1 2 3 4 5 6 7 8 9 10 11 12 13
93000
6500 9000 9000 9000 6500 7000 7000 8300 8400 8300 7000 7000
TUBE
+718.45 462 150*250*5mm
2556 462 2317 2379 2387 2387 2062
2379 2062
T.O.P. 2076 2076 2317 2069 2379 2387 2062
UB254*146*31 UB254*146*31 UB254*146*31 UB254*146*31 UB254*146*31 UB254*146*31 UB254*146*31 UB254*146*31 UB254*146*31 UB254*146*31 CAL ZIP SYSTEM RWI2 UB254*146*31 UB254*146*31
TUBE
1100
CAL ZIP SYSTEM RWI2 TUBE TUBE CAL ZIP SYSTEM RWI2
150*250*5mm 2453 2379
1:20 1:20 2387 2309 2309 2309 2.5
2453 2387
300
300
1877 2069 2453 2.5
1800
1877 1877 748 2076 150*250*5mm 150*250*5mm 2453 2.5 847 2379 771
300
2076 2069
+716.65 TUBE 2076 1:20 1:20 2069 809 2453 2453 2453 2453
2.5 CAL ZIP SYSTEM RWI2
300
300
300
300
300
2.5 2.5
300
150*250*5mm UB-610*229*101 UB-610*229*101
T.O.S.
300
300
300
300
300
UB-610*229*101 UB533*210*82
300
UB-610*229*101 UB-610*229*101 UB533*210*82
UB-610*229*101 UB457*191*74 DET.03
UB-610*229*101 UB-610*229*101 UB457*191*74 DET.28
UB457*191*74 UB457*191*74 DET.23
DET.03 DET.24 DET.35 (+715.50)
DET.23
(+715.50)
DET.27
Project Name / Logo:
2975
DET.33 DET.22 DET.22 DET.24 DET.36
.3*5 .3*5
4250
DET.34 *5 68 TOP OF S. BEAM TOP OF S. BEAM 8
DET.21 6 8.3 1 16
S1 HS S
5148
CH
CH
C UB457*191*67 UB457*191*67 CH
4860
S 16 *5
8.3
*5 S1 (+714.20)
CH TOP OF S. BEAM
TOP OF S. BEAM TOP OF S. BEAM
10320
*5 68
+712.49 CH 8.3
QC02001
S1 DET.47 .3*5
.3*5 .3*5 S1 .3*5 68 (+712.93) (+712.93) 16
68 68 68 68 .3*5 S
S1 POST COL. POST COL. S1 .3*5 S1
TOP OF BRACKET TOP OF BRACKET CH
T.O.S. CH UC-203*203*46 UC-203*203*46 CH CH
5370
5370
UB610*229*101 CH
.3*5 UB-610*305*238 UB-610*305*238 UB-610*305*238 S1 *5
68 DET.51 DET.51 8.3
S1 UC254*254*73 UC254*254*73 UC254*254*73 UC305*305*240 DET.53 UC305*305*97 UC305*305*97 68 16
CH .3*5 S
DET.52 CH
3660
CH
S 16
4800
UC305*305*97
Key Plan
4360
4360
UC254*254*107 8.3*
UC254*254*89
5
UC254*254*73 UC254*254*73 UC254*254*73
+708.83 CH
(+708.83) (+708.83)
UC305*305*240 N
.3*5 S1
T.O.B. CH
S1
68 68
.3*5
S.S.L S.S.L
(+708.83)
68
.3*5 02
S.S.L (+708.13)
S.S.L
(+708.13)
S.S.L
(+708.13)
S.S.L
CH
S 1 (+708.13)
S.S.L
01
09
2300
10 01
+706.53
B.O.F.
03
BO1
07
08
01 SECTION @ GRID-A (FROM-1 TO 13) 04
S-01A SCALE 1:100 05
1100
CAL ZIP SYSTEM RWI2 150*250*5mm 1:20 1:20 2387 2309 2062
150*250*5mm TUBE TUBE 2453 2379 2387 771 2309 2309 2.5
2453
300
300
2453 2.5
1800
300
150*250*5mm
+716.65 1877 1877 1877 2076 2076 2069 2069 809 2453 2453 2453 2453
2.5 CAL ZIP SYSTEM RWI2 2.5 4:- MINIMUM WELD THICKNESS OF FILLET WELDS = 5mm OR MINIMUM PLATE
300
300
300
2076
300
300
300
T.O.S. THICKNESS TO BE WELDED IN THE JOINT UNLESS SPECIFIED IN THE DRAWING'S.
300
300
300
300
300
300
4860
DET.37
4513
4160
3870
7:- THE CLASS OF BOLTS MUST BE ASTM A490M AND MUST BE HSFG PT.2 TYPE AND BE TESTED
FOR PRETENSION.
