PROJECT: CPSC HOSTEL BUILDING

LOCATION: CPSC compound, Balbagon, Mambajao, Camiguin


DATE: June 15, 2023

FINISH PAINTING OF CEILING & Walling @2ND FLOOR CR


Quantity Length (m) Height/Width (m) AREA (sq.m)
CR's
2 2.55 2.26 11.526
3 1.73 1.69 8.7711
SUB-TOTAL: 20.2971

Walling
2 1.80 1.40 5.04
2 2.40 1.53 7.344
2 1.53 0.90 2.754
2 2.17 1.53 6.6402
2 1.12 0.93 2.0832
3 1.72 1.43 7.3788
3 1.43 1.06 4.5474
3 0.70 0.50 1.05
3 1.83 1.43 7.8507
3 1.43 0.95 4.0755
Less:
5 0.60 0.60 -1.8
5 0.90 0.69 -3.0825
TOTAL: 43.8813

SUMMARY
Item Unit Cost (Php/sq.m) Area (sq.m) Cost (Php)
Ceiling Painting 90.00 20.2971 ₱1,826.74
Finish Painting 80.00 43.8813 ₱3,510.50
GRAND TOTAL: ₱5,337.24