P.U. Barreras
P.U. Barreras
MATERIALES
B-FAB-BAR FABRICACION DE BARRERA. INCLUYE ML $537.70 * 2.000000 $1075.40 22.73%
MANO DE OBRA, CIMBRA
MA-03-250.1 CONCRETO PREM, FC= 250 KG/CM² M3 $2,064.09 * 0.945000 $1950.57 41.24%
MA-01-ACREF-01ACERO DE REFUERZO f'y=4,200 KG/CM² JGO $15.19 * 19.950000 $303.04 6.41%
ANALISIS DE BÁSICOS
Análisis: B-FAB-BAR ML
FABRICACION DE BARRERA. INCLUYE MANO DE OBRA, CIMBRA
MATERIALES
CUAD-02-X 1 Albañil + 1 Ayudante JOR $1,507.25 / 5.000000 $301.45 56.06%
MATCIMBRA CIMBRA MODULAR M3 $250.00 * 0.945000 $236.25 43.94%
ANALISIS DE BÁSICOS
Análisis: B-TUB-GAL-01 ML
TUBERIA GALVANIZADA DE 2"
MATERIALES
MATTYBO TUBO GALVANIZADO 2" ML $295.00 * 1.030000 $303.85 100.00%
ANALISIS DE BÁSICOS
Análisis: BASALBMOR1:3 M3
MORTERO CEMENTO ARENA 1:3
MATERIALES
MAT-CEMENTO CEMNTO NORMAL GRIS CPC 30 TON $2,500.00 * 0.560000 $1400.00 65.93%
MAT-ARENA ARENA M3 $290.00 * 1.120000 $324.80 15.29%
MAT-AGUA AGUA M3 $50.00 * 0.440000 $22.00 1.04%
CUAD-02-X 1 Albañil + 1 Ayudante JOR $1,507.25 / 4.000000 $376.81 17.74%
ANALISIS DE BÁSICOS
ANALISIS DE BÁSICOS
ANALISIS DE BÁSICOS
ANALISIS DE BÁSICOS
Análisis: MA-03-250.1 M3
CONCRETO PREM, FC= 250 KG/CM²
MATERIALES
MATCONCRETO Concreto hidráulico a 3 dias f´c=250kg/c M3 $2,003.97 * 1.030000 $2064.09 100.00%