N Activity Desc Desc Tools
searching the equipment
move green tyre
push down green tyre from curing machine
move green tyre
up the press mould
move trolley
searching the equipment
uninstall the bladder
Uninstall Mold
searching the forklift
release the bladder
hook the blader with eyebolt
move the blader from curing machine
hook the blader with eyebolt
move the blader from curing machine
down the press mould
release the upper mould
move the equipment and klem ring
up the press mould
install the eyebolt mould
move mould into mould's pallet
release the eyebolt mould from mould
arrange the equipment
move mould into mc sandblasting area
hook the eyebolt to mould
move the upper mould to mould table
hook the eyebolt to buttom mould
move the buttom mould into the sandblast machine
release the eyebolt from mould
setup the sandblasting machine
starting the sandblasting mould cleaning (buttom)
cleaning and repair(weekly broken) the buttom mould
hook the eyebolt to buttom mould
move the buttom mould to the mould table
C Sandblast
Install Mold
pull up the press mould
take the bladder from the bladder area
move the bladder into the curing machine
move away the forklift from the curing machine
prepare the equipment and release eyebolt
install the bladder
use the impact drill to install buttom mould
setup the blader
cleaning mould with high pressure air
setup the curing machine
Ext/Int Operator Mulai Sekesai Duration Minute
0:00 0:01:37 0:01:37 1.62
0:01:37 0:01:58 0:00:21 0.35
0:01:58 0:02:14 0:00:16 0.27
0:02:14 0:02:31 0:00:17 0.28
0:02:31 0:03:00 0:00:29 0.48
0:03:00 0:04:00 0:01:00 1.00
0:04 0:04:34 0:00:34 0.57
0:04:34 0:06:49 0:02:15 2.25
12:06:49 AM 0:15:09 0:08:20 8.33
12:15:09 AM 0:17:32 0:02:23 2.38
12:17:32 AM 0:18:24 0:00:52 0.87
12:18:24 AM 0:19:54 0:01:30 1.50
12:19:54 AM 0:20:28 0:00:34 0.57
12:20:28 AM 0:24:01 0:03:33 3.55
12:24:01 AM 0:24:30 0:00:29 0.48
12:24:30 AM 0:25:30 0:01:00 1.00
12:25:30 AM 0:25:54 0:00:24 0.40
12:25:54 AM 0:26:16 0:00:22 0.37
12:26:16 AM 0:26:27 0:00:11 0.18
12:26:27 AM 0:31:08 0:04:41 4.68
12:31:08 AM 0:31:25 0:00:17 0.28
12:31:25 AM 0:31:48 0:00:23 0.38
12:31:48 AM
12:00:00 AM 0:00:09 0:00:09 0.15
12:00:09 AM 0:00:51 0:00:42 0.70
12:00:51 AM 0:01:41 0:00:50 0.83
12:01:41 AM 0:03:09 0:01:28 1.47
12:03:09 AM 0:03:26 0:00:17 0.28
12:03:26 AM 0:05:07 0:01:41 1.68
12:05:07 AM 0:09:53 0:04:46 4.77
12:09:53 AM 0:14:14 0:04:21 4.35
12:14:14 AM 0:14:30 0:00:16 0.27
12:14:30 AM 0:16:15 0:01:45 1.75
12:16:15 AM 0:17:10 0:00:55 0.92
12:17:10 AM 0:18:47 0:01:37 1.62
12:18:47 AM 0:19:00 0:00:13 0.22
12:19:00 AM 0:22:25 0:03:25 3.42
12:22:25 AM 0:23:01 0:00:36 0.60
12:23:01 AM 0:23:27 0:00:26 0.43
12:23:27 AM 0:25:32 0:02:05 2.08
12:25:32 AM 0:26:37 0:01:05 1.08
12:26:37 AM 0:27:50 0:01:13 1.22
12:27:50 AM 0:30:10 0:02:20 2.33
12:30:10 AM 0:31:50 0:01:40 1.67
12:31:50 AM 0:32:02 0:00:12 0.20
12:32:02 AM 0:34:16 0:02:14 2.23
12:34:16 AM 0:34:39 0:00:23 0.38
12:34:39 AM
12:00:00 AM 0:00:42 0:00:42 0.70
12:00:42 AM 0:02:00 0:01:18 1.30
12:02:00 AM 0:02:20 0:00:20 0.33
12:02:20 AM 0:02:49 0:00:29 0.48
12:02:49 AM 0:04:13 0:01:24 1.40
12:04:13 AM 0:04:35 0:00:22 0.37
12:04:35 AM 0:04:57 0:00:22 0.37
12:04:57 AM 0:07:13 0:02:16 2.27
12:07:13 AM 0:08:20 0:01:07 1.12
12:08:20 AM 0:08:38 0:00:18 0.30
12:08:38 AM 0:09:03 0:00:25 0.42
12:09:03 AM 0:10:14 0:01:11 1.18
12:10:14 AM 0:10:38 0:00:24 0.40
12:10:38 AM 0:12:03 0:01:25 1.42
12:12:03 AM 0:12:52 0:00:49 0.82
12:12:52 AM 0:14:46 0:01:54 1.90
N Activity Desc Tools Ext/Int Operator
1 MC Dry Ice
2 MC Dry Ice
3 MC Dry Ice
4 MC Dry Ice
5 MC Dry Ice
6 MC Dry Ice
