MINISTRY OF ROAD TRANSPORT & HIGHWAYS
SPECIFICATIONS FOR ROAD AND BRIDGE WORKS
(Fifth Revision)
Published By the Indian Roads Congress,
on Behalf of the Govt. of India,
Ministry of Road Transport & Highways
Copies can be had from Indian Roads Congress,
Jamnagar House, Shahjahan Road, New Dethi &
Sector 6, R.K. Puram, Kama Koti Marg, New Delhi
Prive Rs. 3,000/-
Plus packing & postage chargesFirst Published
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
‘Second Revision
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Third Revision
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Fourth Revision
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Reprinted
Fifth Revision
April, 1973
November, 1975
May, 1978
September, 1981
October, 1983
April, 1986
February, 1988
‘August, 1988
April, 1990
June, 1992
February, 1993
July, 1993,
Apri, 1995
January, 1997 (Incorporates Corrigendum No.1 & 2 and
Col. 12 & 15. 662)
January, 1998
January, 1998
May, 1999
February, 2000
‘September, 2000 (Section 700 “Geosynthetics’ Changed to
“Geosynthetics and Reinforced Earth’)
August, 2004
January, 2002
March, 2002
September 2002
November, 2002
March, 2003
June, 2003
July, 2003
December, 2003
May, 2004
September, 2004
April, 2005
October, 2005
March, 2006
September, 2006
March, 2007
‘August, 2007
February, 2008
‘August, 2008
November, 2008
March, 2009
June, 2009
December. 2009
March, 2010
July, 2010
April, 2013,
(Rights of publication and Translation are reserved)
Printed at: India Offset Press, A-1 Mayapuri Ind, Area Phase-1 New Delhi-11064
(1000 copies)PREFACE TO THE FIFTH REVISION
This edition of the Specifications for Road and Bridge Works marks the Fifth Revision. In
the last decade and a half, significant developments have taken place in the highways
sector. The massive National Highways Development Projects (NHDP) undertaken by the
Government of India is in progress involving execution of a large number of high value road
projects. These require adoption of latest international practices so as to achieve technical
execelience and the best quality. Concrete bridges have also undergone major changes with
deveopment of new structural forms, new methods of computer based analysis and design
and development of high strength materials, IRC:112 for concrete bridges based on the limit
state method has come into force. Over the past few years, many IRC codes have also been
completely revised necessitating extensive changes in the Ministry's specifications for road
and bridge works
‘Some of the important additions in this revision of Specifications for Road and Bridge Works
cover stone mastic asphalt, microsurfacing, sand asphalt base course, prefabricated vertical
drains (PVD), natural geo textiles, geo cells for use in base and sub base in pavement
and slope protection, variable message sign boards, soil nailing, cold applied retro-reflective
paints, audible and vibratory pavement markings, solar powered road markers, traffic
control & safety devices in construction zone, traffic impact attenuators and advance traffic
management system. Some of the new areas covered in bridges include high performance
concrete, HDPE sheathings, Pot-PTFE bearings, jack down method of well sinking, dynamic
testing of piles and mechanically woven wire crates for gabions
The Fifth Revision of the Specifications for Road and Bridge Works is the result of the
concerted efforts of the officers of the Roads Wing and other professionals who contributed
to the drafting of this document. | wish to express my gratitude to all of them and the Indian
Roads Congress for undertaking the assignment of bringing out this publication.
Feedback and suggestion for further improvement would be welcome from users of this
edition
Cee
(C. Kandasamy)
DG(RD) & SS
03-01-2013CONTENTS.
Section No. Section Title/Clause No. Page No.
