SAUDI ARAMCO

EAST/WEST UPGRADE
SECURITY FACILITIES
SUBTITLE COMES HERE

SAUDI ARAMCO EAST/WEST UPGRADE SECURITY FACILITIES


CULTURE
Working collaboratively and building relationships with all parties to ensure the success of the project.
The Ashi & Bushnag and SAPMT will be working very closely to ensure that targets and requirements are delivered as
planned.

2
SAUDI ARAMCO EAST/WEST UPGRADE SECURITY
FACILITIES PROJECT GENERAL BACKGROUND

Sr#
OVERALL
Description
SCOPE
Sr#
OF WORK
Description
1 Replacement of Five (5) Gatehouses with an area of 29 M2 Each 15 Installation of 1.7KM of anti-vehicle barrier

2 Four (4) security support building type-1 with an area of 164.79 m2 each 16 Installation of 3.194KM of Category-3 inner fence

3 One (1) security support building type-2 with an area of 204.50 m2 17 Installation of 9.735KM of Category 1 Welded wire mesh Fence panels

4 One (1) security support building type-3 with an area of 105.79 m2 18 Installation of 9.735KM of Concertina wires

5 Construction of five (5) PIC support buildings with an area of 55 m2 each 19 Installation of 254M decorative fence

6 Five (5) generator buildings with an area of 63.64 m2 each 20 Installation of 32 walk gates

7 Installation of 10 auxiliary Drive gates 21 Installation of the pavement of 1.6KM of inner patrol road

8 Installation of 10 auxiliary Walk gates 22 Installation of 9.5KM of outer patrol road

9 Installation of 6 crash barriers 23 Install 202 zones of Microwave Intrusion Detection System (MIDS)

10 Installation of 15 drop arms 24 Install 404 zones of Fiber Optic Fence Sensing System (FOFFS)

11 Installation of 6 crash rated beams 25 Install 9 sets of Long-Range Surveillance

12 Installation of 15 emergency gates 26 Install 295 Cameras for Video Assessment & Surveillance System (VASS)

13 Installation of 48 walk gates 27 Install 20 card readers and 40 cameras as part of Access Control Systems (ACS)

14 28 Existing Fence lighting shall be demolished and replaced by new lighting


Installation of 22 turnstiles as part of the Access Control Systems (ACS)
system 4
BUILDINGS
SUPPORT
MATRIX

Package No. Pump Station PIC Support Gate House Security Support Generator Temporary
No. Building Building Building Guard House

PS-8 PICSB (Typical) GH (Typical) SSB (Type-1) GB (Typical) No Scope


Package No. 3 55 sqm 29 sqm 180 sqm 63.64 sqm

PS-9 PICSB (Typical) GH (Typical) SSB (Type-1) GB (Typical) TGH (Typical)


55 sqm 29 sqm 180 sqm 63.64 sqm

PS-10 PICSB (Typical) GH (Typical) SSB (Type-1) GB (Typical) TGH (Typical)


55 sqm 29 sqm 229 sqm 63.64 sqm

PS-11 PICSB (Typical) GH (Typical) SSB (Type-1) GB (Typical) TGH (Typical)


55 sqm 29 sqm 180 sqm 63.64 sqm

Yanbu No Scope GH (Typical) SSB (Type-1) GB (Typical) No Scope


(Not Required) 29 sqm 180 sqm 63.64 sqm

PRS-1 PICSB (Typical) No Scope SSB (Type-1) Outdoor Type No Scope


55 sqm (Existing) 115 sqm (Building Not
Required)
BUILDINGS SUPPORT NUMBER CHART

SMALL GATE NUMBERS MATRIX


Package No. Pump Station Walk Gate Auxiliary Gate Emergency Gate Drive Gate
No. W = 1.2 m W = 1.2 m W = 7.3 m W=4m
H = 2.45 m H = 2.45 m H = 2.8 m H = 2.8 m

