You are on page 1of 1

NOTE

ALL DIMENSION IN METERS


DRAWINGS ARE NOT TO BE SCALED
ALL LEVELS ARE METERS

CUTTING

FILLING

70 70 69 69

69 69 68 68 PROJECT TITLE

68 68 67 67 EXTENSIVE SURVEY PROJECT - 2023


VI SEMESTER B.E
67 67 66 66 (CIVIL ENGINEERING.)
66 66 65 65 LOCATION
KAYAR PADAV, BONDANTHILA,
65 65 64 64
VAMANJOOR
DATUM(M) 64 64 DATUM(M) 63 63
9 6 3 0 3 6 9 9 6 3 0 3 6 9
CHAINAGE CHAINAGE

65.094 66.495
65.904 68.915

65.094 66.495

65.094 66.495
65.904 68.915

65.180 66.325

65.094 66.145

65.094 66.145
65.904 68.915

65.094 66.145
65.140 68.99

65.140 68.99
65.99 68.12

65.904 68.93
REDUCED LEVEL REDUCED LEVEL

FORMATION LEVEL FORMATION LEVEL

AREA OF FILLING 0.00 AREA OF FILLING 0.00

AREA OF CUTTING 59.683 AREA OF CUTTING 29.513

CHAINAGE 970.00 CHAINAGE 980.00

66 66 66 66
DEPARTMENT OF CIVIL
ENGINEERING
65 65 65 65
ST. JOSEPH ENGINEERING COLLEGE
64 64 64 64
VAMANJOOR MANGALORE -575028
KARNATAKA
63 63 63 63

62 62 62 62

61 61 61 61

DATUM(M) 60 60 DATUM(M) 60 60
9 6 3 0 3 6 9 9 6 3 0 3 6 9
CHAINAGE CHAINAGE DRAWING TITLE
CROSS SECTION OF
64.284 65.130

63.520 65.105
64.284 65.130

63.520 65.105
64.284 65.130

64.370 65.535

64.284 65.345

62.720 63.085

62.720 63.085
63.2

63.2

63.2

63.484 63.34
REDUCED LEVEL REDUCED LEVEL

63.570 64.2
HIGHWAY

63.484
63.484

63.484
FORMATION LEVEL FORMATION LEVEL

0.00 AREA OF FILLING 0.498


AREA OF FILLING

PROJECT NAME :WATER SUPPLY


24.388 AREA OF CUTTING 5.776
AREA OF CUTTING
CAMP OFFICER :Ms. PRANAMYA
Mr. CHITHARANJAN B
HEAD OF DEPT : Dr.YAJNHESWARAN B
CHAINAGE 990.00 CHAINAGE 1000.00 PROJECT INCHARGE:
MS VISHIKHA KESHAVA
BATCH NO : 04
DATE :
CHECK / APPROVED :

DRAWING NO :

REVISION NO PAGE NO

You might also like