung Tangan 20 kV Psg 1 40,950 40,950
Sarung Tangan Kulit Psg 1 2,657 2,657
Jas Hujan Bh 4 2,651 10,605
Rambu-Rambu Pekerjaan Bh 2 3,890 7,779
P3K (isi 32 item) Bh 1 3,063 3,063
Apar Mobil Bh 1 2,042 2,042
ARMAN, ST
ULP MAMASA
ELANGGAN (TEKNIK)
RO) AREA MAMUJU TAHUN 2019
REALISASI
HARGA TOTAL KETERANGAN
VOLUME
SATUAN HARGA
REALISASI 2,084,500
PT PLN (PERSERO)
WILAYAH SULSEL, SULTRA & SULBAR
UP3 MAMUJU
KONTRAK
NO PERALATAN KERJA SATUAN HARGA TOTAL
VOLUME
SATUAN HARGA
I PERALATAN KERJA & ALAT K3 MOTOR RAYON
A. Alat Kerja
1 Tang Multi Tester 600 A Bh 1 59,010 59,010
2 head Lamp/Lampu Senter Kepala (12 Jam) Bh 1 1,365 1,365
B. Alat K3
1 Helm Pengaman Bh 2 2,662 5,324
2 Sepatu 20 kV Psg 1 98,511 98,511
3 sarung Tangan 20000 Volt Psg 1 40,950 40,950
4 Sarung Tangan Kulit Psg 1 2,625 2,625
5 Jas Hujan Bh 2 2,625 5,250
6 P3K Bh 1 1,785 1,785
TOTAL HARGA KONTRAK 214,820
P MAMASA
PELANGGAN (TEKNIK)
RO) AREA MAMUJU TAHUN 2019
REALISASI
HARGA TOTAL KETERANGAN
VOLUME
SATUAN HARGA
0 59,010 - Rusak
0 1,365 - Tidak Ada
KONTRAK
NO PERALATAN KERJA SATUAN HARGA
VOLUME
SATUAN
I PERALATAN KERJA & ALAT K3 MOTOR RAYON
A. Alat Kerja
1 GPS setara Garmin 62s Bh 1 204,240
2 Smart Tablet 6,4"+ (Min 4GB RAM, Camera Led Flash) Bh 1 136,160
3 Teropong kamera digital Bh 1 51,060
4 Tangga Fiber 32 Feet Bh 1 453,860
5 Telescopik stick Bh 1 356,610
6 Tang Multi Tester 600 A Bh 1 48,600
7 Phasa Squence Bh 1 32,410
8 Sabit bh 1 6,740
B. Alat K3
1 Jas Hujan Bh 2 2,300
2 P3K Bh 1 2,120
3 Sabuk Pengaman Standart Bh 1 35,660
4 Sepatu safety 20 kV Psg 1 84,240
5 Sarung Tangan 20 kV Psg 1 33,700
KONTRAK REALISASI
TOTAL HARGA TOTAL KETERANGAN
VOLUME
HARGA SATUAN HARGA
ada ba
ada ba
ada ba
ada ba
PT PLN (PERSERO)
WILAYAH SULSEL, SULTRA & SULBAR
UP3 MAMUJU
KONTRAK
NO PERALATAN KERJA SATUAN HARGA TOTAL
VOLUME
SATUAN HARGA
A. ALAT KERJA
1 Grounding Apparatus (Lengkap accessories) Set 2 155,899 311,798
2 Strainging Device 2 Ton/Takel Kodokan Bh 2 104,564 209,129
3 Tang Multi Tester 600 A Bh 1 59,105 59,105
4 Phasa Squence Bh 1 39,396 39,396
5 Gunting Kawat/Kabel Besar Bh 1 25,610 25,610
5 Lampu Sorot Hologen Bh 1 6,143 6,143
6 head Lamp/Lampu Senter Kepala (12 Jam) Bh 2 1,433 2,867
7 TOOLS SET, Isi :
Kunci Inggris 19" Bh 1 3,686 3,686
Kunci Ring Pas Set 1 11,256 11,256
Tang Kombinasi Bh 1 1,024 1,024
Obeng Plus Bh 2 819 1,638
Obeng Minus Bh 2 819 1,638
Tes Pen Bh 1 1,024 1,024
