You are on page 1of 43
Page tof 43 TEST REPORT REPORT No. (99/2005) CLIENT: EGYTECH Cable Co. (EL-SEWEDY), Report Date: May. 2005 Place - Laboratories of Extra High Voltage Research Center. - Industrial of EGYTECH Cable Co. (for bending test only) Requirements: - Type tests according to IEC 60840. Standard Specification: = International standard IEC 60840 “ Power cables with extruded insulation and their accessories for rated voltages above 30 kV (Ua= 36 k¥) up to 150 kV (Um = 170 kV). Description of the Specimen : - 38/66 kV Power cable with the following specification: “Manufacturer IL-SEWEDY CABLES (EGC), Cairo, Egypt. Type 8/66 kV- CU/XLPE/ Overlapped copper tape + Copper wire screen /HDPE /1 x 1600 mm? Year of Manufacture No. of Phases Insulation Conductor Material Conductor cross-section Screening Material ‘opper Sheath Material HDPE (ST) Sheath Color Black Rated Frequency 50 Hz Internal Code TO-AC~05~02—02- 02. C-Fua3 B- Ae HaAled tly LABORATORIES OF PYRAMID EXTRA HIGH VOLTAGE RESEARCH CENTER kM 27 Cairo- Alex. Desert Road Report Bo, (39/2005) Page2 of 3 = Description of the Equipmeni - High voltage reactor ~ 400 kV - 5000 KWA ~ 50 Hz— Type: (RSK) ~ Serial No. 204322/99. PD detector — Type: (TES7). Tan 5 measurement device — Type 254/32 1/02 Serial No. 144281. Standard capacitor — Type NK400 Serial No. 434321. Impulse voltage generator 800 kV — 20 kI - Type SGSA 800-20. Air oven up to 300 °C — Type BINDER - Serial No, 02-32772 Universal testing machine up to 25 KN - Type TABLE TOP ~ Model APEX-T5000 Serial No. 2095. + Test Samples: ~ Test sample was chosen under the responsibility of the client. = Tests: 1- Electrical Type Tests on Completed Cable: 1.1 Check of insulation thickness of cable before electrical type tests 1.2 Bending test on the cable followed by partial discharge test. 1.3 Tan Smeasurement. 14 Heating cycle voltage test followed by partial discharge test. 1.5 Impulse voltage test followed by a power frequency voltage test. 1.6 Resistivity of semi-conducting screens. Non-Electrical T Tests on Cable Componet ind on Compl lez 2.1 Check of cable construction. 2.2 Tests for determining the mechanical properties of insulation before and after ageing 2.3 Tests for determining the mechanical properties of non-metallic sheaths before and after agi 2.5 Hot set test for XLPE insulation 3 Verification of Cable Construction: ‘ie | = Test Method and Results: 1- Electrical Type Tests on Completed Cable: LL. Check of insulation thickness before electrical type tests: - Prior to the electrical type tests the insulation thickness was measured in accordance with clause 11.3.1 of IEC 60480 (1999), - The measured value of the insulation thickness is shown in the following table “Average thickets Specified thickness en The average thickness of the insulation doesn’t exceed the specified value by more than 5% 1.2. Bending test on the cable followed by partial discharge test: 1.2.1 Bending test: - The test cable was subjected to a bending test at ambient temperature in accordance with clause 11.3.4 of IEC 60840 (1999). The test cable was bent around a test cylinder. The diameter of the cylinder was 4200 mm. The test consisted of three cycles. The test object was bent for one complete turn, It was then unwound. The process repeated, except that the bending of the sample was in the reverse direction. Outer diameter | Diameter of ee Hub diameter of ofeableD | conductor d : drum (am) (mm) Se (mm) (rum) 110 52.7 <4270 __ 4200 1.2.2 Partial discharge test: ~ The test cable was subjected to’a paid discharge test in accordance with clause 11.3.5 of IEC 60840 (1999). The test voltage was raised sradually to and held at 1.5 Ue 10 s and then slowly reduced to Page 4 of 33 - The measured value of the partial discharge level is shown in the following, table: S Measured partial Discharge level (PC) = The Figure of the PD- Scope is illustrated in page (11) of this report. ~The cable passed the test. 1.3, Tam 5 measurement: - Another sample test cable was subjected to a tand measurement in accordance with clause 11.3.6 of IEC 60840 (1999). The test object was