100 GENERAL
101 Introduction 1
102 Definitions 1
103 Materials and Test Standards 5
104 Sieve Designations 5
105 Scope of Work 6
106 Construction Equipment 10
107 Drawings 1
108 Site Information "
109 Setting Out "
110 Public Utilities 8
114 Precautions for Safeguarding the Environment 15
112 Arrangement for Traffic During Construction 19
113 General Rules for the Measurement of Works for
Payment 22
114 Scope of Rates for Different tems of Work 24
115 Methodology and Sequence of Work 26
116 Crushed Stone Aggregates 28
117 Supply of Quarry Samples 28
18 Approval of Materials 28
119 Use of Surfaces by Traffic 28
120 Field Laboratory 29
121 Supply of Project Record 33
200 SITE CLEARANCE
201 Clearing and Grubbing 37
202 Dismantling Culverts, Bridges and Other Structures/
Pavements 39
300 EARTHWORK, EROSION CONTROL AND DRAINAGE
301 Excavation for Roadway and Drains 45
302 Blasting Operations 53
303 Presplitting Rock Excavation Slopes 56400
500
Contents
304 Excavation for Structures
305 Embankment Construction
306 Soil Erosion and Sedimentation Control
307 Turfing with Sods
308 Seeding and Mulching
309 Surface/Sub-Surface Drains
310 Preparation and Surface Treatment of Formation
311 Works to be Kept Free of Water
312 Water Courses at Culverts
313 Rockfill Embankment
314 Ground Improvement for Weak Embankament
Foundation Using Geosynthetic Drains and Stone
Columns.
SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS
401 Granular Sub-Base
402 Lime Treated Soil for Improved Sub-Grade/Sub-Base
403 Cement Treated Soil and Cement-Flyash Treated Sub
Base/Base
404 Water Bound Macadam Sub-Base/Base
405 Crushed Cement Concrete Sub-Base
406 Wet Mix Macadam Sub-Base/Base
407 Crusher-Run Macadam Base
408 Shoulders, Islands and Median
409 Cement Concrete Kerb and Kerb with Channel
410 Footpaths and Separators
BASES AND SURFACE COURSES (BITUMINOUS)
501 General Requirements for Bituminous Pavement
Layers
502 Prime Coat Over Granular Base
503 Tack Coat
504 Bituminous Macadam
505 Dense Bituminous Macadam
506 Sand Asphalt Base Course
507 Bituminous Concrete
508 Close-Graded Premix Surfacing/Mixed Seal Surfacing
59
63
7
79
82
85
89
90
90
91
92
109
112
116
121
129
131
136
139
142
143
149
166
168
170
174
183
188
192Contents:
509 Surface Dressing 194
510 Open-Graded Premix Surfacing 198
511 Seal Coat 205
512 Slurry Seal 207
513 Fog Spray 213
514 Micro-Surfacing 215
518 Stone Matrix Asphalt (SMA) 219
516 Mastic Asphalt 225
517 Crack Prevention Courses 231
518 Bituminous Cold Mix (Including Gravel Emulsion) 234
519 Recycling of Bituminous Pavement 242
520 Supply of Stone Aggregates for Pavement Courses 249
600 CONCRETE PAVEMENT
601 Dry Lean Cement Concrete Sub-Base 255
602 Cement Concrete Pavement 263
700 GEOSYNTHETICS
701 Geosynthetics for Road and Bridge Works 299
702 Geatextiles for Drainage, Separation and Erosion
Control 302
703 Geogrid 307
704 Geocomposite Drains 309
705 Geocell for Slope Protection 312
706 Geosynthetic Mat 34
707 Natural Geotextile 316
708 Paving Fabrics/Glass Grids 318
800 TRAFFIC SIGNS, MARKINGS AND OTHER ROAD
APPURTENANCES
801 Traffic Signs 325
802 Overhead Signs 335
803 Road Markings 338
804 Reflective Pavement Markers (Road Studs) and Solar
Powered Road Markers (Solar Studs) 353
805 Distance Indicator Posts 356
806 Road Delineators 357900
1000
1100
807
808
809
810
an
812
813
814
815
816
Contents
Boundary Stones
Fencing
Tubular Stee! Railing
Structural Steel Railing
Crash Barriers
Road Traffic Signals
Traffic Control and Safety Devices in Construction Zone
Traffic Impact Attenuators
Semi Automatic Toll Collection System
Advanced Traffic Management Systems (ATMS)
QUALITY CONTROL FOR ROAD WORKS
901
902
903
General,
Control of Alignment, Level and Surface Regularity
Quality Control Tests During Construction
MATERIALS FOR STRUCTURES
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
General
Sources of Materials
Bricks
Stones and Blocks
Cast Iron
Cement
Coarse Aggregates
Fine Aggregates
Steel
Water
Timber
Concrete Admixtures
Reinforced and Prestressed Concrete Pipes
Storage of Materials
Tests and Standard of Acceptance
PIPE FOUNDATIONS
1101
4102
1103
Description
Subsurface Investigations
Type of Piles
357
358
359
359
360
364,
366
371
372
381
415
417
421
439
439
439
440
440
440
442
443
443
4a7
449
449
451
451
453
457
457
4581200
1104
1105
1106
1107
1108
1109
1110
111
4112
4113
4114
1115
1116
117
1118
1119
Contents
Materials.
