You are on page 1of 20
NOV ~ 2103322. Printed By: teyul Printed On: 2022-01-26 08:10:35 GMT+0000 TDS-8SA / 8SWC w/PH-100 Hydraulic and Electrical (CAT) Customer Acceptance Test NOV Rig Systems & Aftermarket, Orange, CA Customer: __ PETROVIETNAM RigName:_EX PVD 3 To PVD! Customer Configuration Number:_SO/F- ZFS 4 Rev. #:_D Part Number: OLFIABOF~ 0O2Z Serial Number: Se ee ‘Test Technician Name: _ 72%) [CC stamp: i, Customer Representative Name: 4 q Customer Rep. Signature: Date: 3 Party Witness Agency: (tf applicable) we Sele name: GA NARABT _ stamp ((f applicable) es 3" Party Inspector Signature: k Deol Date:_ 26] 1122 ‘Ambient Temperature: peiomel Test Faciity: 29 TWAS BAT DRIVE TestDate: 26 JA) 2022. National Oiwell Varco. '9e, CA 62068 Phone 714) 978-1900 Fax (714) 997-5029 3TS00660 T www.nov.com 2 NATIONAL OILWELL VARCO ‘TE Number: 3TS00660-DES Printed REV: T Latest REV: T Printed By: teyukl Rosument number printed On: ZBUBAASHD 8:55:13 GMT+-0800 Revision Page 2of 20 REVISION HISTORY T [10 0ct 2018 [See EN R. Munroe [R. Shumski[ R. Munroe R___| 2May 2016 [Adding TDs-eswe R.Mooers [D.Stephens| _R. Mooers P| 30 Oct 2015 |See EN Kerry Saxon | R.Mooers | _R, Mooers N | 28 Jul 2014 | Correct encoder values R. Movers | B.Shumski| R. Mooers ‘See EN, Add sensor test K. Saxon’ M | 22 Jul2014 | eouirements M. Pulido | R-Mocers | R. Movers A__| 01 Jul 2003 |Initial Release A. Faura H. Lim H. Lim Rev Date Reason for eau Prepared Checked Approved CHANGE DESCRIPTION Revision ‘Change Description A First issue Converted to new format, Added sensor test requirements For Link Tilt Anti Collision Kit test, change encoder readings from mV to V ‘Added prov for recording pressure reading in sections, 4.0, 5.0, 6.0, 7.0, 9.0, 11 &SWC water cooled unit. ‘Added support for PH-100 manifolds with “Float” solenoid. Modified for testing the TOS- a] a |vjzl= ‘Added testing the IBOP circuit when the 16517536 PH-100 Manifold Assembly is used ONAL OILWELL VARCO www.nev.com aa ‘TC Number: STSO06 rinted REVIT Latest REV: T Printed By: teyukl Document number Printed O1 Revision Page TABLE OF CONTENTS 4. SCOPE. i =a 2. REFERENCE DRAWINGS... 4 3. REQUIREMENTS, 4 4, ACCUMULATOR PRE-CHARGE, 5 5. HYDRAULIC MANIFOLD VERIFICATION. 5 5.1, ROTATING LINK ADAPTER LIFT CiRCUT 5 5.2. COUNTERBALANCE CIRCUIT 5 5.3, SHOT PIN CIRCUIT. 5 54. Clap CIRCUT a 5.6. ROTATING LINK ADAPTER MOTOR 6 56. IBOP Circurr . 87. LINKTILT GircurT. 6 5.8. BX ELEVATOR OPEN CIRCUIT, 7 6.9. BX ELevaTor Rotate Circuit 7 6. SOLENOIDS/PORT PRESSURIZATION.. 7 6.1. SOLENOID CHECK D 6.2. BRAKE SOLENOIDS. 7 6.3. SPARE AIR SOLENODD. 7 7. PH-100 FUNCTION TEST. 7 7.4. LINK Tit Witour MouseHOLE ENABLE 7 7-2. LINK TT WITH MOUSEHOLE ENABLE (OPTIONAL) 7 7.3. CLAMP CYLINDER: 8 7.4, IBOP. 8 7.8. BX ELEVATOR a 7.6. BX ELEVATOR'S ROTATORS WITHOUT MOUSEHOLE ENABLE (IF APPLICABLE) 8 7.7. BX ELEVATOR'S ROTATORS WITH OPTIONAL MOUSEHOLE ENABLE (IF APPLICABLE) 8 7.8. _ ROTATING LINK ADAPTER MOTOR : a 9 7.9. ROTATING LINK ADAPTER ENCODER (IF APPLICABLE). 9 8. ELECTRICAL INSPECTION.. 9 9. MOTOR MEGGER 9 10. COOLING MOTOR PRESSURE SWITCH (IF APPLICABLE) 11, AIR PURGED BEARING ISOLATOR (IF APPLICABLE) 12, DATA SHEET. 