JSA For Earth Work & Excavation
JSA For Earth Work & Excavation
Page 2 of 4
shoring/shuttering to be done.
Excavated earth should not be placed
within 1.5m of edge of the
excavation.No material to be stacked
within 1.5m from the edeg of exavation.
Vehicle shall not be operate within 2 m
of edge of excavation.Proper
moniotoring of condition of wall of
excavation to be observed.
5.Fall of materials / person in 5. Provide hard barrication when depth Concerned
excavation. is more than 1.2 m depth all around the Engineer
pit.Don’t keep any materials near the /Supervisor
edge of excavated pit.Access ladder
need to be provided in excvvated pit.
Minimum 500mm wide access way with
proper handrail to be provided. Ensure
proper lighting arrangement at
excavated area. No person should be
work inside the excavated pit during
back filling . Provide walk able
minimum500 mm wide access way to
the bottom of pit with hand rail.
4. Water logging. 6. Ensure coupling guard for dewatering Concerned
pump. Ensure power connection routed Engineer
through ELCB 30ma for dewatering /Supervisor
pump.
7. Vibration from Roller. 7. Equipment like Roller/Dumpers Concerned
condition should be check regularly. Engineer
/Supervisor
8. Tilting & toppling of Roller. 8. Authorized Operator should be Concerned
deployed. Un-authorized person entry Engineer
restricted. One person shall be available /Supervisor
during operation of Equipment if
required.
9. Electrocution. 9.All electrical equipment shall be tested Concerned
and duly certified for safe operation by Engineer
P&M. Double earthing shall be provided /Supervisor
for all electrical equipment and the
same shall be connected through ELCB.
Only dedicated Elecrician shall be
engaged to electrica work.
C.Base Compaction. 1. Roller toppling due to 1. Ground condition shall be checked Concerned
uneven ground condition. before starts compaction by Roller Engineer
machine. /Supervisor
2. Fall of improper stacked 2. Proper material stacking shall be Concerned
materials / pole/ stand due to ensured around the compack area. Engineer
Page 3 of 4
vibration of Roller. /Supervisor
3. Under ground & overhead 3. Under ground & over head electrical Concerned
Cable. cable shall be removed from work area. Engineer
One dedicated person shall be available /Supervisor
to monitoring the movement of Roller
machine.
4. Unauthorized operator. 4. Only Authorized operator shall be Concerned
engaged to operate the Roller machine/ Engineer
Equipment. /Supervisor
5. Poor illumination. 5. Adequate illumination shall be Concerned
available at work area. Engineer
/Supervisor
6. Poor cable management. 6. Ensure person shall not be lifted more Concerned
than 55kg for materials shifting from Engineer
one place to other. Proper manual /Supervisor
material handling method to be
followed to avoid back pain.
7. Improper manual material 7. Ensure person shall not be lifted more Concerned
handling. than 55kg for materials shifting from Engineer
one place to other. Proper manual /Supervisor
material handling method to be
followed to avoid back pain.
D.Removal of unwanted Slip, trip, non removal of All unwanted materials to be removed Concerned
materials during earth debris and concrete wastes from excavated area. Disposal of Engineer
work & excavation. concrete debsis & other debris to be /Supervisor
disposed in regular intervals.
Page 4 of 4