You are on page 1of 18
&-%y higher education s ae & training SZ, \\ i ) Department: UCODY) Higher Education and Training UWF REPUBLIC OF SOUTH AFRICA S T150(E)(N13)T re NOVEMBER EXAMINATIOI NATIONAL CERTIFICATE. BUILDING AND STRUCTURAL CONSTRUCTION N5 (8060015) » 13 Novémber 2013 (x-Paper) 09:00-13:00 i A Candidate’. will require drawing paper. Drawing instruments may be used. ‘This question paper consists of @ pages, 1 formula chest and SABS 82 Shape Codes. ‘Copyriht served Plesse tum over 060015) 2 Tasoce|3397 DEPARTMENT OF HIGHER EDUCATION AND TRAINING REPUBLIC OF SOUTH AFRICA NATIONAL CERTIFICATE BUILDING AND STRUCTURAL CONSTRUCTION NS TIME: 4 HOURS MARKS: 100) eee INSTRUCTIONS AND INFORMATION 1 2. 3. ‘Answer ALL the questions, eS Read ALL the questions carefull. \ Number the arawers according to the numbering aystemiged is question paper. Drawings must be done according tothe latent balding epullions. Srawings must be ‘uly dimensioned), abeted and steel coled where required. Lbetng must be done hore ad in pit, Use both sides ofthe deawitlg paper Wite neatly and legibly Copyright sesenes Please turn ever 2060015) * “rasoeMNT QUESTION 1: BOLT CONNECTION FIGURE 1 below, shows two tle bare connected by means of grade 4.6 bolts and two connector plates. FIGURE 4 » Celeulate the folowing: ey Ds, 4.1 The tearing stiess inthe tie bars, the 12mm bol de tough 14 mm holes (Tie bars are 122 x 6 mm and force in te bare is 350, ® 1.2 ‘The diametre ofthe bolt, ifthe load is 83 kN'wnd'the shear stress is 100MPa_ (4) 412. The maximum ad thatthe bs an sfely wot he bok se & 48, Tha re maumur beuog even 280 a {te bars ee 1258 mn aorta ls are 4) « rr copy aserves less tum over (2060015) + Tasoeyiayr QUESTION 2: FRAMEWORK FIGURE 2 below, shows a loaded frame structure Draw this frame accurately to scale 2.6m = 1 m and determine the following: ® GNC ou c 8 e)r \o| a a= a RL FIGURE2= 3,0), 21 Theforces of the reactions at RLand R= @ 22 The sizeof the frees in each ménber ad dstgush between tension an compression stress (13) Tabuitemne esuts ae fofows: =) EMBER | MAGNITUDE [TIE or STRUT] AE. r AP AR, BE CG. DE Fr Fa. GH 0 ‘onyant resend Please tum over (2080018) * sore 197 QUESTION 2: SECTION MODULUS FIGURE 8 below, shows the profile of @ cross section of a steel shat. The dimensions are given in centimeties. Calculate the folowing: 3.4 The poston the retire as (NA) from AB 42 Themomelt ote ofthe pofie abou the neal ais NA 2 _Thepole modulus about the neural ad (N-A) 3.4. Themaxmuin bending moment, ifthe allowable bending stress is 165 MP @ ® @ @ (10), Ccopyiaht reserves Planes tun ove (soo018) +. Tasoqeyi9}7 QUESTION 4 FIGURE 4 below, shows a profil of a reinforced concrete stair case, which is one ‘metre wide. Copy this profile, nt to scale, in the ANSWER BOOK, (not onthe drawing sheet) Fleune 44 Ate tloving set viene ot cote 411 Main reinforcemgat with: steel code 8Y1601-200 and with shepe code 44, a 44.2. Sstondary rejntrcoment, with steel code 14Y1202-200 and with ‘shape code'35 413° Carigreston reverent, wh sel code 108-20 an wth \, shape code 47 ° 42, Draw up @ Bending schedule for FIVE similar reinforced concrete siaircases. 1 2 oe siete z 3 [Member [Bar [Type] No of [Nom | Total] Teng - ‘mark |and | members | each | number'| ofeach | Shape size bar L [ I (18) hel Copyrantraseves Pleese tum over (9060015) ‘iso(eyt9yt QUESTION 5 ‘A concrete slab fs resting on a round conerste column. The column is 1 800 nim from the righthand edge of the slab, which forms a balcony. A 220 mm face-brick wall is Dull atthe edge ofthe cantilever slab, 15 mm from the edge to form a pint. Draw to scale 1 10 vertical longitudinal cross section through part of the sab, the 4500 mm long cantilever slab, the column and the double-face brick wall, Show at feast 500 rom ofthe slab on the opposite side of the column and cantilever. ~ °-, Use and include the fllowing details and label the drawing correctly. Concrete slab: 300 mm thio, with 6Y16, main reinforcement peF metiéand GY10 shear reinforcement per metre, and R12: compression reinforcement per mete, with 10 mm mid steel binders, at200 mm Centre distance, The frst binder starts a the column © Cantilever slab: 300 mm thick, with 6Y6, tension 'Teinfateernent per mete, BY 16 Shear reinforcing per mate and ER 1Q;coripression relforcement permet wih 10 mn binders at460 