C COMPOSITE C
10320
+712.49 (+712.49) SLAB (140mm) (+712.49) (+712.93) 8:- THE HOLE TOLERANCE, FOR BOLTS SMALLER THAN M24 IS 2 MILLIMETER. FOR M24 BOLTS
8344
9508
TOP OF BEAM
T.O.S. TOP OF S. BEAM TOP OF S. BEAM AND BOLTS BIGGER THAN M24 ARE 3 MILLIMETER.
140
UB406*178*54
UB610*305*238 9:- GALVANIZED COATING FOR ALL BOLTS, FASTENERS AND NUTS MUST BE HOT-DIPPED.
TYPICAL UB610*229*101
UC203*203*71
UB406*178*54 UB-610*305*238 UB-610*305*238 UB-610*305*238
UB406*178*54 10:- AFTER WELDING, ALL THE WELDED SURFACES MUST BE CLEANED OF ANY RESIDUE AND PRIMED.
UC254*254*73 UC254*254*73
UC305*305*118 11:- ALL OF THE BOLTS IN MOMENT CONNECTIONS MUST BE PRE-TENSIONED %100. AND BOLTS
3660
3660
UC305*305*118
4360
4360
BIGGER THAN M24 ARE 3 MILLIMETER.
+708.83 (+708.83) (+708.83) (+708.83) 12:- ALL STRUCTURAL STEEL MEMBERS SHALL BE FIRE & CORROSION PROTECTED.
T.O.B. S.S.L S.S.L S.S.L
(+708.13) (+708.13) (+708.13) (+708.13)
S.S.L S.S.L S.S.L S.S.L
Rev.No. Description Date Checked
2300
6500 9000 9000 9000 6500 7000 7000 8300 8400 8300 7000 7000 6th Floor, Hamad Tower
King Fahd Branch Road
+718.45
T.O.P. 2076 2076
2556 462 2317 2317 2069 2379
2379 2379 462 2387 2387
2387 P O Box 301702
CAL ZIP SYSTEM RWI2 2379
TUBE CAL ZIP SYSTEM RWI2
2062 2062 Riyadh, 11372
1100
2453 2453 847 2379 1:20 150*250*5mm 1:20 2387 2309 2062
TUBE TUBE 2069 2453 2453 2453 2387 771 2309 2309 2.5
2076 2069 2453
300
300
2.5
Saudi Arabia
1800
300
1877 2076 150*250*5mm 2.5
+716.65 1877 748 TUBE
2.5 CAL ZIP SYSTEM RWI2
300
TUBE
300
300
300
300
300
150*250*5mm
T.O.S.
Copyright © Atkins Limited
300
300
300
300
300
300
CONTRACTOR:
4860
DET.05 DET.08
4160
DET.46
B B
10320
+712.49 COMPOSITE (+712.49) (+712.93) DET.49 (+712.93)
8344
9508
TOP OF BRACKET TOP OF BRACKET
T.O.S. SLAB (140mm) TOP OF S. BEAM
4800
4360
+708.83 (+708.83) (+708.83) (+708.83)
T.O.B. S.S.L S.S.L S.S.L
(+708.13) (+708.13) (+708.13) (+708.13)
S.S.L S.S.L S.S.L S.S.L
SUB CONTRACTOR:
2300
+706.53
B.O.F.
1 2 3 4 5 6 7 8 9 10 11 12 13
93000
Drawing Title: STRUCTURAL
6500 9000 9000 9000 6500 7000 7000 8300 8400 8300 7000 7000
+718.45 TUBE
150*250*5mm
AREA 02 - BACK OF HOUSE
462
1100
2453 2453 2453 847 2379 1:20 1:20 2387 2387 2309 2309 2062
TUBE TUBE 2069 2453 771 2309 2.5
SECTION@ GRID-A,B,C & D.
2076 2069 2453 2453
300
300
748 2.5
1800
300
1877
+716.65 1877 2076 1:20 1:20 TUBE
2.5 CAL ZIP SYSTEM RWI2
300
TUBE
300
300
2.5
300
300
2.5 150*250*5mm
300
150*250*5mm
T.O.S.
300
300
300
300
300
300
DET.31
UB610*229*101
DET.02 UB-610*305*149
DET.44 UB-610*305*149
DET.44 DET.40
UB-914*305*253
DET.01
DET.41
UB-914*305*253
UB-610*229*140 DET.42 DET.30
Reference File:
UB-914*305*253 DET.39 UB-914*305*253
4860
DET.38
QC02001-ATK-MOD-BIM-STR-02-B01-00001.rvt
4160
3870
COMPOSITE
10320
A +712.49 SLAB (140mm) (+712.93)
Authored By: A
8344
UB610*229*101
9508
TOP OF BEAM
T.O.S. (+712.49) (+712.63)
MEZZANINE LVL
140
TOP OF S. BEAM
UB610*305*238
TYPICAL UB610*229*101
UB610*229*125 UB610*229*125 UC254*254*73
UC254*254*89
Checked By:
3660
3660
4360
UC203*203*46
+708.83 (+708.83) (+708.83)
T.O.B. S.S.L S.S.L
(+708.13) (+708.13)
S.S.L S.S.L
+706.53
B.O.F.