A. JACKET FRAME
1. Peserta mendapatkan data yang berbeda sesuai tabel
2. Jacket Frame dimodelkan sesuai data masing-masing peserta di excel
3. Jarak antar pile di working point X = 15 m , Y = 10 m (sama dengan latihan)
4. Batter semua pile x=10 y=10
5. Type Leg : UNGROUTED
6. Dimensi Leg & Pile sama dengan latihan
PILE = PL1-PL5
Segment Diameter WT Fy
Pile (PL1-PL5) 42 “ 1.5 34.5 kN/cm2
Wish Bone (W.B) 30” 1” 24.5 kN/cm2
DECK LEG
1
=
=
4m
C. X-BRACE
Model vertical brace : X-Brace
Group : BR1, BR2, BR2
Type : Non Flooded
ROW
A B 1 2
Level 1 10AX 10BX 101X 102X
Level 2 20AX 20BX 201X 202X
Level 3 30AX 30BX 301X 302X
2
D. MAIN DECK
A. Member Length
B. Member Group
3
W01 = W24X162 (Fy : 24.8)
W02 = W24X131 (Fy : 24.8)
1. Member Length
2. Member Group
W01 = W24X162
W02 = W24X131
4
F. LY, SPAN
G. MARINE GROWTH
Data marine growth didapatkan dari hasil inspeksi. Densitas marine growth sebesar 1.4 T/m3.
H. CD & CM
5
I. LOAD NAME
DISCIPLINE OF LOADS CONDITION LOADING DESCRIPTION
NUMBER
6
J. ENVIRONMENTAL LOAD
2. Wind Load
Masukan semua beban dari arah sudut lain 0, 45, 90, 135, 180, 225, 270, 315
Masukan semua environment untuk 4 kondisi
WAVE LOAD
WAVE
Kondisi d T H
m s m
Normal Min Depth
Normal Max Depth
Storm Min Depth
Storm Max Depth
*isi sesuai tabel
7
Kinematic Factor : 0.9
V normal = 0.6 m/det V Strom = 1.1 m/det
K. BEBAN DI DECK
Beban-beban yang diterima struktur berdasarkan API RP 2A-WSD dapat berupa beban-beban sebagai
berikut :
1. Beban Mati
Beban mati struktur adalah berat struktur itu sendiri, semua perlengkapan yang permanen, dan
perlengkapan struktur yang tidak berubah selama beroperasinya struktur.
1 SW at Normal Operating at SWL
100 SW at Normal Operating at Min Depth
200 SW at Normal Operating at Max Depth
300 SW at Storm Operating at Min Depth
400 SW at Storm Operating at Max Depth
3. Beban Mechanical
8
Z = ELEVATION MAI DECK SESUAI DATA
Cellar Deck ELEV +9.0
4. Beban Piping
9
5. Beban Electrical & Instrument
6. Beban Hidup
Non-Wellhead
Main Deck 5 kN/m2
Cellar Deck 2.5 kN/m2
10
L. LOAD COMBINATION
11
LOAD COMBINATION - STORM OPERATING
MININUM DEPTH MAXIMUM DEPTH
0 45 90 135 180 225 270 315 0 45 90 135 180 225 270 315
LOAD 3001 3002 3003 3004 3005 3006 3007 3008 4001 4002 4003 4004 4005 4006 4007 4008
1
100
200
300 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05
400 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05
2 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05
3 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
4 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05
5 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05
6 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05
301 1.00
302 1.00
303 1.00
304 1.00
305 1.00
306 1.00
307 1.00
308 1.00
401 1.00
402 1.00
403 1.00
404 1.00
405 1.00
406 1.00
407 1.00
408 1.00
12