Professional Documents
Culture Documents
Technical Design
Table of Contents
REVISION HISTORY................................................................................................................................................3 1.0 PROJECT DESCRIPTION...................................................................................................................................3 1.1 ASSUMPTIONS.........................................................................................................................................................3 1.2 KNOWN ISSUES.......................................................................................................................................................3 1.3 SYSTEMS / APPLICATIONS AFFECTED.........................................................................................................................4 2.0 SYSTEM INTERFACE FLOWS..........................................................................................................................4 2.1 CURRENT FLOW......................................................................................................................................................4 2.2 PROPOSED FLOW.....................................................................................................................................................4 3.0 REQUIREMENT MATRIX - (OPTIONAL).....................................................................................................5 4.0 TECHNICAL DESIGN..........................................................................................................................................5 4.1 APPLICATION / SYSTEM TECHNICAL DESIGN...............................................................................................................5
4.1.1 Batch Job Stream / Program Modifications.................................................................................6 4.1.2 Online / Screen Modifications.....................................................................................................6 4.1.3 One Time Modifications.............................................................................................................7 4.1.4 CIM Modifications......................................................................................................................7 4.1.5 Reporting Modifications.............................................................................................................7
5.0 INTERFACE MODIFICATION IMPACTS.......................................................................................................7 6.0 NEW HARDWARE REQUIREMENTS..............................................................................................................8 7.0 SECURITY / LEGAL / COMPLIANCE CONSIDERATIONS.........................................................................8 8.0 TESTING STRATEGY..........................................................................................................................................8 ACRONYMS...............................................................................................................................................................9 GLOSSARY..................................................................................................................................................................9 REFERENCES.............................................................................................................................................................9 APPENDIX A:............................................................................................................................................................10 APPROVAL SIGNATURES....................................................................................................................................11
Page 2 of 11
68415375.doc 9/18/2011
Technical Design
Revision History
Version Version Date Author Comments
1.1 Assumptions
<List known internal or external activities identified while defining the technical design that must remain true. When activities do not remain true, impact to the design is possible. Assumptions can be listed as bullet points. >
Issue ID
Owner
Issue Description
Figure 1:
Issues Table
Page 3 of 11
68415375.doc 9/18/2011
Technical Design
System / Application ID
Description
Figure 2:
Page 4 of 11
68415375.doc 9/18/2011
Technical Design
Technical Element ID
Functional Element ID
Figure 3:
Matrix Table
Technical Design
Explain and diagram the logical layout of the application system. Is this system/application distributed? Which pieces are: in the TZ? Wachovia Intranet? Located or belong to a third party? What kind of language will be used? (Cobol, ASM, Easytrieve, APS, C, SAS, REXX, etc) Will the database be primarily transactional (add/change/delete records) or analytical (queries)? Where is data sourced? Are there any directories that are involved in mail routing or mail systems affected by this application? If yes, specify. Is the system hosted on a Citrix Server? Is 128-bit encryption exportable to the country in which users will initiate a remote access session? What Citrix applications are required? (Example: Notes, Sametime, PICCT, etc) Will there be multiple Citrix Applications? Will applications be used by all users (provide spreadsheet of Citrix applications/user groups)? Are there remote access points besides Citrix that are available? Why was Citrix chosen? Describe the licensing model/requirements for each application. For each required Citrix Application provide the following: Expected total Citrix application users given access to the system, Expected number of Citrix application users concurrently accessing the system, Citrix storage requirements for the applications. What fail over/load balancing systems are in place? How many managed resource connections (database message queue, etc) should normally be used? How big are the resource pools? Will this project utilize any technologies not currently used within Wachovia? If yes, specify. If Batch Processing is required: What are the jobs that begin streams? What are the jobs with Service Level Agreements? What are the jobs that End Update Streams? What are the jobs that End Report Streams? What are the key milestone jobs? >
Page 6 of 11
68415375.doc 9/18/2011
Technical Design
changes or a description of the design change required. The screen change (layout) can be presented in an appendix to this document. >
Page 7 of 11
68415375.doc 9/18/2011
Technical Design
Are there any third party vendor dependencies providing business services? (Example: Beta, etc) If yes, specify. Will this system/application reside in the Wachovia Transition Zone (TZ)? What other system or application dependencies will this system/application have? Will data be used by other applications? If yes, specify. Document the system/application's upstream and downstream dependencies and add to the Configuration Management Database (CMDB) (i.e. PICCT Inventory)? Are upstream/downstream application Recovery Time Objectives (RTO) equal to or less than the process RTO's? Will a data transmission be needed for this process? Is the transmission external (to or from an outside organization) or internal (application to application)? Will any dedicated network connectivity be needed to perform the data transmissions? What is the largest and smallest file size that will need to be transmitted? What are the TCP port requirements? (Technical Requirement)>
Page 8 of 11
68415375.doc 9/18/2011
Technical Design
Acronyms
Acronym Description
Glossary
Word / Term Description
References
Document Title Document Source
Page 9 of 11
68415375.doc 9/18/2011
Technical Design
Appendix A:
Page 10 of 11
68415375.doc 9/18/2011
Technical Design
Approval Signatures
My signature below indicates that I have reviewed this document and agree that it details the requirements that I have for the initiative.
_______________________________ Name
_________________________________ Role
_______________ Date
_______________________________ Name
_________________________________ Role
_______________ Date
_______________________________ Name
_________________________________ Role
_______________ Date
_______________________________ Name
_________________________________ Role
_______________ Date
_______________________________ Name
_________________________________ Role
_______________ Date
_______________________________ Name
_________________________________ Role
_______________ Date
Page 11 of 11
68415375.doc 9/18/2011