7 MC Dry Ice
8 MC Dry Ice
9 MC Dry Ice
10 MC Dry Ice
11 MC Dry Ice
12 MC Dry Ice
13 MC Dry Ice
14 MC Dry Ice
15 MC Dry Ice
16 MC Dry Ice
17 MC Dry Ice
18 MC Dry Ice
19 MC Dry Ice
20 MC Dry Ice
21 MC Dry Ice
22 MC Dry Ice
23 MC Dry Ice
24 MC Dry Ice
25 MC Dry Ice
Total
Activity
Description
x 0.18 6
x 0.82 8
6.28
0.72
0.33
x 0.72 8
1.35
1.23
0.73
0.65
0.13
0.77
0.08
4.28
0.50
3.58
0.47
3.50
0.23
1.52
1.73
0.32
2.53
4.08
x 0.18
36.93
Ext Int NVA VA E C R S
x x
x x x
x x x
x x
x x
x x
x x
x x
x x x
x x
x x
x x x
x x
x x
x x x
x x
x x x
x x
x x x
x x
x x
x x
x x
x x x
x x
Action
0.18
0.00
0.5
0.72
0.33
0.72
1.35
1.23
0.20
0.65
0.13
0.23
0.08
4.28
0.23
3.58
0.23
3.50
0.23
1.52
1.73
0.32
2.53
3.00
0.18
27.67
No Description
2 move the trolley of green tyre
12
15
filling dry ice machine
17
19
No Action
New Toolbox
Status
No Macro Activity Description Time Ext Int
X
X
X
X x
X
X
X x
X
X
X
X x
X x
X
X
X X
X X
X X
X x
X
X
X
X
X
X
X X
X
X
X x
Action
Bring the new blader with bladder pallet in one time transport
Carry out activities in accordance with work instructions and train the operator
Carry out activities in accordance with work instructions and train the operator
Carry out activities in accordance with work instructions and train the operator
Provide a place for equipment as needed
Carry out activities in accordance with work instructions and train the operator
0.80
1.17
0.28
2.18
4.35
0.87
1.57
1.47
0.35
0.15
0.10
0.50
1.23
1.00
0.00
0.00
0.83
0.00
1.63
2.82
0.25
0.18
0.58
1.15
0.00
1.87
3.07
0.00
17.2 No Description
7 move blader to curing area
11 Installation eye bolt and link to hook in lifter
12 Move bladder with forklift
15 entry to mould area
16 set the left one blader
17 check the left one blader
18 change oring
25 Check baut/mur at unloader dan turn on mesin
28 Move bladder to prep. Table
No Action
28
No Activity
2 Uninstall bladder
18 change oring
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
No Macro Activity
24 MC Sandblast
25 MC Sandblast
26 MC Sandblast
27 MC Sandblast
28 MC Sandblast
29 MC Sandblast
30 MC Sandblast
31 MC Sandblast
32 MC Sandblast
33 MC Sandblast
34 MC Sandblast
35 MC Sandblast
36 MC Sandblast
37 MC Sandblast
38 MC Sandblast
39 MC Sandblast
40 MC Sandblast
41 MC Sandblast
42 MC Sandblast
43 MC Sandblast
44 MC Sandblast
45 MC Sandblast
46 MC Sandblast
47 MC Sandblast
48 MC Sandblast
49 Install Mold
50 Install Mold
51 Install Mold
52 Install Mold
53 Install Mold
54 Install Mold
55 Install Mold
56 Install Mold
57 Install Mold
58 Install Mold
59 Install Mold
60 Install Mold
61 Install Mold
62 Install Mold
63 Install Mold
64 Install Mold
Total
Activity
Description
NVA VA
Jumlah 8 56
With
Walking
Forklift
0.15 x
0.70 2 x
0.83 x
1.47 1.5 x
0.28 x
1.68 x x
4.77 x
4.35 x
0.27 x
1.75 3 x
0.92 x
1.62 3 x
0.22 x
3.42 x
0.60 x
0.43 x
2.08 3 x
1.08 x
1.22 3 x
2.33 x
1.67 3 x
0.20 x
2.23 3 x
0.38 x
2.00 15 x
0.70 10 x
1.30 x
0.33 4 x
0.48 x
1.40 x
0.37 x
0.37 x
2.27 x
1.12 15 x
0.30 4 x
0.42 x
1.18 x
0.40 x
1.42 x
0.82 x
1.90 x
85.2 195.5 0 64 8
Total
64
85.22
Total
195.5
31.7
6.17
VA E C R S
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x x
x x
x
x
x x
x
x
x x
x
56 8 4 5 1
Action
This Activity should be carry out by operator 2 when the sandblast machine is delay
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
Prepare and bring all equipment near arround the curing machine
0.15
0.70
0.83
1.47
0.28
0
4.77
4.35
0.27
1.75
0.92
1.62
0.22
3.42
0.60
0.43
2.08
1.08
1.22
2.33
1.67
0.20
2.23
0.38
2.00
0.70
1.30
0.33
0.48
1.40
0.37
0.37
0.00
0.00
0.30
0.42
0.35
0.40
1.42
0.2
1.90
61.8
No
12
14
17
21
23
29
