Principal Room Construction Plans

The document is a floor plan for the proposed construction of a principal room at a government college in Meerut, Uttar Pradesh. It shows the dimensions for the layout of the principal room, which is 4000mm by 3000mm. There is a terrace shown that is 3230mm by 3460mm located next to the principal room. Dimensioning and notes are provided to clarify the drawing.

Uploaded by

Aman Rawat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
372 views3 pages

Principal Room Construction Plans

The document is a floor plan for the proposed construction of a principal room at a government college in Meerut, Uttar Pradesh. It shows the dimensions for the layout of the principal room, which is 4000mm by 3000mm. There is a terrace shown that is 3230mm by 3460mm located next to the principal room. Dimensioning and notes are provided to clarify the drawing.

Uploaded by

Aman Rawat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

100

Millimetres

4460 Y
230 230
10

4000 R
0

230
230
900

X X
PRINCIPAL ROOM

3460
1200

4000X3000 TERRACE
3460

3230
900

B
230

1200 WD VER.

TERRACE
ST - 1 UP

A Y

3100 900
230 230
4460

PLAN

Notes: Agency: Architects: Project Title:

5D
architecture
· All dimensions to be read not to be scaled. UTTAR PRADESH interior
planning PROPOSED CONSTRUCTION OF PRINCIPAL
PROJECTS
· This drawing supercedes all other previous drawings. CORPORATION ROOM AT VARIOUS GOVT. COLLEGE, MEERUT,
· Dimensions are in inches except otherwise. LIMITED
U.P.
· This drawing should be read in conjunction with relevant structural Client: Drawing Title: Project Stage:
drawing & any discrepancy noticed should be got clarified before PRINCIPAL ROOM
SRENGISE
execution. GROUND FLOOR WD
· The drawing is the property of the architects. 5D & Associates
ARCHITECTURE,INTERIOR & PLANNING Paper Size: Discipline: Date: Scale:
· Any copying or reproduction of this drawing should only be done after a External Consultant:
C-91, VIBHUTI KHAND, GOMTINAGER,, LUCKNOW.
A3 ARCHITECTURE 2023-04-04
written permission of the architects. R00 2023-02-22 First Issue Bhavna Vaibhav Shashank
Designed: Checked: Designed:
Ph - 7903561304,9565077981
Checked: Revision:
Drawing:
· Any defaulter is liable to be sued for the violation of the copyright act. REV DATE DESCRIPTION Originator Checked Approved -- -- Bhavna Vaibhav WD_R00_UPPCL_PR_UP15_AR_02221 R00
100

300
+ 4050 + 4050

300
Millimetres
10
0

3600

3600
4050

4050
+ 450 + 450

± 0.00 ± 0.00

450

450

PLAN
SECTION - XX SECTION -YY

300

300
+ 4050 + 4050
3600

3600
4050

4050
+ 450 + 450

± 0.00
450

± 0.00

450
ELEVATION - A ELEVATION - B

Notes: Agency: Architects: Project Title:

5D
architecture
· All dimensions to be read not to be scaled. UTTAR PRADESH interior
planning PROPOSED CONSTRUCTION OF PRINCIPAL
PROJECTS
· This drawing supercedes all other previous drawings. CORPORATION ROOM AT VARIOUS GOVT. COLLEGE, MEERUT,
· Dimensions are in inches except otherwise. LIMITED
U.P.
· This drawing should be read in conjunction with relevant structural Client: Drawing Title: Project Stage:
drawing & any discrepancy noticed should be got clarified before PRINCIPAL ROOM
SRENGISE
execution. ELEVATION & SECTION WD
· The drawing is the property of the architects. 5D & Associates
ARCHITECTURE,INTERIOR & PLANNING Paper Size: Discipline: Date: Scale:
· Any copying or reproduction of this drawing should only be done after a External Consultant:
C-91, VIBHUTI KHAND, GOMTINAGER,, LUCKNOW.
A3 ARCHITECTURE 2023-04-04
written permission of the architects. R00 2023-02-22 First Issue Bhavna Vaibhav Shashank
Designed: Checked: Designed:
Ph - 7903561304,9565077981
Checked: Revision:
Drawing:
· Any defaulter is liable to be sued for the violation of the copyright act. REV DATE DESCRIPTION Originator Checked Approved -- -- Bhavna Vaibhav WD_R00_UPPCL_PR_UP15_AR_03221 R00
1 PB1 PROJECT
PROPOSED STRUCTURE FOR PRINCIPAL
ROOM AT VARIOUS GOVT. COLLEGE,
MEERUT, U.P.
Notes:-

LB1= PLINTH BAND [General]


[1] All dimensions are in m.m. unless otherwise mentioned.

PB1
1 AS 230X150 WITH [2] Only figured dimensions are to be followed neither the bars shall be counted nor the
dimensions scaled from the drg.

PB1
[3] Any discrepancy in the drgs. shall be brought to the notice of the architect / consultant and
2-12Ø AT TOP AND clarification obtained in writing prior to execution of work.
[4] High yield strength deformed bars of yield stress 500 n/mm² (fe-500) which shall conform
BOTTOM AND RING to1786-1985 shall be used as reinforcement
[5] Clear cover of main reinf. shall be as follows. (a) footing = 50 mm (b) column = 40 mm (c) beam = 25
PRINCIPAL ROOM
1
mm (top & bottom) or dia of bar whichever is more (d) slab = 20 mm (e) waist slab = 25 mm
1 4000 X 3000 1 1 AS 8Ø@200MMC/C [6] End/side cover of all reinforcement in beams & slab = 25 mm. or dia of bar whichever is more
[7] The cover block of cement mortar shall be used to ensure the reqd. cover of reinforcement
[8] Development length ( Ld ) for different dia meter of bars for conc. mix of grade M - 20 shall
be = 56 x dia of bar
[9] Conc. mix for r.c.c. work shall be of grade M - 25 conforming to I.S. 456 - 2000.
230 [10] Necessary fixture for electrical, plumbing, etc. shall be provided in slab, beams before
execution as per relevant drgs.
[11] The structure has been designed for G.F.+ 1 = 2 storey

150 150 150


[12] P.C.C.(1:4:8) shall be provided.