Test Piles
Precast Concrete Piles
Cast In Situ Concrete Piles
Steel Piles
Timber Piles
Driving Equipment
Driving
Raker (Inctined) Piles
Pile Tests
Pile Cap
Important Considerations, Inspection/Precautions for
Different Types of Piles
Tolerances
Tests and Standards of Acceptance
Measurements for Payment
Rate
WELL FOUNDATIONS
1201
1202
1203
1204
1205
1206
1207
1208
1209
1210
1211
1212
1213
1214
1215
1216
Description
General
Setting Out and Preparations for Sinking
Cutting Edge
Well Curb
Floating Caissons
Well Steining
Well Sinking
Bottom Plug
Sand Filling
Top Plug
Well Cap
Tolerances
Tests and Standards of Acceptance
Measurements for Payment
Rate
458
459
459
461
465
466
466
467
470
470
472
472
474
475
475
475
479
479
479
480
481
482
483,
483
494
495
495
495
495
496
496
4971300
1400
1500
Contents.
BRICK MASONRY
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
Description
Materials
Personnel
Cement Mortar
Soaking of Bricks
Joints
Laying
Jointing Old and New Work
Curing
Scaffolding
Equipment
Finishing of Surfaces
Coping for Wing/Return/Parapet Wall
Acceptance of Work
Measurements for Payment
Rate
STONE AND CONCRETE BLOCK MASONRY
1401 Description
1402 Materials
1403 Personnel
1404 Type of Masonry
1405 Construction
1406 Pointing
1407 Curing
1408 Scaffolding
1409 Weep Holes
1410 Jointing with Existing Structures
1411 Coping for Wing/Return/Parapet Walls
1412 Tests and Standard of Acceptance
1413 Measurements for Payment
1414 Rate
FORMWORK
1501 Description
1502 Materials
vi
501
501
501
501
502
502
502
503
503
503
504
504
505
506
506
506
509
509
509
509
509
515
515
515
515
516
516
516
516
516
519
5191600
1700
1503
1504
1505
1506
1507
1508
1509
1510
1811
1512
1513
Contents
Design of Formwork
Workmanship
Lining of Formwork
Precautions
Preparation of Formwork Before Concreting
Removal of Formwork
Re-Use of Formwork
Specialized Formwork
Tests and Standards of Acceptance
Measurements for Payment
Rate
STEEL REINFORCEMENT
1601
1602
1603
1604
1605
1606
1607
1608
1609
Description
General
Protection of Reinforcement
Bending of Reinforcement
Placing of Reinforcement
Bar Splices
Testing and Acceptance
Measurement for Payment
Rate
STRUCTURAL CONCRETE
1701
1702
1703
1704
1705
1706
1707
1708
1709
1710
1711
1712
1713
Description
Materials
Grades of Concrete
Proportioning of Concrete
Admixtures
Size of Coarse Aggregates
Equipment
Batchinh, Mixing, Transporting, Placing and Compaction
Construction Joints
Concreting Under Water
Concreting in Extreme Weather
Protection and Curing
Finishing
vi
519
519
521
521
522
522
523
523
524
524
524
527
527
527
527
528
529
531
531
532
535
535
535
538
543
544
545
546
550
551
552
553
555Contents
1714 Concrete with Blended Cements or Mineral Admixtures 555
1715 High Performance Concrete 556
1716 Tolerances 558
1717 Tests and Standards of Acceptance 558
1718 Measurements for Payment 562
1719 Rate 562
1800 PRESTRESSING
1801 Description 565
1802 General 565
1803 Materials 565
1804 Testing of Prestressing Steel and Anchorages 568
1805 Workmanship 568
1806 Supervision 572
1807 Tensioning Equipment 872
1808 Post Tensioning 573
1809 Grouting of Prestressed Tendons 574