43. PUNCH LIST 14. COMMENTS, www.nov.com © wariona. omwett varco ‘TC Nuinber: STSOU6GU-DES printed REVIT Latest REV: Printed By: teyukl Document number Printed On: AVBHMSED 18:53:13 GMT +0800 vision Page 40f 20 4. SCOPE The purpose of this specification is to define a testing procedure for the Hydraulic and Electric devices on the TDS-8SA and TDS-8SWC for use with the PH-100 Pipe handler. This specification defines the procedure for testing any or all of the following functions: Counterbalance Circuit Rotating link Adapter Lift Circuit \BOP Circuit Shot Pin Circuit Rotating Link Adapter Motor Link Tilt Circuit Clamp Circuit BX Elevator Open Circuit BX Elevator Rotate Circuit Air Brake All Solenoids, Switches, Encoders, and Sensors Mousehole Enable (Optional) 2. REFERENCE DRAWINGS a. 16517536 PH-100 Manifold Assembly 30170747 PH-100 Manifold Assembly (legacy) b. 30152190 Rotating Head Motor Manifold Assembly c. 10854484 Shot Pin Assembly 30151875 Shot Pin Assembly (legacy) 4. 30173452 Counterbalance Manifold Assembly 2. 30156900 BX Elevator Open Manifold Assembly f 126895 BX Elevator Rotate Manifold Assembly g. 30171073 Air Manifold Assembly Record the Project Specific Numbers for the following: h SpE Fou. Rev. Customer Configuration i 2017 FH Rev. Hydraulic Schematic i R0rFPS¢E Rev._B~ Electrical interconnect 3. REQUIREMENTS Verify Factory Acceptance Test (FAT) 3TS00656 has been completed The TDS should be inspected to insure that the unit is assembled per the drawings and that the proper optional parts have been installed per the customer configuration sheet, This is to include, but is not limited to, proper voltage of motors, correct bail length, correct location of S-Pipe, installation of pipe handler jaws, etc. The Electrical System is to be visually inspected to insure all wires and cables are labeled, and that all electrical equipment are to be adjusted and calibrated as outlined in this. document, vrmw.nov.com © wariowa. onweLt varco “TC Nuiaber? STSDOG6O-DES———Printe REVS — Latest REV: T Printed By: teyukl Document number Printed On: BTBAV6H18:53:13 GMT+0800 vision Page 5 of 20 The Hydraulic System is to be adjusted and calibrated as outlined in this document. The system is to be thoroughly inspected for leaks and all functions should be tested for proper operation. All accumulators will be pre-charged in order to conduct these tests. The unit will be thoroughly greased per the TDS service manual prior to leaving the facility. Data Sheet entries are required for each of the following test/inspection operations. Whenever possible, actual data values will be recorded in spaces provided. 4, ACCUMULATOR PRE-CHARGE Verify the nitrogen pre-charge of two Counter-Balance and one Rotating Link Adapter Lift hydraulic accumulators with dry nitrogen. With no hydraulic pressure in the system, actuate the manual “Shutdown/Service Mode” lever located on the Counterbalance Manifold Assembly. Verify that the hydraulic pressure gages on the manifold read 0 PSI 4.1. Verify the nitrogen pre-charge of the Counterbalance System Accumulators are set to 900 PSI + 25 and record results, 4.2. Verify the nitrogen pre-charge of the Rotating Link Adapter Accumulator is set to 900 PSI + 25 and record results. 4.3. Verify the nitrogen pre-charge of the Motor Alignment Accumulator is set to 900 PSI + 25 and record results. 4.4. Actuate the manual switch to the “Normal Run Mode” position. 5. HYDRAULIC MANIFOLD VERIFICATION Apply hydraulic pressure of 2500 PSI to the system. Verify no leakage. Energize all ‘solenoids, or manually shift all valves, to wet all ports and passages. 5.1. Rotating link Adapter Lift Circuit 5.1.1. Verify MV4 manually operated valve is in Run Mode. Record pressure on gage located at test port C3. 5.2. Counterbalance Circuit NOTE: RV4 is factory pre-set at 2500PSI: [Verify MV4 manually operated valve is in Run Mode. Increase HPU pressure to 2700 PSI to verify overload valve RV4. Open pressure control valve PC4 to max setting. Verify RV4 factory preset value of 2500 PSI. Record pressure on gage located at test port C4.] 