Cutter Bh 1 1,428 1,428
8 Kunci Pipa 24" Bh 1 3,066 3,066
9 Gergaji Besi Set 1 1,838 1,838
10 Parang Bh 2 5,119 10,238
11 Tali 20 mtr Bh 1 5,114 5,114
12 Kunci Stainless Steel Bh 1 21,672 21,672
13 Hand compression tool Bh 1 88,064 88,064
14 Lemari/Peti Alat Kerja Bh 1 13,787 13,787
15 Tangga Fiber 32 Feet Bh 1 453,159 453,159
16 Telescopik stick Bh 1 354,648 354,648
-
B. ALAT K3 -
1 Helm Pengaman Bh 4 2,662 10,647
2 Sabuk Pengaman Standart Bh 2 33,495 66,990
3 Sepatu safety 20 kV Psg 2 102,401 204,803
4 Sarung Tangan 20 kV Psg 1 40,961 40,961
5 Sarung Tangan Kulit Psg 1 2,663 2,663
6 Jas Hujan Bh 2 2,662 5,324
7 Rambu-Rambu Pekerjaan Bh 2 3,891 7,783
8 P3K (isi 32 item) Bh 1 3,066 3,066
9 Apar Mobil Bh 1 1,995 1,995
REALISASI
HARGA TOTAL KETERANGAN
VOLUME
SATUAN HARGA
REALISASI 1,718,223
PT PLN (PERSERO)
WILAYAH SULSEL, SULTRA & SULBAR
UP3 MAMUJU
KONTRAK
NO PERALATAN KERJA SATUAN HARGA TOTAL
VOLUME
SATUAN HARGA
A. ALAT KERJA
1 Grounding Apparatus (Lengkap accessories) Set 2 155,899 311,798
2 Strainging Device 2 Ton/Takel Kodokan Bh 2 104,564 209,129
3 Tang Multi Tester 600 A Bh 1 59,105 59,105
4 Phasa Squence Bh 1 39,396 39,396
5 Gunting Kawat/Kabel Besar Bh 1 25,610 25,610
5 Lampu Sorot Hologen Bh 1 6,143 6,143
6 head Lamp/Lampu Senter Kepala (12 Jam) Bh 2 1,433 2,867
7 TOOLS SET, Isi :
Kunci Inggris 19" Bh 1 3,686 3,686
Kunci Ring Pas Set 1 11,256 11,256
Tang Kombinasi Bh 1 1,024 1,024
Obeng Plus Bh 2 819 1,638
Obeng Minus Bh 2 819 1,638
Tes Pen Bh 1 1,024 1,024
Cutter Bh 1 1,428 1,428
8 Kunci Pipa 24" Bh 1 3,066 3,066
9 Gergaji Besi Set 1 1,838 1,838
10 Parang Bh 2 5,119 10,238
11 Tali 20 mtr Bh 1 5,114 5,114
12 Kunci Stainless Steel Bh 1 21,672 21,672
13 Hand compression tool Bh 1 88,064 88,064
14 Lemari/Peti Alat Kerja Bh 1 13,787 13,787
15 Tangga Fiber 32 Feet Bh 1 453,159 453,159
16 Telescopik stick Bh 1 354,648 354,648
-
B. ALAT K3 -
1 Helm Pengaman Bh 4 2,662 10,647
2 Sabuk Pengaman Standart Bh 2 33,495 66,990
3 Sepatu safety 20 kV Psg 2 102,401 204,803
4 Sarung Tangan 20 kV Psg 1 40,961 40,961
5 Sarung Tangan Kulit Psg 1 2,663 2,663
6 Jas Hujan Bh 2 2,662 5,324
7 Rambu-Rambu Pekerjaan Bh 2 3,891 7,783
8 P3K (isi 32 item) Bh 1 3,066 3,066
9 Apar Mobil Bh 1 1,995 1,995
REALISASI
HARGA TOTAL KETERANGAN
VOLUME
SATUAN HARGA
REALISASI 1,654,120
PT PLN (PERSERO)
WILAYAH SULSEL, SULTRA & SULBAR
UP3 MAMUJU
KONTRAK
NO PERALATAN KERJA SATUAN HARGA TOTAL