1810 Pre-Tensioning 575
1811 Protection of Ends 579
1812 Safety Precautions During Tensioning 579
1813 Surface Preparation 879
1814 Transportation Storage and Handling of Precast Girders 580
1815, Tolerances 581
1816 Tests and Standards of Acceptance 581
4817 Measurements for Payment 581
1818 Rate 582
1900 STRUCTURAL STEEL
1901 Description 585
1902 General 585
1903 Materials: 585
1904 Fabrication 589
1905 Erection 605
1906 Painting 614
1907 Tests and Standards of Acceptance 618
1908 Measurements for Payment 619
1909 Rate 620
vill2000
2100
2200
2300
Contents
BEARINGS
2001 Description
2002 General
2003 Steel Bearings
2004 Special Bearings
2005 Elastomeric Bearings
2006 Pot Bearings
2007 Inspection and Testing
2008 Test and Standards of Acceptance
2009 Measurements for Payment
2010 Rate
OPEN FOUNDATIONS
2101 Description
2102 Materials
2103 General
2104 Workmanship
2105 Tests and Standards of Acceptance
2106 Tolerances
2107 Measurement for Payment
2108 Rate
SUBSTRUCTURE
2201 Description
2202 Materials
2203 General
2204 Piers and Abutments
2205 Pier Cap and Abutment Cap
2206 Dirt Wall, Return Wall and Wing Wall
2207 Tests and Standards of Acceptance
2208 Tolerances in Concrete Elements
2209 Measurements for Payment
2210 Rate
CONCRETE SUPERSTRUCTURE
2301 Description
2302 Materials
623
623
624
631
633
648
659
659
659
660
663
663
663
663
666
666
666
666
669
669
669
669
670
671
671
671
672
672
675
6752400
2500
2303
2304
2305
2306
2307
2308
2309
2310
Contents
General
Reinforced Concrete Construction
Prestressed Concrete Construction
Cast In-Place Voided Slabs
Tolerances
Tests and Standards of Acceptance
Measurement for Payment
Rate
675
675
676
682
682
683
683
684
SURFACE AND SUB-SURFACE GEOTECHNICAL INVESTIGATION
2401
2402
2403
2404
2405
2406
2407
2408
2409
2410
2411
2412
2413
2414
2415
Description
Extent and Number of Bores
Depth of Bores
Detailed Investigation
Detailed Investigation for Bridge Foundations
Resting on Rock
Boring
Records of Boring and Trial Pits
Methods of Sampling
Procedure for Taking Samples
Preservation, Handling and Labelling of Samples
Tests for Investigation of Shallow Foundations
of Bridges
‘Tests for Investigation for Deep Foundations
of Bridges,
Testing of Material for Foundations of Guide
Bunds and High Embankments
Measurements for Payment
Rate
RIVER TRAINING WORK AND PROTECTION WORK
2501
2502
2503
2504
2505
2508
Description
Guide Bund
Apron
Pitching/Revetment on Slopes
Rubble Stone/Cement Concrete Block Flooring Over
‘Cement Concrete Bedding
Dry Rubble Flooring
x
687
687
688
688
689
692
692
694
694
696
697
697
698
698
700
703
703
704
709
711
7122600
2700
2800
2507
2508
2509
2510
Contents
Curtain Wall and Flexible Apron
Tests and Standards of Acceptance
Measurements for Payment
Rate
EXPANSION JOINTS
2601
2602
2603
2604
2605
2606
2607
2608
2609
2610
2611
2612
2613
2614
2615
Description
General
Performance Requirements
Filler Joints
Reinforced Elastomeric Joint
Single Strip/Box Seal Joint
Modular Strip/Box Seal Expansion Joints
Asphaltic Plug Joint
Compression Seal Joint
{installation of Expansion Joints
Testing and Acceptance Standards
