Professional Documents
Culture Documents
Form BERDE Registation 2022-1
Form BERDE Registation 2022-1
BERDE Registration
Instructions
1. Download the Form – BERDE Registration.
2. Completely accomplish the form.
3. Save or export the accomplished form as Portable Document File (.pdf).
4. Prepare the supporting documents.
a. Organizational chart for the project,
b. Report on the regulatory compliance review for the project,
c. Plans and images reflecting the scope of the project, which must include:
i. Site development plan,
ii. Lot plan,
iii. Floor plans,
iv. Front elevation,
v. Longitudinal section, and
vi. Perspective image of the project.
d. Valid ID of Project Owner Authorized Representative,
e. BIR Form 2303 of the Project Owner,
f. BIR Form 2303 of the Representative Company – Optional, and
g. Project owner’s logo – Optional,
5. Submit the accomplished form and all supporting documents through email at
berde@philgbc.org.
By using and submitting this form and requirements for the registration, you are agreeing and
authorizing the PHILGBC to collect, store, and use your information included in this form and the
requirements for the BERDE Program, particularly for the registration of the project for BERDE
Certification.
Project Information
Project Name
Project Location
Building No., Lot No., Street
Barangay City/Municipality Province
Region ZIP Code Country
Zoning Classification
Building
New construction – Stage 1 and Stage 2
Renovation – Stage 1 and Stage 2
Operations – Stage 3
Tenant
Fit-out – Stage 1 and Stage 2
Operations – Stage 3
Projects must be registered under the latest version of BERDE at the time of registration. The
project must complete the certification process while the version of the rating scheme is active.
Projects may not be certified under obsolete rating schemes.
Active rating schemes that may be used for certification are the current version and the previous
major version. For example, the active rating schemes are Version 3 to current Version 4.
If a new version for BERDE is officially released, the project owner may request to upgrade to the
new version. Projects are only upgraded to the current version of BERDE upon approval of the
request. The project may not be downgraded to older versions of BERDE.
Yes
No
Is the project seeking incentives through the use of BERDE Certification?
Yes
No
Only areas declared in the registration will be part of the scope of the assessment of the project.
Occupancy Classification
Choose all applicable occupancy classification for your project and indicate the specific use under the
column `Use`. For mixed-use developments, indicate the GFA of spaces with the related
classification.
Occupancy classification is based on Rule VII – Classification and General Requirements of all
Buildings by Use or Occupancy, Revised Implementing Rules and Regulation of P.D. No. 1096
(2004).
Classification
Classification
Use Use
Occupancy
Occupancy
indicate the specific use Gross Floor indicate the specific use Gross Floor
under the occupancy Area under the occupancy Area
classification for the in sqm. classification for the in sqm.
project project
Completion Date
For new construction, renovation and fit-out projects, indicate the estimated date of completion of
the project. For operations projects, indicate the start date of operations of the project.
Schedule of Activities
Kick-off Meeting
The Kick-off Meeting must be scheduled within one (1) month from the registration date. Hosted
by the PHILGBC through a conference call, the meting must be scheduled for a minimum of one (1)
hour and a maximum of two (2) hours, during office hours 8:00 a.m. to 5:00 p.m. (PHT, UTC +8)
Target Kick-off Meeting Date Day Month Year Proposed Time must be during office hours
Assessment Activities
Stage 1 Certification – For new construction, renovation or fit-out projects only
Round 1 Submissioni Day Month Year Round 2 Submissionii Day Month Year
Stage 2 Certification – For new construction, renovation or fit-out projects only
Round 1 Submission Day Month Year Round 2 Submission Day Month Year
On-site Assessmentiii
Stage 3 Certification – For operations projects only
Round 1 Submission Day Month Year Round 2 Submission Day Month Year
On-site Assessment
How would you describe the spaces and utilities in the project?
What are the uses of the different spaces in the project? What is the general layout or design for the
spaces? How would you describe the common spaces in the project? How would you describe the
utilities for the project, including energy, water, waste, sanitation and parking facilities?
Filename
Target Rating
What is the target rating for the project?
5-Star Rating
4-Star Rating
3-Star Rating
2-Star Rating
1-Star Rating
Mailing Address
Building No., Lot No., Street
Barangay City/Municipality Province
Region ZIP Code Country
Contact Information
Phone Number Include country and area codes
( )
Mobile Number
( )
PHILGBC Membership
Are you a PHILGBC Member? PHILGBC Membership Number
Yes No
Tax Identification Number (TIN) for the issuance of invoices and official receipts
Submit a copy of the BIR Form 2303 of the Project Owner.
FILENAME
Authorized Representative
The Authorized Representative for the Project Owner must be the top management or chief executive.
Please submit a copy of the valid ID of Authorized Representative.