5.2.1. Re-adjust HPU to 2500 PSI. Record pressure on gage located at port C4. 5.2.2. Tum off HPU and verify RLA and counterbalance accumulators hold set point pressures within 25 PSI for 15 minutes. 5.2.3. Sel Mode Valve to "Service Mode.” Observe pressure decay on gages located on port C3 and C4. Verify accumulators discharge completely. 5.2.4. Set Mode Valve to "Service Mode.” Observe pressure decay on gages located on port C3 and C4. Verify accumulators discharge completely. 5.3, Shot Pin Circuit 5.3.1. Position the rotating head so that the shot pin will not engage a hole in the gear. The shot pin should come to rest on the face of the gear. Record pressure at test port BS. www.nov.com © wariowaL onweLt vaRco “TC Nuinber: STS0O6O-DES Pate REV —— Latest REV: T Printed By: teyuk Document number printed On: 281809580) Revision y Page 6 of 20 5.4. Clamp Circuit 5.4.1. Position the rotating head so that the shot pin will engage a hole in the gear. Connect Gages to test ports E2 and G2. 5.4.2. Energize the Clamp solenoid valve and observe shot pin advancement, Observe G2 at low (tank) pressure verify System Pressure at E2. 5.4.3. De- Energize the solenoid valve and observe shot pin dis-engagement. Observe E2 at low (tank) pressure verify System Pressure at G2. 5.5. Rotating Link Adapter Motor 5.5.1. Position the rotating head so that the shot pin will engage a hole in the gear. Connect gages to test ports P, RVA and RVB. Operate the clamp solenoid valve to advance the shot pin. Verify System Pressure to Directional control vale at Port P. 5.5.2. With the shot pin engaged, energize the Rotate CCW solenoid. Record pressure at test port A. 5.5.3. With the shot pin engaged, energize the Rotate CW solenoid. Record pressure at test port B. 5.6. IBOP Circuit 5.6.1. For PH-100 Manifold 30170747, energize the IBOP Open solenoid. Observe system pressure at port C1. De-energize the solenoid to trap pressure at port C1 Pressure at port C1 may decay up to 150 PSI. Repeat solenoid on and off sequence to verify set point. Record pressure at test port C1, 5.6.2. For PH-100 Manifold 30170747, energize the IBOP Close solenoid. Observe system pressure at port C2. De-energize the solenoid to trap pressure at port C2. Pressure at port C2 may decay up to 150 PSI. Repeat solenoid on and off sequence to verify set point. Repeat solenoid on and off sequence to verify set point. Record pressure at test port C2. 5.6.3. For PH-100 Manifold 16517536, energize the IBOP Open solenoid. Observe system pressure at port C1. De-energize the solenoid to go to "LO PRESS MAINTAIN OPEN" mode. Repeat solenoid on and off sequence to verify setpoint, Record pressure at test port C1 5.6.4. For PH-100 Manifold 16517536, Energize the IBOP close solenoid. Record system pressure at port B1. De-energize the IBOP Close solenoid 5.7. Link Tilt Circuit 5.7.1. Connect pressure gages to test ports E3 and G3. Energize Link Tilt “Drill” Solenoid. De-energize solenoid and observe G3 at low (tank) pressure, and record pressure at test port E3. 5.7.2. Energize Link Tilt ‘Tilt’ Solenoid. De-energize solenoid and observe E3 at low (tank) pressure, and record pressure at test port G3. 5.7.3. For PH-100 Manifold 30170747, energize both solenoids simultaneously and verify both E3 and G3 at low (tank) pressure. For PH-100 Manifold 16517536, energize the Link Tilt “Float” solenoid and verify that both 3 and G3 are at low (tank) pressure. woww.nov.com ‘© waviowa. onweit varco “TC Nuiber STSOOGGU-DES rte REV 213 GMT+0800 Latest REV: T Printed By: teyukl Derma nur ber Printed On: PANBANEP 18:53:13 GMT+0800 vision Page 7 of 20 5.8. BX Elevator Open Circuit 5.8.1, Connect pressure gages to test port S3 on RLA, Observe S3 at low(tank) pressure. Energize solenoid and Verify System Pressure at S3. 