meaite distance © Column: DDiametar of 400 mm with 6Y 1B: Ibhgtudinal see! reinforcement fSnd'B tim round ilgateel helea Binders st 200° mm contre Sela Draw below the’volumn & horizontal sectional view, to seale 1: 5, te clan and abel teow © Floor of- 300 x30 mit ceramic ies fixed with the cement fining oh ® ‘Show at least 500 mm of ite concrete column at the bottom of the slab. nee pay Coppa reserved Piesse tun over (2080015) Tisoqes937 QUESTION 6 ‘An |-Section parallel flange steel stanchion with base plate is prepared for a steel structure. The stanchion and the base plate ere strengthened by means of two flange Plates which are welded tothe flange of the stanchion and the base plate Draw to seale 1: 5, an isometric view of the stanchion with the strengthenhg sections to show the construction details clearly. Use the following specications: Base plate: 600 x 600 x 25 mm with 22 mm holes dited'25\mm fom the eriges al the comore y Stanchion: 200 178174,8 kgm Flange plates: 400%210% 10 mm a Welding ‘The fange plates ar fltweldedalfaroud i the factory, but the specications: base plate is welded all-around on the constriction site Sho teas 250 rm fhe tarcion abe ne ut psa, Labet the drain ed net th wl PA Bo 1a ‘QUESTION 7 3 Explain the meaning ofthe sige! sfape in the SABS Shape Codes, of number 86, by answering the folowing questions: 7.1 Whatigould be the nanie of he steel shape? “ 7.2 What dos ne eter ‘8 represent? ” 7.3. ~ Wat does te letter‘ represent? ” 7.4 What does letter ‘C' represent? a ro TOTAL: 100 CCopyranresewes 000015) ‘THSOKENONSTT FORMULA SHEET ‘Any applicable formula may also be used. w pus * , eee |e ew a ee aa owe TA. se. fl TEs eae Feo, 2 : patent HESS : LN, | nae oe eesdcamty AED Copyright reserved (e0soo's) “THsoceyN7 SABS 82 SHAPE CODES C: Cconsrantrasenes higher education mle & training Department: Higher Education and Training REPUBLIC OF SOUTH AFRICA MARKING GUIDELINE NATIONAL CERTIFICATE NOVEMBER EXAMINATION BUILDING AND STRUCTURAL CONSTRUCTION NS. 13 November 2013 ‘This marking guideline consists of 8 pages. Copitt eservad Please tum over MAFIING GUIDELINE 2 TrsoCeyINIgIT BUILDING AND STRUCTURAL CONSTRUCTION NS. QUESTION 1 11 Tearing stress Foxes Area Bxy-naxy Srniro 350x108 (22x6)-304 x8) 723,167 MPa 3 12 Shear stress Load BxnxnxOTe ot AxLoad 4x 95 x10! Pux2xnem 100x2x3xm aos 13,490 Thus 14mm_ Bots 4 1.3 Cushing stress Load axaxt = 250x3x16x6 = 720008N = 72K @ my Copyrigt reserved Pleese tn over MARKING GUIDELINE 2 THSOKEYNISTT BUILDING ANO STRUCTURAL CONSTRUCTION NS QUESTION 20 Frame Diagram Scale 2om=1m 60 KN 30KN Scale 2em=tm Cepyigniveserves Please turn over MARKING GUIDELINE 4 THso(eyN3T BUILDING AND STRUCTURAL CONSTRUCTION NS Force Diagram Scale 2om=T0kN B n Cy 50 Fee i 40 a % (10) 40 c 8 568 30 D (20) CCopyight reserved Please tum over MARKING GUIDELINE * BUILDING AND STRUCTURAL CONSTRUCTION NS TrSO(EYNTOTT ‘QUESTION 3 ‘area RxY a Distio | Axa _ NA(d) Tw rg Pa] + | 6 | 1008 [12 | seote | 2607 | +4anare a aE Oo]. 48 5 -240 2 144 3,507, - 168,336, 3 a A re | sre [36 | s072 | 7400 | + e212 iO 16 804248 | 201,062 | 7,498 - 376,636 Evs07 78 ea 505616 34 ¥ Y 183,735 Y 8,507_mm Ww ae @ 32 oe (INA + Ad? ) 242,998 + 505,616 = 2848,554 cm* box, (2848,554 cm* WW (4) 33 2 =28sa.ss4 507 Zz 334,848 om? WV @ 34 BMomax 1S5MPa_x 334,848 cm? = S1901,4776 KNgm 11 (2) {10} Copyright reserved Plesse tun ver MARKING GUIDELINE TASOKEYNTOTT & BUILDING AND STRUCTURAL CONSTRUCTION NS ‘QUESTION 4 y ° 1 2 3 ss came 8 Member [Bar [Type [Noof [Nols | Total Length |mark [and | members |each | number | of each | Shape size - bar z 5 08 mp = w Tm | =| 7 7 7 Fr] (16) . 19) ‘Copyright served Please tum over MARKING GUIDELINE a THsOCE NSIT [BUILDING AND STRUCTURAL CONSTRUCTION NS ‘QUESTIONS 2 Cantilever Slab Face Brick 220mm 10-150 ofe Binders 7500 200 ete Tension SF 6VI6 “Compression SIRRIO onoiudinal Sm 66 Column 400 6 (22) Copyright reserved 08 tn over (MARKING GUIDELINE * ‘BUILDING AND STRUCTURAL CONSTRUCTION NS THsOKE NIST QUESTIONS ‘Siancbion Filet welded all-around in the factory ‘Gusset Pisies ‘0021010 mm Vs ‘O22 mm holes, 25 mm rom the edges tthe comers. 6 z se Plat, 600x600%20 Fillet welded all- ‘around on the: ‘construction Tay ‘QUESTION 7 7.1 Helical binder o 72 Diameter o 78 Pitch distance a 7.4 Totallength of the spiral a ia TOTAL: 100 (copyiit esemea

You might also like