NCU ZB Quick Setup Guide

Unpack the NCU unit, and check the accessories included within the cabinet
ANTENNA EXTENSION
CABLE

NCU BATTERY JUMPER


cabinet CABLE

ANTENNA FASTENING SET & DOOR KEY

Attach the NCU cabinet to a proper supporting structure, using the supplied Inspect the clean switches, and make sure all of them are “off”
fastening set (4x nylon plugs + screws) or equivalent of your own

Install the unit vertically,


with the membrane seals downwards,
1 and if placed outdoors, preferably with the front cover facing north 2

Install the antenna on a proper supporting structure, using fastenings of Take an ethernet cable* (UTP cat.5) from the local network of the site,
your own, then connect one end of the extension cable to the antenna, insert it through one of the small seals of the NCU cabinet, crimp an
and the other end to the NCU RJ45 terminal, and connect it to an available port of the switch

Install the antenna outdoors, vertically, about 2 meters above * Only required if the site will have
3 ground level, with direct line-of-sight (no obstacles) to the antennae of the closest TCUs 4 more than one NCU, or a permanent internet connection

D010-PD16003_revB Images for illustrative purpose only – refer to specific model datasheet for details © P4Q Electronics. All rights reserved.
NCU ZB Quick Setup Guide

Insert a grid power input cable through the big seal, then attach the L+N Apply power to the grid line, switch on the unit, and check the power
wires to the respective input terminals of the circuit breaker, and the PE wire indicator LEDs
to the yellow/green terminal nearby

100 – 240 Vac


47 – 63 Hz

5 6 1 or 2 pc
ConnectPort

Switch-off the NCU, take pictures of the S/N label (inside the Repeat this process
cabinet door) and MAC address (on top of metal box), and send for the remaining
them to your Suntrack contact NCUs on the site, and
then proceed to the
setup of the RSUs
and TCUs, following
their respective
guides

7 9

Finally, in a remote support session, qualified Suntrack personnel will guide you
through the remaining steps of the commissioning process - and when required,
among other operations, you will be asked to connect the battery jumper cable

For further information, please refer to:


• “NCU Installation and Operation Manual”
• “Commissioning Process Overview”

For documents and software , visit tools.suntrack.es


10
For technical support, contact support@suntrack.es
Images for illustrative purpose only – refer to specific model datasheet for details

You might also like