5.9. BX Elevator Rotate Circuit No hydraulic adjustments required for the BX Elevator Rotate Manifold. Note 1: Blower motor over temp switch is factory set by motor vendor. Note 2: Lube system flow switches verified during motor test. 6. SOLENOIDS/PORT PRESSURIZATION 6.1. Solenoid Check ‘Apply shop air pressure and 2000 PS! hydraulic pressure to unit. Operate solenoid valves and verify correct operation by monitoring air pressure or hydraulic pressure sing test gauges on the corresponding Rotating Link Adapter passages. Hydraulic pressure may vary + 150 PSI for this portion of the test. 6.2. Brake Solenoids 6.2.1. Energize the Brake On solenoid. Listen for actuation of the solenoid when energized. 6.2.2. Energize the Brake Off solenoid. Listen for actuation of the solenoid when energized and exhaust of air. 6.3. Spare Air Solenoid 6.3.1, Energize the spare air solenoid. Listen for actuation of the solenoid when energized 7. PH-100 FUNCTION TEST Set the PH-100 Torque Arrestor Assembly alongside of the Top Drive, Connect the hoses from the Rotating Link Adapter to the Torque Arrestor Assembly. 7.1. Link Tilt Without Mousehole Enable Note: For units equipped with Link Tilt Anti Collision Kit, monitor the Link Tilt Encoder using the OCAS Receiver. 7.4.1. Energize the Link Tit “Tilt” Solenoid. Confirm that the link tilt cylinders retract smoothly. Observe the crank tilt out partially to the derrick man stop position. 7.1.2, Fully retract the cylinder and if applicable, verify that the cylinder encoder reads 0.5+0.5V. 7.1.3, Energize the Link Tilt ‘Drill Down” solenoid. Confirm that the link tlt cylinders extend smoothly. If applicable, verify that the cylinder encoder reads 10.0 + 0.5V. 7.1.4. For the 30170747 PH-100 manifold, energize both “Drill” and “Tilt” solenoids at the same time and confirm the link tilt floats down. For the 16517536 PH-100 manifold, energize the “Float” solenoid and confirm the link tilt floats down. 7.2, Link Tilt With Mousehole Enable (Optiona)) www.nov.com ‘© waviomar onweLt varco ‘TC Nuiubere STSO0660-DES Printed REVIT Latest REV: T Printed By: teyukI Document number Printed On: 281899580 18:53:13 GMT+0800 Revision T Page Bof20 Note: For units equipped with Link Tilt Anti Collision Kit, monitor the Link Tilt Encoder using the OCAS Receiver. 7.2.1, Energize the Link Tilt “Tilt” Solenoid. Confirm that the link tilt cylinder retract smoothly. Observe the crank tilt out partially to the derrick man stop position. 7.2.2. Fully retract the oylinder and if applicable, verify that the cylinder encoder reads 0.5 £0.5V, 7.2.3. Energize the Link Tilt “Drill Down” solenoid. Confirm that the link tilt cylinders extend smoothly. If applicable, verify that the cylinder encoder reads 10.0 + 0.5V. 7.2.4. Energize the Mousehole Enable solenoid. Confirm the stop cylinder moves the link tilt stop. 7.2.5. Energize both the Link Tilt “Tilt” and Mousehole Enable solenoids at the same time. Confirm that the link tit oylinders retract smoothly and the crank extends to the Mousehole position 7.2.6. For the 30170747 PH-100 manifold, energize both *Drill” and “Tilt” solenoids at the same time and confirm the link tilt floats down. For the 16517536 PH-100 manifold, energize the “Float” solenoid and confirm the link tilt floats down. 7.3. Clamp Cylinder 7.3.1. Position the rotating head so that the shot pin will engage a hole in the gear. Clamp and unclamp the jaws. Confirm smooth operation of the shot pin and the clamp cylinder. 