1000
345
1 PB1 [13] All plain concrete & rcc shall be strictly in accordance with the provision of IS - 456:2000.
[14] Cutting,bending,fixing & placing of bars shall be in accordance with IS - 2502:1968,
IS - 5525:1969 & IS - 456:2000
460
[Foundation]
575 [1] The layout of building shall be given from the arch. drg.
[2] The design data for foundation has been taken from soil test report provided by the client
[3] Earth below foundation shall be properly rammed & consolidated before laying lean concrete.

[Columns]

2 1
PB1 725 [1] Ties in portion of col. & beam junction shall be same as end zone.

2 2 2 2 [2] The spacing of ties at overlaps should not exceed 100 mm. c/c
[3] Over laps are allowed only at middle zone of the columns.
DETAIL OF PLINTH BAND SEC. AT 1-1
[4] Not more than 50 % of bars shall be lapped at a section and laps shall be staggered.
[5] Ties in portion of col. below tie beam shall be same as end zone .
[6] Vertical bars of rcc column at top slab shall be extended upto top of beam & bent into beam
by development length.

[Beams]
[1] For location of beams refer slab plan.
[2] The spacing of stirrups at overlaps should not exceed 100 mm. c/c
[3] Where two layers of reinf. bars are to be provided, spacer bar are to be provided at spacing of

2 P.LVL. 1000 mm. max. and the dia of the spacer bar shall be higher of dia of longitudinal bars or 25 mm.
[4] Max. 3 nos. of bars shall be provided in a layer of 230 mm wide beam.

2#10 [5] At the junction of two diff. number of beams the higher reinf. at the support shall be adopted.
[6] Over lap in top bars shall be near mid span & in bottom bars shall be near support or at support.
[7] The depth of beam monolithic with slab as specified in schedule shall be inclusive of slab
thickness unless otherwise specified.

EXCAVATION PLAN OF FOOTINGS #8@200 [Slabs]


[8] Hooks in stirrups of beams shall be bent inside at 135° & length of hooks shall be
10 x dia of bar of stirrups

LB1 S1
[1] For slab reinforcement refer table-4 (detail of slab reinforcement).

150
[2] Alternate bottom bars shall be curtailed at l / 7 of span as shown in typ. section of slab.
[3] Extra bars shall be provided at top face as shown in typ. section of slab.

2#10 [4] The cross reinf./temp. reinf. below top reinf of slab .i.e.#8@300c/c is to be provided just
below the main top steel as shown in typ. sec.of slab.
[5] The first main bar of slab shall be placed at 80 mm. or half the spacing specified
whichever is less from the face of support

G.LVL. [Masonry work]

LB1= LINTEL BAND 75 [1] 115 th.(1/2 brick) wall -1:4 cement: sand mortar shall be used & #8,1 nos. bars at every 4th course
shall be provided
[2] 230 th.(1 brick) wall - 1:6 cement: sand mortar shall be used.
LB1

[3] The vertical face of concrete at junction of wall & rcc member shall be raked to give a rough surface
AS 230X150 WITH G. LVL. & 1:4 cement:sand mortar should be applied to developed bond between brick & rcc member.
230
LB1

2-10Ø AT TOP AND REVISION


References : IS 456 - 2000, IS - 13920 - 2016, IS - 1893 part (1) : 2016, SP-16 , SP-34
BOTTOM AND RING arch. drg. no. - all arch. drgs

AS 8Ø@200MMC/C S.N. DATE DESCRIPTIONS INITIAL

750

150 150 150


345

900
DRG. TITLE:
150

STRUCTURE OF PRINCIPAL ROOM

DETAIL OF STEPS 460


CONSTRUCTION AGENCY :

DETAIL OF SLAB L.C.


LB1
600 ARCHITECT CONSULTANTS:

5D
architecture
interior
planning

DETAIL OF LINTEL BAND 5 Designers


ARCHITECTURE,INTERIOR & PLANNING

SEC. AT 2-2 C-91, VIBHUTI KHAND, GOMTINAGER,, LUCKNOW.


Ph - 9565.77981, 7903561304
SRENGISE

Drawn By

Table-2, Details of Slab Reinforcement Design Team Er. Vineet Kr. Singh

Principal Consultant Er. Pragya Patel


Slab Depth (mm)

B.Tech (Civil) M.Tech (Structures)

REINFORCEMENT Dated Scale


Apr. - 2022 N.T.S.
Sheet No.
Slab No.

DRG. NO.
ST-02 (SIGNATURE & STAMP OF CONSULTANT)
Sr. No.

Parallel to Shorter Span (Main bars) Parallel to Longer Span (Cross bars) STRUCTURAL CONSULTANTS Er. Pragya Patel
B.Tech (Civil) M.Tech (Structures)

At Bottom face At Top face At Bottom face At Top face


(Mid Span) (Extra bars at support) (Mid Span) (Extra bars at support) CRS CRS ENGINEERS
ROOP PLAZA BUILDING
SHEIKHPURA KASAILA, GOMTI NAGAR

1 S1 125 #8@150c/c #8@150c/c #8@200c/c #8@200c/c LUCKNOW -FAIZABAD ROAD, LUCKNOW