HARGA MATERIAL HARGA JASA

No Item Item Description Qty UoM Remark


Satuan Total Satuan Total

Cost setting:
- Tiang lampu PJU 9,5M --> 9 set (include braket lampu)
- Tiang lampu PJU 6Bx12M --> 2set (include braket lampu)
-Include cable twisted 2cx6mm 150M
1 Material Material 1 EA 196,246,000 196,246,000 23,549,520 23,549,520
-Include cable nyyhy 4c x 6mm--> 50
M
-Include Conduit G28 --> 3Pc(include
accesories+flexible hitam)

Tiang Lampu PJU P. 9500mm,


2 Tiang Lampu PJU Ukuran 5B x 4B x 3B x 2.5B, 9 PC 16,400,000 147,600,000 1,968,000 17,712,000 Hotdeep galvanized
Include Pondasi

Tiang Lampu PJU, P. 12000mm, Hotdeep (include lampu sorot


3 Tiang Lampu PJU Ukuran 6B x 12B, Include 2 PC 36,800,000 73,600,000 4,416,000 8,832,000 500W-->4 unit, box panel + mcb 2
Pondasi dan Box Panel unit)

Tiang Lampu PJU P. 3000mm,


4 Tiang Lampu PJU 5 PC 5,800,000 29,000,000 696,000 3,480,000 Hotdip Galvanis
Ukuran 2.5B

Tiang Lampu PJU P. 7000mm,


5 Tiang Lampu PJU Ukuran 5B x 4B x3B x 2.5B 2 PC 10,800,000 21,600,000 1,296,000 2,592,000 Hotdip Galvanis
include pondasi

- Pasang tiang PJU


- Include kabel twisted 2c x 6mm = 50m
6 Load Cost Load Cost 1 EA 14,980,000 14,980,000 1,797,600 1,797,600 - include cable NYYHY 3c x 2.5mm = 30m
- Include clipsal 20mm = 10 btg
- Wiring cable = 80m

TOTAL 483,026,000 57,963,120

TOTAL MATERIAL DAN JASA 540,989,120

CATATAN : 1.PEKERJA BERSERTIFIKAT TKPK (KETINGGIAN)


2.K3 KETINGGIAN
3.TERMASUK HARGA PONDASI DAN ANGKUR
4.FRANCO MATERIAL ON SITE
1 Tiag lampu PJU 9,5M 9 set
Tiang lampu PJU 6Bx12M 2 set
Include cable nyyhy 4c x 6mm 50 m
cable twisted 2cx6mm 150 m
Conduit
Flexible Hitam

1 Tiag lampu PJU 9,5M 1 set


Include cable nyyhy 3c x 2.5mm 1 m
cable twisted 2cx6mm 1 m
Conduit
Wiring Kabel 80 m
8,200,000 73,800,000
9,800,000 19,600,000
59,000 2,950,000
6,500 975,000
750,000 750,000
48,000

98,123,000

5,800,000 5,800,000
20,000 20,000
6,500 520,000
150,000 150,000
1,000,000

7,490,000