7.3.2. Raise the clamp cylinder up (handle up). The clamp cylinder piston must be in the unclamped position to do this. Lower the clamp cylinder down (handle down). 7.3.3. Position the rotating head so that the shot pin will not engage a hole in the gear. Energize the clamp cylinder. Confirm the clamp cylinder does not function. 7.4. IBOP 7.4.1. Energize the IBOP Close Solenoid. Confirm that the actuator cylinder retracts with smooth operation. Verify actuation of IBOP Pressure switch when the IBOP close solenoid is energized. 7.4.2, Energize the IBOP Open solenoid. Confirm that the actuator cylinder extends with smooth operation. Verify IBOP Pressure Switch goes off, 7.5. BX Elevator 7.5.1, Energize solenoid and verify pressure switch actuation 7.5.2. De-energize solenoid and verify pressure switch goes off. 7.6. BX Elevator’s Rotators Without Mousehole Enable (If Applicable) 7.6.1. If the TDS is equipped with an Elevator Rotation Control Manifold, connect gages to test ports C1 and C2 of the Elevator Tilt manifold (located on the torque arrestor of the PH-100. Energize the Elevator Rotate Up solenoid. Verify system pressure at port C1. 7.6.2. Energize the Elevator Rotate Down solenoid. Verify system pressure at port C2. 7.6.3. Energize both solenoids. Verify ports C1 and C2 drop to tank. 7.7. BX Elevator’s Rotators With Optional Mousehole Enable (If Applicable) ww.nov.com @Y wariona onwet varco ‘TC Nuimber: 3TSOU6G0-DES Printed REVE T Latest REV: T Printed By: teyukt Document number Printed On; 2H189968018:53:13 GMT+0800 Revision T Page 9 of 20 7.7.1, If the TDS is equipped with an Elevator Rotation Control Manifold, connect gages to test port C1 of the Elevator Tilt manifold (located on the torque arrestor of the PH-100. Energize the Elevator Rotate Up solenoid. Verify system pressure at port C1. 7.7.2, Energize the Elevator Rotate Down solenoid. Verify system pressure at port C2 7.7.3. Energize both solenoids. Verify ports C1 and C2 drop to tank. 7.8. Rotating Link Adapter Motor 7.8.1, Energize the Rotating Link Adapter solenoid (either CW or CCW) as much as possible without interfering with the shipping brace. Verify proper operation and direction 7.8.2. Verify proper operation of proximity sensor when rotating gear. 7.9. Rotating Link Adapter Encoder (If Applicable) 7.9.1. Rotate the RLA so it is approximately centered, engage the shot pin and record the encoder angle that is displayed on the tester. 7.9.2. Disengage the shot pin and rotate the RLA CW by 4 shot pin holes, 7.9.3. Engage the shot pin and record the encoder angle that is displayed on the tester. 7.9.4, Subtract the first reading from the second and verify that the total rotation is 242° 28° ELECTRICAL INSPECTION 8.1. Inspect for correct assembly per appropriate electrical schematic. 8.2. Visually and physically inspect cable terminations. 8.3. Verify that electrical component cable glands installed are tight, potted (when applicable), and boots are installed (when applicable) 8.4. Inspect the stainless steel sheet metal boxes for seal and/or flange damage, reject if mechanically damaged. Visually inspect the mounting panel for damage and make sure no grease or other contaminants are on the face of the panel. Verify all components are Ex or EEx type (motors, J-boxes, switches, etc.) Visually inspect all items as listed on the data sheet. MOTOR MEGGER Megger to earth all of the leads of the AC-motors from the TDS J-boxes. Record all readings. Resistance to earth is to be greater than 2 MQ. For motor voltages <460VAC. use the 500 Volt scale of the Megohm Meter. For motor voltages >480VAC use the 1000 Volt scale of the Megohm Meter. 