CUMMINS INDIA LIMITED
oct REGD OFFICE: 35-A/1/2,ERANDAWANA 411038
= PUNE:
CERTIFICATE OF CONFORMANCE
Project& Package: DR.NTTPS-L&EM-CHP-PROCUREMENT OF NT-855 AND KT-1150 ENGINE SPARES AND
NT-855 ENGINEBLOCK FOR “SAN" LOCOMOTIVES
‘Contract No.P.O. No : 6600001503 CE/(O&M)/SE(A&MM)/DE/PURII/V12/2023-24 DT: 28.04.2023
‘Sub-Supplier’s Name: SRINIVASA SALES AND SERVICE PVT LTD, Vijayawada
po. | PartNo Description Balance | Tdentity ‘Specification | Make]
. ty Marks
8 | 343950 | Connector Te [a ‘OBNos | INVOICE No. ‘Spares for | CUMMINS
\aATR2324000177. | NT 855 |
DT: 11.05.2023 | and KT 1150 |
|
‘9 | 2008i7 4 a |
it | 30ie1a2 Zama WI |
tis hereby confirmed that above mentioned components/items/equipment was/were
manufactured and tested in accordance with drawings/data sheets as referred above and
found acceptable.
BES — stone YSAYUY
ae Name :M.S.R.Murthy
[ee _pesignation :Manager
Note:
Wherever a deviations are accepted Souk LA. tor, relevant details to be enclosed with
the Certificate of Conformance.
2.For Mandatory and Recommended Spares, the contractor shall furnish a 100%
Interchangeability certificate with original equipment, along with Certificate of ConformancePEP EP Ion,
Sales and
rvice
India
CIL-DBU/Dr.NTTPS/11/05/2023
Dt:11/05/2023
Deputy Executive Engineer
‘Spares, Stores & Transport. 1
Dr.Narla Tata Rao Thermal Power Station
Tbrahimpatnam - 521.456
‘Sub ~ DR.NTTPS-L&EM-CHP-PROCUREMENT OF NT-855 AND KT-1150 ENGINE SPARES AND
NT-855 ENGINEBLOCK FOR "SAN" LOCOMOTIVES - Reg
Ref: 1.Your P.0.No.6600001503 Cé/(O&M)/SE(A&MM)/DE/PURII/V12/2023-24 DT: 28.04.2023,
‘TEST CERTIFICATE
With reference to above purchase order we wish to inform you that material supplied vide below
Invoice no.V3ATR2324000174 DT:10.05.2023 material are tested for any manufacturing defects
at our factory.
OSLN z [Qty
[os
2 200517, eee [94
cts 3 3016142 to2
Results: No Leakage Observed Found Satisfactory.
‘Thanking and assuring our best service at all the times we remain
Yours Truly,
For Cummins India Limited (DBU),
Be Lareneteer
ForSRINIVASA SALES & SERVICE PVT. 1),
Rajasekhar Alapati
Key Accounts Rail & Ming Segment Shih Ssh ignstory—
i, i
‘g
is é
Sl
Ge)
aN /
Onsneta rere
Sales and
Service
India
CIL-DBU/Dr.NTTPS/10/05/2023
Dt:10/05/2023
Deputy Executive Engineer
‘Spares, Stores & Transport. 1
fa Tata Rao Thermal Power Station
“Sub ~ DRLNTTPS-LREM-CHP-PROCUREMENT OF NT-B55 AND KT-1350 ENGINE ‘SPARES AND
NT-BSS ENGINEBLOCK FOR "SAN" LOCOMOTIVES * Roo,
Ref, 1.Your P.0.No,6600001503 CE/(O&M)/SE(ARMM)/DE HPURIE/V12/2023-24 DT: 28.04.2023
‘TEST CERTIFICATE
With reference to above purchase order we wish to inform you tra, material supplied vide below
Heit cetereyaaTn2324000474 DT:10.05.2023 material are tested for any ‘manufacturing defects
at our factory.
Se
OSLNo | Inv.SLNo | Part No Description
4 1 AK T6014 SS _| Hose Flexible
7 2 “AK 6065 SS | Hose Flexible
9 3 200517 Hose Plain,
¥ 4 3081053, Hose Plain
i 5 3081283 Block Cylinder
Results: No Leakage Observed Found Satisfactory.
‘Thanking and assuring our best service atallthe times we remain
Yours Truly,
For Cummins India Limited (DBU),
Be La evetede®
Rajasekhar Alapati
‘Key Accounts. Rail & Ming Segment
aSRINNS
pill‘CUMMINS INDIA LIMITED
a REGD OFFICE: 35-A/1/2,ERANDAWANA 411038
i PUNE
CERTIFICATE OF CONFORMANCE
Project&: Package: DR.NTTPS-L&EM-CHP-PROCUREMENT OF NT-855 AND KT-1150 ENGINE SPARES AND
NT-B55 ENGINEBLOCK FOR “SAN” LOCOMOTIVES
Contract No.P.0. No ; 6600001503 CE/ (O&M) /SE(ARMM)/DE/PURII/V12/2023-24 DT: 28.04.2023
‘Sub-Supplier's Name: SRINIVASA SALES AND SERVICE PVT LTD, Vijayawada
[Be [Part Ne) Description ‘Balance | Tdentity
s ay Marks
1 | ARI60%4 | Hose Fexibie "01 Nos | INVOICE No.
ss | vaaTn2324000174
| br; 10.05.2023
7 [ARGOS SS | Hose Fieble [272 mac
‘9 | 200517 | Hose Pain a ‘OR Nos
ia | 3081053 | Wose Pin [272 aL
6 [3081283 | Block cylinder | I] x Mat
Its hereby confirmed that above mentioned components/items/equipment was/were
‘manufactured and tested in accordance with drawings/data sheets as referred above and
partes EE aon « SRY
Name :M.S.R.Murthy
Designation :Manager
Note:
1.Wherever a deviations are accepted by the contractor, relevant details to be enclosed with
the Certificate of Conformance.
2.For Mandatory and Recommended Spares, the contractor shall furnish a 100%
Interchangeability certificate with original equipment, along with Certificate of Conformance