56
57
60
63
No
12
14
56
57
No
7
17
60
63
Description
Action
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
Action
Provide toolboxe according to work needs closer the curing machine, for mold cleaning activities wi
method the tools needed are as follows;
- Hammer
- Pahat
- Impact drill
- L key
Provide toolboxe according to work needs closer the curing machine, for mold cleaning activities wi
method the tools needed are as follows;
- Hammer
- Pahat
- Impact drill
- L key
- Cleaning Liquid
Action
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
this activity can be carry out at the same time before move the mold to mold pallete
prepare the forklift pallete
This Activity should be carry out by operator 2 when the sandblast machine is delay
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
Prepare and bring all equipment near arround the curing machine
New Toolbox
Status
No Description NVA VA Eliminate
x
Action
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
this activity can be carry out at the same time before move the mold to mold pallete
This Activity should be carry out by operator 2 when the sandblast machine is delay
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
Prepare and bring all equipment near arround the curing machine
No
1
2
3
4
6
7
9
11
12
13
14
17
21
23
29
56
57
60
63
No
12
14
56
57
No
1
17
60
63
No
11
13
No
16
61
Description
searching the equipment
move green tyre
push down green tyre from curing machine
move green tyre
move trolley and equipment
searching the equipment
waiting searching the forklift
hook the blader with eyebolt
move the blader from curing machine
hook the blader with eyebolt
move the blader from curing machine
move the equipment and klem ring
release the eyebolt mould from mould
move mould into mc sandblasting area
setup the sandblasting machine
take the bladder from the bladder area
move the bladder into the curing machine
install the bladder
cleaning mould with high pressure air
Action
Place the bladder around the curing machine in a bladder pallet which
for 2 bladders
Action
Provide toolboxe according to work needs closer the curing machine, f
cleaning activities with the sandblast method the tools needed are as fo
- Hammer
- Pahat
- Impact drill
- L key
- Cleaning Liquid
Action
Action
Uninstall Mold
Install Mold
Action
Prepare all equipment before start uninstalling bladder
Can be carry out by operator production
Can be carry out by operator production
Can be carry out by operator production
the activity can be carry out after move trolley
Prepare all equipment before start uninstalling bladder
The forklift should be available anytime
Use threaded lifting pins
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
Use threaded lifting pins
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
operator can bring a pallete to bring more equipment
this activity can be carry out at the same time before move the mold to mold pallete
prepare the forklift pallete
This Activity should be carry out by operator 2 when the sandblast machine is delay
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
Place the bladder around the curing machine in a bladder pallet which is sufficient for 2 bladders
Prepare and bring all equipment near arround the curing machine
liquid cleaning should be available before instalation
New Toolbox
A New Threaded Lifting Pins
From-To From
A-B A
B-C B
C-B C
B-A B
From-To From
A-B A
B-A B
B-C B
C-B C
From-To From
A-B A
B-A B
B-C B
C-B C
Total
PARETO CHART DISTAN
(DRY ICE)
TO 90 81.5 81.5
A B C D E 80
81.5 70
60
34.4 34.4 163 50 70%
40 34
#REF!