9.1. Drilling Motor leads (U, V, W) 9.2. Blower Motor leads (U, V, W), if applicable 9.3. Lube Pump Motor leads (U, V, W) www.nov.com © waviomat onwent vanco ‘TC Nuiiber: STSO0660-DES Printed REVIT Latest REV: T Printed By: teyukl Document number Printed On: 281899680 18:53:13 GMT+0800 Revision rT Page 10 of 20 10.COOLING MOTOR PRESSURE SWITCH (IF APPLICABLE) 10.1.Check hookup of pneumatic lines to cooling system pressure differential switch. "HIGH" side should be connected to discharge side of blower ducting and "LOW" side should be connected to suction side of ducting. See Figure 1 for detail 10.2,Power up Blower Motor and verify differential pressure switch actuation, =, GA... FIGURE 1 11.AIR PURGED BEARING ISOLATOR (IF APPLICABLE) The Air Purged Bearing Isolator is located in the Motor Bonnet Assembly below the Wash Pipe Packing. This is a greaseless isolator and mechanical seal requiring an air pressure purge. Verify an air line is plumbed to the 10 PSI regulator. 11.1.Adjust air regulator located on manifold assembly. Verify gage on regulator reads 2 to 5 PSI. 10 View OF RETAINER ASSEWELY FIGURE 2 wwwnov.com NATIONAL OILWELL VARCO Latest REV: T Printed By: teyukt Document number printed On: AYBAIEHO 18:53:13 GMT+0800 Revision Page 110f20 12.DATA SHEET CHECK ALL THAT APPLY Step Fi re Verification Requirement | PLN ACCUMULATOR PRE-CHARGE Counterbalance Accumulators oe Left 900 PSI + 25 4.1. | Left Accumulator: 9 Psi Right Accumulator: YO Psi Ol. Right 900 PSI + 25 RLA Accumulator 42 Record Reading: «900s oid | 900 PSI #25 Motor Alignment Accumulator 43 | Record Reading: 700s O/C | 900 PSI #25 44 Actuate the manual switch to the “Normal Run Mode” position OK ROTATING LINK ADAPTER CIRCUIT PC3 Set point Record Reading: 20 Psi ole COUNTERBALANCE CIRCUIT 5.1.1 2000 PSI + 100 RV4 Set point 52-1 | Record Reading 9$00 Pst lc | 2500 PSI + 100 PCA Set point Record Reading [200 PSI Pressure Test 52.3 | Record Reading oo PSI ol PC3 & PCA + 25 PSI 5.2.2 ok 1200 PSI +75 5.2.4 | Service Mode Switch Setting at ee SHOT PIN CIRCUIT Shot Pin Engagement Force 4 53.1 | Record Reading ASO PSI 100 to 450 PSI wwwnov.com BY wx es ‘TC Nuinber: STS00660-DES Printed REV Latest RE’ Printed By: teyukl Document number Printed On: ISA96E0 18:53:13 GMT +0800 Revision T Page 12 of 20 te Veriteaton | Requirement [PLN ‘CLAMP CIRCUIT Clamp Solenoid ~ Port E2 541 | Record Reading: 2500 Ps! ok ‘System Pressure Unclamp — Port G2 £42 | Record Reading 2S00 PSI OC System Pressure ROTATING LINK ADAPTER MOTOR RVA Set point 5.8.1) Record Reading: __—- 2200 pg oc 2250PSI + 150 RVB Set point 55.2 | Record Reading __—- 2200 _—ipgi ow 2250PSI + 150 IBOP CIRCUIT (For Manifold 30170747) CB1 Set point 8.6.1 | Record Reading: Aso PSI ot. 500 PSI + 50 CB2 Set point 2 562 | Record Reading: “2000 _psi coc | 2000 PS!= 100 IBOP CIRCUIT (For Manifold 16517536) PC1 Setpoint 5.63 | Record Pressure NAL Psi 400 PSI #25 HA a System pressure at B1 584 | Record Pressure NAPS 2200 PS! + 300 LINK TILT CIRCUIT CB3 or CB4A Set point / 57-1 | Record Reading. 