Company Name
Mailing Address
Building No., Lot No., Street
Barangay City/Municipality Province
Region ZIP Code Country
Contact Information
Phone Number Include country and area codes
( )
Mobile Number
( )
PHILGBC Membership
Are you a PHILGBC Member? PHILGBC Membership Number
Yes No
Authorized Representative
The Authorized Representative for the Representative Company must be the top management or
chief executive.
Representative Company Signature over Printed Name and Designation Date
Project Owner Signature over Printed Name and Designation Date
The MR must be employed and part of the senior management of the project owner. Access to
the project files and all official communications will be provided only to the MR and the GBP.
Mailing Address
Building No., Lot No., Street
Barangay City/Municipality Province
Region ZIP Code Country
Contact Information
Phone Number Include country and area codes
( )
Mobile Number
( )
Email Address
You may contact the BERDE Program Secretariat through e-mail at berde@philgbc.org to see, copy,
or correct the information submitted here. In addition, you may send an e-mail to lodge a related
complaint or withdraw your consent.
Management Representative Signature over Printed Name and Designation Date
Authorization
Please select this option if agree and authorize the MR for coordinating and rendering
approvals and decisions for the project owner as expeditiously as necessary to ensure the
orderly and efficient progress of the certification of the project.
Project Owner Signature over Printed Name and Designation Date
Access to the project files and all official communications will be provided only to the MR and the
GBP.
Mailing Address
Building No., Lot No., Street
Barangay City/Municipality Province
Region ZIP Code Country
Contact Information
Phone Number Include country and area codes
( )
Mobile Number
( )
Email Address
GBP Qualifications
If the GBP is a Certified BERDE Professional (CBP), indicate the CBP Number and Certification Date.
Do not fill out `Training Institution` and `Certification Body` sections. If the GBP is not a CBP, answer
all fields.
Mailing Address
Building No., Lot No., Street
Barangay City/Municipality Province
Region ZIP Code Country
Contact Information
Phone Number Include country and area codes
( )
Email Address
Mailing Address
Building No., Lot No., Street
Barangay City/Municipality Province
Region ZIP Code Country
Contact Information
Phone Number Include country and area codes
( )
Email Address
You may contact the BERDE Program Secretariat through e-mail at berde@philgbc.org to see, copy,
or correct the information submitted here. In addition, you may send an e-mail to lodge a related
complaint or withdraw your consent.
Green Building Professional Signature over Printed Name and Designation Date
Authorization
Please select this option if agree and authorize the GBP access to project files, and
coordinate and facilitate the BERDE Certification process for the project.
Project Owner Signature over Printed Name and Designation Date
Roles And
Roles Company Name Contact Person Designation Contact Number Email Address
Responsibilities
Submit a report on the regulatory compliance review for the project, which should include
information on:
All applicable building and environmental laws, regulations for the project, and
Status of compliance of the project with the applicable regulations..
FILENAME
2. MSR-02 Distinct and clear boundaries
Declare the distinct and clear boundaries for the project.
You must declare if the project will be sharing facilities and utilities as a part of a larger project
development, estate, or campus. Use the Error: Reference source not found section.
Yes
No
Submit a copy supporting documents that reflect the scope of the project.
a. Site development plan,
b. Lot plan,
c. Floor plans,
d. Front elevation,
e. Longitudinal section, and
f. Perspective image of the project.
FILENAMES
Do you commit to sharing energy, water, materials, and waste data from your project?
Yes
No
You are allowing the PHILGBC to collect, use, store and retain your data, which includes:
Managing your project data in local and online servers and databases of the PHILGBC;
Using your data to send you information on the status of the BERDE Certification for the
project;
Displaying your project name, project image or photo, project owner name, project owner’s
logo, project location, registration date, and certification awarded in promotional materials,
public announcements or mentions in articles or posts in:
Social media,
Official website,
Press releases,
Report and documentation, and
Physical promotional materials;
Using your data and including your project name, project image or photo, project owner
name, project owner’s logo, project location, registration date, and certification awarded in
materials for education and training;
Using your data in communicating activities and impacts of the PHILGBC to partners and
other interested parties in reputable external materials and channels in promoting BERDE
and green building;
Using your contact information to send you information on activities and programs of the
PHILGBC and its partners;
Continuously using, storing and retaining your project information until you formally withdraw
your consent, at which time you accept that the PHILGBC can no longer withdraw or stop the
use of past materials where your data were used.
You may contact the BERDE Program Secretariat through e-mail at berde@philgbc.org to see, copy,
or correct the information submitted here. In addition, you may send an e-mail to lodge a related
complaint or withdraw your consent.
Project Owner Signature over Printed Name and Designation Date
I confirm that all information in this application are true, complete and correct.
I commit to complying with the requirements and completing the BERDE Certification
process.
I recognize the goal of the certification is to measure the environmental, economic and social
performance of our project, above and beyond building and environmental laws, regulations,
and mandatory standards.
I commit to ensure that the project complies with the applicable laws, regulations, local
ordinances, and mandatory standards that directly affect the design, construction, and
operations of the project.
Project Owner Signature over Printed Name and Designation Date