You are on page 1of 1

Quality Assurance:

To ensure quality performance across the network we will be using network simulators such as OPNet, packet tracer and GNS3 to simulate the
overall network taking wired and wireless connections, administrational access, redundancies, performance, network security, server
infrastructure and host device simulation into account. The above is calculated and implemented using bandwidth allocation, number of hosts
and devices management as metrics for the above test cases. As show in the traceability chart each test deal with a particular task of the overall
project allowing the project team to get a simulation of the projects quality. Finally, the last phase will deal with physical quality insurance
through troubleshooting and testing.

System
Technical Assumption(s) Technical / Network & Security Architectural/Design Technical Software Test Case
ID Status Component(s)/implemented TestScenario Verified by
and/or Customer Need(s) Requirement Document Specification Module(s) Number
in
Fully functional and
configured wired network
connecting all hosts of each
Network devices (routers, Network department with the Virtual Virtual
R1 Wired Network Infrastructure switches, etc) In Progress Documentation necessary access All three layers Simulation T-101 enviroment PM, Head of Networking and Security Consultant
Wireless network devices
Fully functional and
(WiFi Access Points, Network configured wireless BYOD Virtual Virtual
R2 Wireless Network Infrastructure Switches, Routers, Cabling) In Progress Documentation concept based network. All three layers Simulation T-102 enviroment PM, Head of Networking and Security Consultant
Only specified departments
Restricted Administrative and personnel should have
administrative and limited
and maintanance access to Network unrestricted access to the Virtual Virtual
R3 Administratorial Access networks In Progress Documentation network All three layers Simulation T-103 enviroment PM, Head of Networking and Security Consultant
Redundant devices and
connections, to keep the
Network devices (routers, network up and running in
the case of certain devices
switches, etc), Redundant Network failing or having significant Virtual Virtual
R4 Redundancy power systems In Progress Documentation downtime. All three layers Simulation T-104 enviroment PM and Head of Networking

Network devices (routers, Network Bandwidth, user allocation Monitoring Virtual


R5 Performance switches, etc) In Progress Documentation and contingency All three layers software T-105 enviroment PM and Head of Networking
Firewall configs, port
Network security and user access Monitoring Virtual
R6 Network Security ASA, IDS/IPS and Antivirus In Progress Documentation security All three layers software T-106 enviroment PM, Head of Networking and Security Consultant
Servers managing the FTP,
DNS, DHCP, WEB and MAIL
services and Archival and
Backup storages. Some on- Core/Top layer
site, the rest off-site
Servers and Data Center Network managed by a VPS Service- and Off-site data Virtual Virtual
R7 Server Infrastructure devices In Progress Documentation Provider stores Simulation T-107 enviroment PM, Head of Networking and Security Consultant
The final fully functioning
network implementing all
Network requirements listed Final Physical
previously, with all devices
Fully Functioning and Client-ready Documentation and and hosts up and running, Product - No Final
R8 Network Final cumalative product In Progress project report ready for use. All three layers Virtual testing T-108 Product PM, Head of Networking and Security Consultant