KEPOLISIAN NEGARA REPUBLIK INDONESIA

DAERAH SUMATERA SELATAN


PEKERJAAN

PENGEMBANGAN GEDUNG MAPOLDA


SUMATERA SELATAN (TAHAP II)
TAHUN ANGGARAN 2021

CATATAN

PENUTUP ATAP UPVC


+RANGKA BAJA IWF
PENUTUP ATAP UPVC
+RANGKA BAJA IWF
ATAP DAK
ATAP DAK
FL +36.20
ATAP DAK
FL +36.20
FL +36.20

RANGKA HOLLOW LT. DAK / R. MESIN LIFT


LT. DAK
FL +32.00
R.MESIN LIFT
FL +32.00
R. MESIN LIFT
FL +33.00
FIN. ALUMUNIUM PANEL FL +33.00

LT. 07
1

STAGE
2

FL +28.00
3
4

LANTAI 07 AULA UTAMA


LIFT LIFT LIFT LIFT LIFT LIFT
5

LOBBY R. TRANSIT
6

FL +28.00 FL +28.00 FL +28.00 FL +28.00

CURTAIN WALL, KACA PANASAP TIPE


DARK BLUE TEMPERED 8mm,
RANGKA ALUMUNIUM BACK MULLION

1
LT. 06
2

FL +24.00
3
4

LIFT LIFT LIFT LIFT LIFT LIFT

LANTAI 06
5

SELASAR SELASAR LANTAI 06 SELASAR R. RAPAT


6

FL +24.00 FL +24.00 FL +24.00 FL +24.00 FL +24.00 FL +24.00

CURTAIN WALL, KACA PANASAP TIPE


DARK BLUE TEMPERED 8mm, 1
PENUTUP ATAP SELULOSA BITUMEN LT. 05
2

FL +20.00
3
4

LANTAI 05
5

SELASAR SELASAR LANTAI 05 SELASAR R. RAPAT


6

LIFT LIFT LIFT LIFT LIFT LIFT

RANGKA ALUMUNIUM BACK MULLION +RANGKA BAJA IWF


FL +20.00 FL +20.00 FL +20.00 FL +20.00 FL +20.00 FL +20.00 MENYETUJUI

PEJABAT PEMBUAT KOMITMEN

1
LT. 04
2

FL +16.00
3
4

LANTAI 04
5

SELASAR SELASAR LANTAI 04 SELASAR R. RAPAT


6

LIFT LIFT LIFT LIFT LIFT LIFT

FL +16.00 FL +16.00 FL +16.00 FL +16.00 FL +16.00 FL +16.00

PENUTUP ATAP SELULOSA BITUMEN


+RANGKA BAJA IWF
DWI CITRA AKBAR, ST, SIK, MIK
KOMPOL NRP 80071429
1
LT. 03
2

FL +12.00
3
4

LANTAI 03 R. RAPAT
LIFT LIFT LIFT LIFT LIFT LIFT
5

SELASAR SELASAR SELASAR


6

FL +12.00 FL +12.00 FL +12.00 FL +12.00 FL +12.00 TIM TEKNIS MAPOLDA SUMSEL

1
LT. 02
2

FL +8.00
3
4

LIFT LIFT LIFT LIFT LIFT LIFT

LANTAI 02
5

SELASAR SELASAR R. RAPAT


6

FL +8.00 FL +8.00 FL +8.00 FL +8.00

RM. BAMBANG SURYANTO, ST.


PENATA TK.I/197101132002121003
142

LT. 01 TIM PENGELOLA TEKNIS KEGIATAN


1

DINAS PERKIM PROV. SUMSEL


2

FL +4.00
3
4

LIFT LIFT LIFT LIFT LIFT LIFT

LANTAI 01
5

SELASAR SELASAR SELASAR LOBBY UTAMA


6

TERAS
FL +4.00 FL +4.00 FL +4.00 FL +4.00 FL +4.00 +3.95

DROP OFF
FL +2.04

1
LT. DASAR
2

FL ± 0.00
3
4

LT. DASAR
5

LOBBY LIFT LOBBY LIFT R. TRANSIT


6

LIFT LIFT LIFT LIFT LIFT LIFT

PARKIR PARKIR
FL ±0.00 FL ±0.00 FL -0.15 FL -0.15 FL ±0.00 FL ±0.00
MTA JALAN
Dr.KM. AMINUDDIN, ST. MT
FL -1.25 NIP. 197203141999031006

DIPERIKSA / MENYETUJUI
KONSULTAN MANAJEMEN KONSTRUKSI

PT. PARAHYANGAN
PUTRA CEMERLANG

PT. PARAHYANGAN PUTRA CEMERLANG

ISKANDAR, ST., MT.,IAI.


TEAM LEADER

POTONGAN 02 KONTRAKTOR

PT.SURYA MANUNGGAL WISESA-PT.FEBERCO (KSO)


Jl.Cinde Welan RT.010 RW. 003 Kelurahan 24 Ilir Bukit Kecil,
Kota Palembang, Provinsi Sumatera Selatan

SIS RIYADI, ST.


PROJECT MANAGER

AS BUILT DRAWING
Judul Gambar :

POTONGAN - 02

SKALA JUMLAH NOMOR


SIMBOL
LEMBAR GAMBAR

1:150 ARS ABD-ARS-02-06

REFERENSI GAMBAR : ARS-02-06