SUBJECT:- Proposed SITC of 1 nos. 10 pass. 15 Stops Fire Evacuation Lift at your
Ongoing Project in Mumbai.
We thank you for the opportunity given to us for the SITC of elevator in your project. As
discussed, we are pleased to submit our proposal of SITC of Fire Evacuation Lift for your kind
acceptance.
We are committed to providing customers with the highest quality products / services and
accordingly have a strong service set up.
The Product
Our elevator is a robust combination of precision and ride comfort in its class with its stunning
and elegant / well-structured designs.
Please find enclosed the proposal for your project. We are confident that you will find our
proposal in line with your requirement. If you have any queries, please do not hesitate to
contact us.
We thank you once again for the interest shown by you in our organization and look forward to
receiving your valued order.
Yours sincerely,
For, VICTORA LIFTS PVT. LTD.
(Authorized Signatory)
Rahul Vyas
Asst. General Manager- Business Development
PROJECT DATA
Overhead Height
4800 mm
Available (mm)
Total : Rs.24,85,000/-
1. Payment Terms
10 % on Acceptance
10% on GAD Approval
60% on Delivery of Material
10% on Completion of Installation.
10% on Handover Over with PWD License
Irrespective of any delay in building completion, availability of permanent power supply or
by any cause beyond our control, the final 10% will be due to us within 180 days from the
date of our intimation that material is at site.
4. Price Variation
The accepted price is valid till contract validity period and will be subject to adjustment as
per IEEMA clause. The validity of accepted price will be extended with price escalation of
10% for 12 months and then the price will be renegotiated thereafter.
Installation of each elevator will be completed in 8 weeks from the date of start of
Installation work at site. The work will start on delivery of material and subject to full
compliance of contractual terms of payment and site readiness as defined by the Indian
Standards 14665:2000. The completion period is also subject to your handing over to us
uninterrupted use of clear dry elevator pit, shaft and machine room in all respects as per
our approved drawing along with preparatory work and power supply before the beginning
of installation.
6. Statutory permissions from various authorities
We will liaison for statutory permissions for starting / executing, completing and handing
over the works from Inspector of Lifts (PWD). However fees or any other payment required
to be paid, for concerned liaison for getting above work done will be paid by you. While we
will coordinate for inspections required as per statutory requirements as applicable on the
date of this order, fees charges, pertinent license inspectorates, incidental charges for
getting work certified and out of pocket expenses will be to your account.
We require the following documents along with the "A" Form from your end for
Submission to PWD/Inspection authorities.
a. Architect’s certificate confirming the total height of the building from ground to terrace
floor level.
b. Copy of the BMC approved plan of the building attested by a registered architect along
with sanction no.
c. RCC consultant's certificate confirming the suitability of walls for lift requirements with
fire resistance of more than two hours.
d. Architect’s certificate of waterproofing required in case of common wall between
machine room and overhead water tank.
e. RCC consultant’s certificate confirming the machine room slab capacity to withstand
the load indicated by lift manufacturer.
f. A copy of building plan showing placement of lift shafts & identification of fire
lift by ‘FIRE LIFT’ marking in red.
g. Other documents.
All PWD fees and out of pocket expenses will be borne by the customer
9.Delayed Payment
We will be charging Interest @ 12% per annum on all overdue invoices lying unpaid for
greater than 15 Days, from the date of invoice. We reserve the right to dispose our
elevator material or to discontinue our work or to withhold the release of completed
elevator(s), at any time until the overdue payments, with interest, shall have been made as
per the terms & conditions and we have assurance satisfactory to us that the subsequent
payments will be made on time as they fall due.
10. Transfer of Property
The elevator shall remain our undisputed property till receiving the full payment as per the
terms of the contract. In case the payment is not made as per the terms of contract we
have the right to dismantle our elevator and take the material supplied back in our
possession. This will be without prejudice to our right to recover the unpaid amount and
interest by any means or process of proceedings whatsoever. We shall be entitled to
recover from you legal expenses incurred in collecting payments hereunder. We shall be
entitled to recover from you cost incurred in dismantling the elevator, logistics cost of
moving the same, labour cost arising with such dismantling / moving and all the applicable
taxes / duties / cess. We are not bound to furnish any document in support of such
recoveries. The depreciation in the value of the material / resale value shall also be taken
into account.
Any unutilized material, packing material etc. remaining after completion of job shall
remain our property. We have the right to take such material supplied back into our
possession.
18. Arbitration
The agreement shall be deemed to be concluded in Mumbai and only the courts in