Table 14.6: Minimum times for loosening or removing falsework and formwork
Soffits of slabs
4 days 4 days 10 days
(props left in)
Soffits of beams
7 days 7 days 14 days
(props left in)
Removal of falsework 14.36 (1) Formwork shall be removed without hammering or levering to the
and formwork concrete and in such a manner that there is no shock, disturbance, damage or
loading to the concrete. Side formwork shall be removed without
disturbing soffit formwork and soffit formwork shall be removed without
disturbing props except as provided for in Clause 14.36(2).
(3) Falsework and formwork for Class F5 finishes shall be loosened and
removed in a continuous operation and in accordance with a consistent
programme agreed by the Engineer. All formwork shall be loosened before
individual panels are removed and all formwork shall be removed within the
programmed period. Individual panels or make-up pieces shall not be left
in position.