VOLUME
SATUAN HARGA
A. ALAT KERJA
1 Grounding Apparatus (Lengkap accessories) Set 2 155,899 311,798
2 Strainging Device 2 Ton/Takel Kodokan Bh 2 104,564 209,129
3 Tang Multi Tester 600 A Bh 1 59,105 59,105
4 Phasa Squence Bh 1 39,396 39,396
5 Gunting Kawat/Kabel Besar Bh 1 25,610 25,610
5 Lampu Sorot Hologen Bh 1 6,143 6,143
6 head Lamp/Lampu Senter Kepala (12 Jam) Bh 2 1,433 2,867
7 TOOLS SET, Isi :
Kunci Inggris 19" Bh 1 3,686 3,686
Kunci Ring Pas Set 1 11,256 11,256
Tang Kombinasi Bh 1 1,024 1,024
Obeng Plus Bh 2 819 1,638
Obeng Minus Bh 2 819 1,638
Tes Pen Bh 1 1,024 1,024
Cutter Bh 1 1,428 1,428
8 Kunci Pipa 24" Bh 1 3,066 3,066
9 Gergaji Besi Set 1 1,838 1,838
10 Parang Bh 2 5,119 10,238
11 Tali 20 mtr Bh 1 5,114 5,114
12 Kunci Stainless Steel Bh 1 21,672 21,672
13 Hand compression tool Bh 1 88,064 88,064
14 Lemari/Peti Alat Kerja Bh 1 13,787 13,787
15 Tangga Fiber 32 Feet Bh 1 453,159 453,159
16 Telescopik stick Bh 1 354,648 354,648
-
B. ALAT K3 -
1 Helm Pengaman Bh 4 2,662 10,647
2 Sabuk Pengaman Standart Bh 2 33,495 66,990
3 Sepatu safety 20 kV Psg 2 102,401 204,803
4 Sarung Tangan 20 kV Psg 1 40,961 40,961
5 Sarung Tangan Kulit Psg 1 2,663 2,663
6 Jas Hujan Bh 2 2,662 5,324
7 Rambu-Rambu Pekerjaan Bh 2 3,891 7,783
8 P3K (isi 32 item) Bh 1 3,066 3,066
9 Apar Mobil Bh 1 1,995 1,995
REALISASI
HARGA TOTAL KETERANGAN
VOLUME
SATUAN HARGA
REALISASI 1,543,254
DAFTAR REALISASI SEWA ALAT YANGGU ULP MAMASA
KONTRAK
NO URAIAN SATUAN HARGA TOTAL
VOLUME
SATUAN HARGA
1 Alat Kerja & Alat K2 Mobil Operasi ULP
- Mobil Operasi ULP Mamasa Set 1 2,449,535 2,449,535
2 Alat Kerja & Alat K2 Mobil Operasi Kanpel
- Mobil Operasi Kanpel Mambi Set 1 1,877,668 1,877,668
- Mobil Operasi Kanpel Sumarorong Set 1 1,877,668 1,877,668
- Mobil Operasi Pos Jaga Nosu Set 1 1,877,668 1,877,668
3 Alat Kerja & Alat K2 Motor ULP Set 1 571,867 571,867
4 Alat Kerja & Alat K2 Motor Unit Set 0 812,653 -
5 Alat Kerja & Alat K2 Inspeksi Set 1 379,000 379,000
6 Rakom Base Station Buah 4 91,452 365,810
7 Rakom HT Buah 1 47,463 47,463
8 Smart Tablet Set 2 648,900 1,297,800
TOTAL HARGA KONTRAK 10,744,477
ULP MAMASA
REALISASI KETERANGAN
HARGA
VOLUME TOTAL HARGA
SATUAN
1 2,084,500 2,084,500
1 1,718,223 1,718,223
1 1,654,120 1,654,120
1 1,543,254 1,543,254
1 - -
0 812,653 -
1 1,400,880 1,400,880
3 91,452 274,357
0 47,463 - CAS TIDAK ADA
2 648,900 1,297,800
REALISASI 9,973,134