2200 _—Psi oc | 2200 PSI # 150 CBS or CB4B Set point 572 | Record Reading: 2200 _—PSI om ene Float Circuit 573 | Record Reading: 5 PSI OC E3 & G3 to Tank BX OPEN CIRCUIT Open Solenoid - Port S3 a 58.1 | Record Reading: _ 2800 _psi o ‘System Pressure TC Nuinber: NATIONAL OILWELL VARCO Latest REV: T Printed By: teyukl Document number Printed On: AIBN 8:83: 13 GMT +0800 Revision Page 13 of 20 SOLENOID CHECK WITHOUT MOUSEHOLE ENABLE REP. | Output an ee Verification | Requirement PLN Link Tit “Tit” System Pressure Link Tilt “Drill” System Pressure ] Link Tilt “Float” Tank Clamp System Pressure 1 Un-Clamp ‘System Pressure i 6.1 [IBOP Close A System Pressure [| IBOP Open’ ‘System Pressure : BX Elev Open System Pressure |] BX Rotate Up System Pressure | / BX Rotate Down System Pressure _|/ Air Elev Open/Spare SystemPressure_|/ Spare Hyd. (SOV-10) System Pressure || SOLENOID CHECK WITH MOUSEHOLE ENABLE Re? | Output a Verification | Requirement PLN Link Tit Tit System Pressure Link Tilt “Drill” System Pressure 1 Link Tilt “Float” Tank i Clamp ‘System Pressure 1 Un-Clamp ‘System Pressure l IBOP Close af ‘System Pressure I 6.1 | IBOP Open : ‘System Pressure cm BX Elev Open System Pressure i BX Rotate Up System Pressure _| | BX Rotate Down System Pressure |] Air Elev Open/Spare ‘System Pressure I Spare Hyd. (SOV-10) System Pressure _|/ Mousehole Enable System Pressure wwnw.nov.com ‘TC Nuimber: STSOU6U-DES Printed REV T © waviowa. onwe1t varco Latest REV: T Printed By: teyukl Page Document number Printed On; 2169968018:53:13 GMT+0800 Revision T 14 0f 20 ee Verification Requirement | PLN. BRAKE SOLENOIDS 6.2.1 | Brake On Solenoid orc | Functional 6.2.2 | Brake Off Solenoid ox | Functional SPARE AIR SOLENOID 6.3.1 | Spare Air Solenoid of | Functional PH-100 OPERATION, Without Mousehole Enable 7.1.1 | Link Tilt to Derrickman Cylinder Retract 742 Link Tilt to full retract Cylinder Retract 1 Read encoder (if applicable) 0520.5V 71g | Link Tiltto Drill Down Cylinder Extend “TS | Read encoder (if applicable) 10.0 + 0.5V 7.4.4 | Link Tilt Float I Functional 7.3.1 | Clamp/Unclamp i Functional 7.3.2 | Clamp Body Lift [| Functional 7.3.3 | Shot Pin Interlock NA | Functional at 7.4.1 | IBOP Close i Functional 7.4.2 | IBOP Open | Functional BX Elevator Supply Pressure 7.8.1 | Record Reading: 1800 PSI +50 PSI 7.5.2 | BX Elevator / Switch Activates BX Rotator Up — Port C1 7.1 | Record Reading: Psi | System Pressure BX Rotator Down - Port C2 7.62. | Food Renting: ps / System Pressure BX Rotator Float — Ports G1 & C2 7.6.3 Record Reading: Psi Tank Pressure www.nov.com ‘TC Nuiiber: STSOVG60-DES arated REV ‘© warionat ouweLt vanco Latest REV: T Printed By: teyukl Document number Printed On: BUBNEGP 8:5: 13 GMT +0800 Revision Page 15 0f 20 Sp Verification Requirement PLN No. 7.8.1 | Rotating Link Adapter Rotate Functional 7.8.2 | RLA Proximity Sensor Functional 7.9.1 | RLA encoder angle (if applicable) 242% °5 PH-100 OPERATION (Optional With Mousehole Enable) 7.2.1 | Link Tilt to Derrickman Cylinder Retract 722 | Link Tit to ful retract Cylinder Retract Read encoder (if applicable) 05+0.5V 7.23 | Link Tiltto Dri Down Cylinder Extend Read encoder (if applicable) 10.0+ 0.5V 7.2.4 | Link Tilt Stop Cylinder l Functional 7.25 | Link Tilt to Mousehole / Functional 7.26 | Link Tilt Float i Functional 7.3.1 | Clamp/Unclamp / Functional 7.3.2 | Clamp Body Lift NA Functional Nn 7.3.3 | Shot Pin Interlock / Functional 7.4.1 | IBOP Close / Functional 7.4.2 | |BOP Open / Functional BX Elevator Supply Pressure 751 | Record Reading: PSI So eee 7.5.2 | BX Elevator i Switch Activates BX Rotator Up — Port C1 77-4 | Record Reading pal | ‘System Pressure BX Rotator Down — Port C2 7.7.2 | Record Reading na System Pressure www.nov.com © wariona. ouweut varco ‘TC Nuimbers STSOU60-DES Prine REV? T Latest REV: T Printed By: teyuk Bocument number Printed On: 2BTBG5E018:53:13 GMT+0800 Revision Page 16 of 20 Sep ie Verification Requirement | PLN 8X Rotator Float - Ports C1 & C2 773 Record Reading Psi Tank Pressure 7.8.4 | Rotating Link Adapter Rotate vi Functional