30 35%
#REF! 20
#REF! 10
0
Frequence x Distance A-B B-A B-
% 40%
20% B
0%
B-A B-C C-B
Code Description
A Dry Ice Storage
B Curing Machine
C Power Supply
Description
Walking
A
C
TO
A B C D E F
A 3 4 1 1
B 2 1
C 1
FROM
D 4
E 1
F 1
Frequence
TO
A B C D E F
A 81.5 81.5 81.5 81.5
B 81.5 105
C 81.5
FROM
D 81.5
E 81.5
F 81.5
Distance
Sequence
1
2
3
4
5
6
7
8
9
10
TO
A B C D E
A 244.5 326 81.5
B 163 105
C 81.5
FROM
D 326
E 81.5
F 81.5
Frequence x Distance
Activity Distance
A (Bladder Change) 110
B (Cleaning Mold Dry Ice) 150
C (Cleaning Mold Sand Blast) 375
From/to From To Freq Distance Total
A-B A B 4 81.5 326.0 38% 38%
B-A B A 4 81.5 326.0 38% 76%
A-C A C 1 105 105.0 12% 88%
C-A C A 1 105 105.0 12% 100%
Total 373 862.0 100%
Forklift #REF!
Walking #REF!
PARETO CHART DISTANCE TRAVEL
(SANDBLAST)
350.0 326.0 326.0 120%
300.0 100% 100%
F 250.0 88%
80%
81.5 200.0
76%
60%
150.0
105.0 105.0 40%
100.0 38%
50.0 20%
0.0 0%
A-B B-A A-C C-A
Code Description
A Preparation Tabel
B Curing Machine
C Sandblast Area
120%
0% 100%
80% B
60%
40%
20%
0%
Code Description
A Dry Ice Storage
B Curing Machine
C Power Supply
DISTANCE (m)
TO
A B C
A 51 30 FREKUENSI X DISTANCE
FROM B TO
C A B
A 204
FREKUENSI FROM B
TO C
A B C
A 4 2
FROM B
C
STANCE
TO
C
60
Description
With Forklift
PARETO CHART DISTANCE TRAVEL
(CHANGE BLADDER)
180 120%
160
100%
140
120 80%
100
60%
80
60 40%
40
20%
20
0 0%
A-B B-A
A
A
Code Description
A Preparation Tabel
B Curing Machine
Distance (meter)
From/To A1 A2 A3 A4 A5 A6 A7 A8
Z (Prep Table) 138.7 134.5 130.3 126.1 121.9 116.3 112.1 107.9
From/To B1 B2 B3 B4 B5 B6 B7 B8
Z(Prep Table) 121.1 116.9 112.7 108.5 104.3 98.7 94.5 90.3
From/To C1 C2 C3 C4 C5 C6 C7 C8
Z (Prep Table) 112.5 108.3 104.1 99.9 95.7 90.1 85.9 81.7
From/To D1 D2 D3 D4 D5 D6 D7 D8
Z(Prep Table) 94 89.8 85.6 81.4 77.2 71.6 67.4 63.2
From/To E1 E2 E3 E4 E5 E6 E7 E8
Z (Prep Table) 92.3 88.1 83.9 79.7 75.5 69.9 65.7 61.5
From/To F1 F2 F3 F4 F5 F6 F7 F8
Z(Prep Table) 107.5 103.3 99.1 94.9 90.7 85.1 80.9 76.7
Total (m)
Total Machine
Average Distance/machine
From To Distance(m)
Power Supply 15 5
Power Supply 14 9.2
Power Supply 13 13.4
Power Supply 12 17.6
Power Supply 11 21.8
Power Supply 10 26
Power Supply 9 30.2
Power Supply 8 34.4
Power Supply 7 38.6
Power Supply 6 42.8
Power Supply 5 47
Power Supply 4 51.2
Power Supply 3 55.4
Power Supply 2 59.6
Power Supply 1 63.8
34.4
eter) Total (m)
A9 A10 A11 A12 A13 A14 A15
103.7 99.5 95.3 91.1 86.9 82.7 78.5 1625.5
B9 B10 B11 B12 B13 B14 B15
86.1 81.9 77.7 73.5 69.3 65.1 60.9 1361.5
C9 C10 C11 C12 C13 C14
77.5 73.3 69.1 64.9 60.7 56.5 1180.2
D9 D10 D11 D12 D13 D14
59 54.8 50.6 46.4 42.2 38 921.2
E9 E10 E11 E12 E13 E14 E15
57.3 53.1 48.9 44.7 40.5 36.3 32.1 929.5
F9 F10 F11 F12 F13 F14 F15
72.5 68.3 64.1 59.9 55.7 51.5 47.3 1157.5
) 7175.4
ine 88
/machine 81.538636
B15 A15
18 18 Sandblast 105.43864
5.6 5.6
29.7 48
7.6 6.9