SAUDI ARAMCO EAST/WEST UPGRADE SECURITY
FACILITIES PROJECT GENERAL BACKGROUND
Sr#
OVERALL
Description
SCOPE
Sr#
OF WORK
Description
1 Replacement of Five (5) Gatehouses with an area of 29 M2 Each 15 Installation of 1.7KM of anti-vehicle barrier
2 Four (4) security support building type-1 with an area of 164.79 m2 each 16 Installation of 3.194KM of Category-3 inner fence
3 One (1) security support building type-2 with an area of 204.50 m2 17 Installation of 9.735KM of Category 1 Welded wire mesh Fence panels
4 One (1) security support building type-3 with an area of 105.79 m2 18 Installation of 9.735KM of Concertina wires
5 Construction of five (5) PIC support buildings with an area of 55 m2 each 19 Installation of 254M decorative fence
6 Five (5) generator buildings with an area of 63.64 m2 each 20 Installation of 32 walk gates
7 Installation of 10 auxiliary Drive gates 21 Installation of the pavement of 1.6KM of inner patrol road
9 Installation of 6 crash barriers 23 Install 202 zones of Microwave Intrusion Detection System (MIDS)
10 Installation of 15 drop arms 24 Install 404 zones of Fiber Optic Fence Sensing System (FOFFS)
12 Installation of 15 emergency gates 26 Install 295 Cameras for Video Assessment & Surveillance System (VASS)
13 Installation of 48 walk gates 27 Install 20 card readers and 40 cameras as part of Access Control Systems (ACS)
Package No. Pump Station PIC Support Gate House Security Support Generator Temporary
No. Building Building Building Guard House
PS-8 9 2 3 2
PS-9 14 2 4 2
PS-10 9 2 4 2
Package No.3
PS-11 9 2 2 2
Yanbu 4 2 0 2
PRS-1 6 .0 2 0
SMALL GATE NUMBERS CHART
inMenakiyan29A8
PS8
125KMWestsidefromAl
DuwadimiTown.
10
6K
LPS9
M
M
7K
10
96
KM
PS10
KM
112
PR
Bade
SaltaandUmmAlRamthWiltteSanctuary
PROJECT SITES LOCATIONS
PROJECT
COMMUNICATIONS
ABC
Elec. QC Mech. QC Arch./Civil Construction Site Elec. Site Mech. Security Permit Safety
Surveyors Fire Watch Flag Man
Engineer Engineer QC Eng. Superintendent Engineer Engineer Officers Receivers Officers
** All Forman's, Sub-contractors & Direct Manpower will be under supervision of ABC Construction Teams
TEAM
16
WORK BREAKDOWN STRUCTURE
PHASE DURATION NO. of Resources
17
18
PROJECT TRACKING PLAN
20
AND
ENVIRONMENTAL
REQUIREMENTS
ABC shall develop and implement an Environmental Management
Plan (EMP) to cover the WORK under the Contract. The EMP shall
include all environmental aspects of the project and identify mitigation
measures and their implementation method and schedule. The EMP
shall be submitted to EPD for review and approval. The EMP shall
identify, by name, and provide contact information of the
CONTRACTOR's Environmental Manager and the Site environmental
engineer.