et 4 7.8.2 | RLA Proximity Sensor Functional i 7.9.4 | RLA encoder angle (if applicable) 242° °5 ELECTRICAL INSPECTION Electrical Assembly Inspection 81 | wg. No, Sol'FSO16 8.2 | Inspect cable lugs 6K. _ | Visually correct Cable glands are tight ok | Tight 8.3 Cable glands are potted el<_| Potted (EExde only) Label information J-box correct label information ea Serial number present See li OK _| present O-rings installed correcty (if required) KK | Correct Flange surfaces OK ok | 00d surface EEx Nameplates properly attached OK Attached 8.4 Hinges and seal functional OK _ | Functional EEx cover screw retainer (if required) OK | Installed Lug mounting plate OK _| Clean & undamaged Plating on parts C£_| No chipping Wire terminals labeled OK | Per schematic Allelectrical components are correct type OK | ExorEex www.n0 NATIONAL OMLWELL VARCO TC Nuinber os Latest REV: T Printed By’ teyuk Document number Printed On: @ISI966018:55:13 GMT+0800 Revision i Page 17 of 20 ne Verteaton | Requirement | PUN MOTOR MEGGER Drill Motor U Record Reading: >__/S2¢ MOhm OK >2M Ohm Drill Motor V 91 | Record Reading: > /S-&2 Mohm} of >2M Ohm Drill Motor W Record Reading: > IST monm}] of >2M Ohm. Blower Motor U (if Applicable) Record Reading: >__ SCO Mohm} Ok >2M Ohm Blower Motor V (if Applicable) 92 | Record Reading: > tD MOhm OK: >2M Ohm Blower Motor W (If Applicable) Record Reading: >_< Mohm} OK >2M Ohm Lube Pump Motor U Record Reading: > Mmonm| oe >2M Ohm Lube Pump Motor V 83 | Record Reading: > SD Monm| Ok >2M Ohm Lube Pump Motor W Record Reading: > CSO Mohm| OK >2M Ohm BLOWER MOTOR PRESSURE SWITCH (If Applicable) 10.1 | Pressure Differential Switch Oe. |Perriques 10.2 | Blower Motor OK. | Switch Activates AIR PURGING BEARING ISOLATOR (/f Applicable) 11.1 | Record Reading 3 Psi ot. |2t05Psi weww.nov.com “TC Nuiiberr STSOOGD-DES rite REV © warioma. onweit varco Latest REV: T Printed By: teyukl Document number printed On: TBAVGED 18:93:13 GMTT+0800 Revision ‘i Page 180f20 13.PUNCH LIST Equipment Type: Page __of Serial # i Configuration #: Punch List ins page te caplet tore paes Notes: “A” Punch list item must be completed prior to shipping Cleared by = |B" Unit may ship without correction of discrepancy.| $ £ als & Punch list item to be addressed at a later date as| 2 = gl 3 EE required. g 2 2 3 $ g & $| 6 &__| Responsible Executor is either National Oilwell Varco or a 6 1 3 ‘manufacturer of equipment. aes 2 Description of punches A: wh NA [a ‘TC Nusiber? STSO0G60-DES Printed REV TT www.nov.com © wariona. onweut varco Latest REV: T Printed By: teyukd Document number printed On: 29¥64968018:53:13 GMT10800 Revision + Page 19020 Equipment Type: Page’ .t= Of: i Serial i Configuration #: Punch List ie page oe copied if more pages Notes: “a” Punch list item must be completed prior to shipping Cleared by 8 2 |B" Unit may ship without correction of discrepancy.| 8 g ill § Punch list item to be addressed at a later date as| iS gle 5 required. 8 3 a 3 € & 5 o | Responsible Executor is either National Oilwell Varco or & 3 z/ 3 ‘manufacturer of equipment. a] § Description of punches 2. Name: Sign: AF nt Left Date: www.nov.com TC Nuiabert STSOVGOO-DES rte REET ‘© warionat onweLt varco Latest REV: T Printed By: teyukl Document number Printed On: O1S99580 18:53:13 GMT+0800 Revision Tg Page 20 of 20 14.COMMENTS This page shall not be utilized for punch list items. Comments and information recorded on this page will not delay the manufacturing process or the shipment of the unit. woncnow.com ‘© waviowa. onweLt varco ‘TC Nuimber: STSO0660-DES Printed REV? T Latest REV: T

You might also like