Professional Documents
Culture Documents
Complex Loop Description Common Ms Block (Unit 505) : Algiers Refinery Rehabilitation and Adaptation Project
Complex Loop Description Common Ms Block (Unit 505) : Algiers Refinery Rehabilitation and Adaptation Project
Document Class : CLASS 1 Project N° - Unit Doc Type Material Code Serial Number Rev. Page
G PATHAK A YADAV
N AGRAWAL
2012.03.22 18:01:09 2012.03.22 2012.03.26 12:16:03
+05'30' 18:01:33 +05'30'
+05'30'
DOCUMENT REVISIONS
Sections changed in last revision are identified by a vertical line in the margin
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
COMPLEX LOOP DESCRIPTION
COMMON MS BLOCK (Unit 505)
Document Class : CLASS 1 Project N° - Unit Doc Type Material Code Serial Number Rev. Page
CONTENTS
2. CONTROL PHILOSOPHY................................................................................................................................................ 3
2.1 GENERAL CONTROL DESCRIPTION ..................................................................................................................... 3
3. DESCRIPTION OF COMPLEX LOOPS......................................................................................................................... 3
3.1 STEAM GENERATION CIRCULATING WATER PUMPS CONTROL (505-UC-0001) ........................................ 3
3.2 PURE STEAM CONDENSATE TRANSFER PUMPS CONTROL (505-UC-0005) .................................................. 4
3.3 SUSPECT CONDENSATE TRANSFER PUMPS CONTROL (505-UC-0006) ......................................................... 4
3.4 CB DRUM PUMP CONTROL (505-UC-0003) ........................................................................................................... 4
3.5 FLARE KNOCKOUT DRUM PUMPS CONTROL (505-UC-0004) .......................................................................... 5
3.6 PURE CONDENSATE DRUM (505-D-002) PRESSURE CONTROL....................................................................... 5
3.7 FLASH STEAM CONDENSER (505-EA-001)HIGH VIBRATION TRIP (505-UC-0002 A/B) ................................ 6
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
COMPLEX LOOP DESCRIPTION
COMMON MS BLOCK (Unit 505)
Document Class : CLASS 1 Project N° - Unit Doc Type Material Code Serial Number Rev. Page
1. UNIT OBJECTIVE
The objective of the Common MS Block is to develop the Process area battery limit, Steam
generation system, utilities network, as well as the flare and closed drain distribution linked to
Naphtha Hydrotreating Unit (NHT-U500),Light Naphtha Isomerization Unit (ISOM-U510) &
Continuous Catalytic Regeneration Unit (CCR-U520) units.
Common MS Block is divided into different sections:
Process area Battery limit.
Steam generation system
Flare system as well as Flare knock out drum
Close blow down system as well as CB Drum.
Utilities:
- Cooling water distribution network
- Steam and condensate distribution as well as Pure condensate & Suspect condensate
recovery system and Steam drum blow down system.
-Air distribution (Plant Air and Instrument air)
-Miscellaneous distribution (Service water, Potable water, Fuel gas, Fuel oil, Flushing oil
and Nitrogen)
2. CONTROL PHILOSOPHY
Control operations of Common MS Block are handled by the DCS system. This system is an interface
between the operator and the plant. The DCS can be used by operator to manually control valve
opening but it can also function as a controller to ensure that process parameters (such as pressure,
temperature or flow) are maintained automatically at their desired value. These control loops have
been indicated on the P&ID’s. Most control loops are quite basic: an instrument transmitter gives off a
signal to the DCS where it is used in as controller block. The controller then gives an output signal to
another controller block or to a control valve. Some control loops are more complex with multiple
controllers description of these complex loops. This document does not constitute a through
description of DCS and related controller blocks functioning.
3.1.1 OBJECTIVE
The objective of this control loop is to maintain the flow of steam generation circulating water
through 520-F-001/002/003/004 heaters.
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
COMPLEX LOOP DESCRIPTION
COMMON MS BLOCK (Unit 505)
Document Class : CLASS 1 Project N° - Unit Doc Type Material Code Serial Number Rev. Page
3.2.1 OBJECTIVE
The objective of this control loop is to protect dry run of Pure steam condensate transfer pump
(505-P-001 A/ B) in case of low level in the Pure condensate drum 505-D-002.
3.3.1 OBJECTIVE
The objective of this control loop is to protect dry run of Suspect condensate transfer pump
selected (505-P-002 A/ B) in case of low level in the Suspect condensate drum 505-D-004.
3.4.1 OBJECTIVE
The objective of this control loop is to control the level in the CB drum 505-D-009.
ALGIERS REFINERY
REHABILITATION AND ADAPTATION PROJECT
COMPLEX LOOP DESCRIPTION
COMMON MS BLOCK (Unit 505)
Document Class : CLASS 1 Project N° - Unit Doc Type Material Code Serial Number Rev. Page
3.5.1 OBJECTIVE
The objective of this control loop is to control the level in the Flare knockout drum 505-D-012.
3.6.1 OBJECTIVE
The objective of this control loop is to control the pressure of the Pure condensate drum (505-D-
002).
Document Class : CLASS 1 Project N° - Unit Doc Type Material Code Serial Number Rev. Page
Valve
opening
100 %
OPEN
505-PV-0020A 505-PV-0020B
0%
CLOSED
4 12 20 (mA)
3.7.1 Objective
The objective of this loop is to stop the Fan Motor in case of High Vibration. One Vibration Switch is
provided for each Fan driver of Flash Steam Condenser.
Process P&ID:
9952T-505-PID-0031-7101
In case of high vibration of Fan, 505-UC-0002 A/B will stop the Fan motor 505-EAM-001 A/B
respectively.