PS-8 9 2 3 2

PS-9 14 2 4 2

PS-10 9 2 4 2

Package No.3
PS-11 9 2 2 2

Yanbu 4 2 0 2

PRS-1 6 .0 2 0
SMALL GATE NUMBERS CHART

PROJECT SITES LOCATION MAP

inMenakiyan29A8

PS8
125KMWestsidefromAl
DuwadimiTown.
10
6K

LPS9
M
M

7K
10

96
KM
PS10
KM
112

PR

Bade

SaltaandUmmAlRamthWiltteSanctuary
PROJECT SITES LOCATIONS

PS-8 PS-9 PS-10 PS-11


PUMP STATION-8 PUMP STATION-9 PUMP STATION-10 PUMP STATION-11

PROJECT SITES LOCATIONS

Pressure Reducer Station-1 Yanbu Refinery


SITE FACILITIES
Package # Location Description QTY.
Satellite Office for SA consists of One (Two persons office, small conference room, break
PS-8 1
room/pantry, and Toilet)
Satellite Office for SA consist of One (Two persons office, small conference room, break
PS-9 1
room/pantry, and Toilet)
Manager’s Office 2
One-Person Office 10
Two-Person Office 10
PS-10
One-Person Cubicle 30
Management Suites (Type AA) 10
Package 3 One Person Room for SA (Type BB) 30
Satellite Office for SA consists of One (Two persons office, small conference room, break
PS-11 1
room/pantry, and Toilet)
Manager's Office 1
One-Person Office 8
PRS-1 One-Person Cubicle 18
Management Suites (Type AA) 5
One Person Room for SA (Type BB) 20
Satellite Office for SA consists of One (Two persons office, small conference room, break

PROJECT
COMMUNICATIONS

SAPMT Subcontractors Vendors

ABC

Engineering Procurement Construction HSE Quality


Upgrade Security Facilities - Package 3 (Organization Chart)

Project Manager Key Personal


Sch. B – Attach.
Accounting Admin VII
Assistant

Procurement Engineering Construction Project Controls


QA/QC Manager HSE Manager
Manager /Interface Manger Team Supervisor

Elec./Telecom. T.O Mech. T.O Arch. T.O Structure T.O


Coordinator Lead Planner
Engineer Engineer Engineer Engineer

Group (B) Group (A)


PRS – 1 & Yanbu Refinery Pump Stations (08), (09), (10) & (11)

Group (A&B) Lead


Engineers

Quality Control Construction Materials/Warehouse Document


Safety Team Scheduler
Team Team Staff Controller

Elec. QC Mech. QC Arch./Civil Construction Site Elec. Site Mech. Security Permit Safety
Surveyors Fire Watch Flag Man
Engineer Engineer QC Eng. Superintendent Engineer Engineer Officers Receivers Officers

** All Forman's, Sub-contractors & Direct Manpower will be under supervision of ABC Construction Teams

TEAM

16
WORK BREAKDOWN STRUCTURE
PHASE DURATION NO. of Resources

17

WORK PRIORITY ALLOCATION


TASK TASK TASK PRIORITY ASSIGNED ASSIGNED DEADLINE
TYPE STATUS TO DATE

18
PROJECT TRACKING PLAN

HEALTH, SAFETY AND


ENVIRONMENTAL
REQUIREMENTS
ABC Safety Policy: ABC Contracting Company recognizes its
responsibility of creating, executing and sustaining culture with
high standards of HSE Policy. We fully believed that all
injuries, incidents and health hazards can be prevented. Our
policy is zero accident. We strongly promote a safe and healthy
working environment and the well-being of our employees and
the Project Workforce.

ABC shall comply with the provisions of the SAUDI


ARAMCO Construction Safety Manual (CSM), SAUDI
ARAMCO Safety Handbook, Sanitary Code, Hazardous
Waste Code, Environmental Policies and all other such
related requirements and any other successor manual or
manuals that replace these.

20
AND
ENVIRONMENTAL
REQUIREMENTS
ABC shall develop and implement an Environmental Management
Plan (EMP) to cover the WORK under the Contract. The EMP shall
include all environmental aspects of the project and identify mitigation
measures and their implementation method and schedule. The EMP
shall be submitted to EPD for review and approval. The EMP shall
identify, by name, and provide contact information of the
CONTRACTOR's Environmental Manager and the Site environmental
engineer.

ABC may request assistance from SAUDI ARAMCO with respect to


the implementation of its Safety, Health and Environmental
Requirements. The Company Representative (or the Company
Representative's designated party or parties) may provide assistance to
the ABC by explaining good safety and sound environmental practices,
pointing out unsafe conditions, and by applying experience and
judgment, to assist CONTRACTOR in improving safety and to
safeguard the environment.

QUALITY ASSURANCE & QUALITY CONTROLS


1. We, Ashi & Bushnag Company, ensure and maintain to deliver the
quality management system to the project.

2. To continually maintain high level of quality standards in operations and


functions.

3. ABC shall develop and comply with a Quality Control/Quality


Assurance Program in conformance with ISO 9000 and 90001 and
consistent with ISO 10005, shall inspect and test all its WORK, and shall
provide SAUDI ARAMCO with access to all locations where the WORK
is being performed for the purpose of performing additional inspection and
testing.

4. Strive to continually review and improve our quality through customer


service and internal audits.

5. To enhance the customer satisfaction and reduce the customer


complaints.
THANK YOU!