Electrical grid is single entity with ....
a. Multiple generation plants and transmission network
1 b.Conventional generation plants and transmission network 1 d
c. Multiple generation plants and distribution network
d. Multiple generation plants, transmission and distribution network
Smart grid and electric grid that uses information and communication technology.
a. To gather data and act on information
2 b. To gather data only 1 a
c. To gather information only
d. To gather data and not to act on information
Objective of smart gide is ........
a. Smart utilisation of all the available resources.
3 b. Best utilization of all the available resources. 1 d
c. Optimumu utilization of all the available resources.
d. All of the above.
Function Of Communication Network In Smart Grid is....

a.Energy Generation
4
b.Control and Connectivity
1 b
c.Applications
d.Optimum use of energy
following are sub-domain a mains of greed domain of smart grid.
A. Generation domain only
5 B. Generation and transmission domain only 1 c
C. Generation and transmission and distribution domain only
D. transmission and distribution domain only
Third stage in evolutionof Smart Grid is ......

a. Preliminary stage
6
b. Elementary stage
2 c
c. Evolutionary stage
d. Post evolutionary stage
Self heating is a significant feature of......
A. Conventional grid
7 B. Smart grid 2 b
C. Micro grid
D. Macro grid
Which of the following plays crucial role in optimization of cost of energy?
a. Macro grid
8 b. Micro grid 1 b
c. Smart grid
d. Conventional grid
Challenge faced by Energy Storage System of smart grid is........
a. Complex design and network
9 b. Security 2 a
c. Consumer awareness
d. Stability of Power Flow
ISGTF abbreviations stand for............
a. Indian Smart Grid Task Force
10 b. International Scout and Guide Fellowship 2 a
c. International Smart Grid Task Force
d. India Standard Grid Task Force
Classification of micro grids is based on:
a. Type of controlling apparatus
11 b. Type of supply (AC/DC) 1 b
c. Type of load
d. Number of generating units
Question
Question Marks Answers
no.
Distributed generation plays significant role in macro grid to improve
a. increase the power demand on the grid
12 b. increasing the transmission line losses 1 c
c. increasing the reliability factor of supply
d. increasing the cost of power generation
Technology for distributed generation include
a.Micro-compressors
13 b.Micro-hydro turbines 2 b
c.Macro-hydro turbines
d.Macro-turbines
A key feature of a micro-gride is its ability.......................... seamlessly during grid
disturbance

14 a. Not to separate and isolate itself 2 b


b. To separate and isolate itself
c. To seprate but not to isolate itself
d. Not to seprate and iaolate itself
__is a stakeholders of smart grid
a. Oil manufacturing companies
15 b. Utility companies 1 b
c. Motor manufacturing companies
d. Political parties

A localized grouping of electricity generations, energy storages, and loads is termed as?
a.Macro Grid
16 b.Micro grid 2 b
c.National grid
d.state grid

What is the full form of DR in the perspective of Smart Grids


a. Divide and Rule
17 b. Demand and Responce 1 b
c. Delivery Rate
d. Data reduction
A micro-grid is designed for a____usually for a certain community whiles the smart grid is
designed for the _____electrical system.
a. Small scale, whole
18
b. Medium scale, whole
2 a
c. Large scale, whole
d. Small scale, partial
ndia Smart Grid Task Force (ISGTF) recommended............. Number of pilot projects in
different distribution companies.
a. 20
19
b. 18
2 c
c. 14
d. 16
"Transform the Indian power sector into a secure,adaptive, sustainable & digitally enabled
ecosystem that provides reliable & quality energy for all with active participation of
stakeholders"
20 I) Micro grid vision for India 2 d
II) Smart grid vision for USA
III) Smart grid mission for India
IV) Smart grid vision for India
micro grid can be operated said to be in islanded mode when....
A.it function synchronously
21 B.it function autonomously 2 b
C.it function asynchronously
D.it stop functioning