Tests and Standards of Acceptance
Measurements for Payment
Rate
WEARING COAT AND APPURTENANCES
2701
2702
2703
2704
2705
2706
2707
2708
2769
Description
Wearing Coat
Railings and Crash Barrier
Approach Slab
Drainage Spouts
Weep Holes
Tests and Standards of Acceptance
Measurements for Payment
Rate
REPAIR OF STRUCTURES
2801
2802
2803
Description
General
Sealing of Cracks by Injection of Epoxy Resin
xi
712
713
713
713
723
723
724
725
726
728
730
732
734
736
744
744
748
748
748,
751
751
752
754
754
755
755
755
756
759
759
7592900
3000
2804
2805
2806
2807
2808
2809
2810
2811
2812
2813
2814
2815
Contents
Replacement of Spalled Concrete by Epoxy
Mortar/Polymer Mortar
Epoxy Bonding of New Concrete to Old Concrete
Cement Grouting
Guniting/Shotcreting
Protective Surface Coating of Concrete by Acrylic
Elastomeric Coating
Protective Surface Coating of Concrete by Patented
Systems of Coating
Replacement of Bearings
Repair and Replacement of Wearing Coat
External Prestressing
‘Tests and Standards of Acceptance
Measurements for Payment
Rate
PIPE CULVERTS
2901
2902
2903
2904
2905
2906
2907
2908
2909
2910
2911
Scope
Materials
Excavation for Pipe
Bedding for Pipe
Laying of Pipe
Jointing
Backfilling
Headwalls and Other Ancillary Works
Opening to Traffic
Measurement for Payment
Rate
MAINTENANCE OF ROAD
3001
3002
3003
3004
3005
General
Restoration of Rain Cuts
Maintenance of Earthen Shoulders
Bituminous Work in Connection with Maintenance
and Repair
Maintenance of Cement Concrete Road
xi
766
769
769
77
773
775
776
776
777
778
773
779
783
783
783
784
784
785,
785
786
786
786
786
789
789
790
791
7973100
3200
APPENDICES
Appendix 1
Appendix 2
Appendix 3
Appendix 4
Appendix
Contents
REINFORCED EARTH
3101 Scope
3102 Design
3103 Reinforcing Element
3104 Earth Fill
3105 Facia Material
3106 Construction Details
3107 Reinforced Soil Slopes
3108 System Responsibility, Performance Bond
3109 Measurement for Payment
3110 Rate
SOIL NAILING
3201 Scope
3202 Nail Installation Methods
3203 Construction Materials
3204 Facing Types
3205 Construction Sequence
3206 Geotechnical Aspects
3207 Analysis of Failure Modes
3208 Initial Design Considerations
3209 Other Design Considerations
3210 Field Pullout Testing
3211 Measurement for Payment
3212 Rates
3213, References
List of IRC Publications Referred to in the Specifications
List of Indian and Foreign Standards Referred to in the
Specifications
Method of Sieving for Wet Soils to Determine the Degree of
Pulverisation
Anti-Stripping Agents Used for Bituminous Materials and Mixes
1200/1-1 History of Sinking of Well
1200/1-2 Plan of Well Nos.
1200/2 __‘Tiltaand Shift in Well Nos.
xii
801
801
201
804
805
807
810
811
812
812
821
821
821
822
823
823
824
824
825
826
827
827
829
831
833
847
848
855
856
857Appendix
Appendix
Appendix
Appendix
1500/1
1700/1
18001
1800/2
1800/3
1800/4
2800
Contents
Information to be Supplied by the Manufacturers of
Proprietary Systems
Specification for Construction Joints
Tests on Sheathing Ducts
Prestressing Report
Specifications for Grouting of Post-Tensioned
Cables in Prestressed Concrete Bridges
Grouting Record
xiv
859
861
864
871
873
882
883100
GENERAL