heated by passing a current through the conductor until it reached a steady temperature, which was 96 °C. The tan & was measured at a power frequency voltage of Up at the temperature specified above. - The measured value of tan 5 level is shown in the following table ‘Applied voltage | Maximum allowable value tan 5 (x 10") (ky) for tan 5 (x 10") _[Measured value] 10 7.16 rs | 38 - The cable passed the test. 1.4. Heating Cycle Voltage Test followed by partial discharge test: 1.4.1 Heating Cycle Voltage Test: - The test cable was subjected to a heating cycle voltage test in accordance with clause 11.3.7 of IEC 60840 (1999). The test object was heated by passing a current through the conductor until it reached a steady temperature, which was 96 °C. The heating was applied for 8h. The conductor temperature was maintained within the stated temperature limits for.2 h of each heating period. This was followed by 16 h of natural cooling. The cycle of heating and cooling was carried out 20 times, During the whole of the test period a voltage of 2 U, was applied to the test object. = The result of the heating cycle voltage test is shown in the following table. | Ged eh oe LABORATORIES OF PYRAMID EXTRA HIGH VOLTAGE RESEARCH CENTER kM 27 Cairo- Alex. Desert Road Report Mo. { 99/2005) Page Sof 43 Required Hestns ar] Cooling | Applica conductor i time voltage temperature heating at continuously (kV) co © @ i 95<1< 100 2 16 76 - The cable passed the test. tial disc! test: ‘After the last heat cycle, partial discharge was measured for the test cable at ambient temperature in accordance with clause 11.3.7 of IEC 60840 (1999). The measurement was carried out as mentioned above under item 1.2.2. ‘The measured value of the partial discharge level is shown in the following table: Max. partial | Measured partial Applied voltage | Duration | gischarge level | Discharge level (kv) © __@0) 0) <5 <14 66.5 10 37 i - The Figure of the PD- Scope is illustrated in page (12) of this report. - The cable passed the test 1.5. Impulse voltage test followed by a power frequency voltage test: 1.5.1 Impulse Voltage Test: - The test cable was subjected to a lightning impulse voltage withstand test in accordance with clause 11.3.8 of TEC 60840 (1999). The test was rmed on the sample at a conductor temperature of 96 °C. The cable {ithstood 10 positive and 10 negative voltage impulses with crest value of 1.5.2 Power Frequency Voltage Test: ~ After the impulse voltage test, the test cable was subjected to power frequency voltage test of 2.5U, for 15 min, in accordance with clause 11.3.8 of IEC 60840 (1999). ~ The result of the power frequency voltage test is shown in the following table ‘Applied voltage ‘Frequency | Duration Observations (kV) (Hz) (min) 95 50 15 No breakdown = The cable passed the test. 1.6. Resistivity of semi-conducting screen: - The measurement of the resistivity of the semi-conducting screens were carried out in accordance with clause 11.3.9 of IEC 60840 (1999). The resistivity of extruded semi-conducting screens applied over the conductor and over the insulation was determined by measurements on test pieces taken from the core of a sample of cable as manufactured and a sample of cable which has been subjected to the ageing treatment to test the compatibility of component materials specified in TEC 60840 (1999). The measurements were made at a temperature of 90 °C The results of Resistivity of semi-conducting screens are shown in the following, table ‘Measured! Item Requirement | yer nined Conductor sereen |- without ageing s 1.25 er ageing < 1.08 Insulation screen = Withowt ageing < 031 = after ageing < O19 The é cable passed the test. Buys 9A LABORATORIES OF PYRABID EXTRA HIGH VOLTAGE RESEARCH CENTER kM 27 Gaito- Alex. Desert Road Report No. { 99/2005) Page 7 of 43 2+ Non-Electrical Type Tests on Cable Components and on Completed Cable: 2.1. Check of Cable Construt The examination of the conductor and measurements of insulation and sheath thickness was carried out in accordance with clause 11.4.1 of IEC 60840 (1999) ‘The results of examination of the conductor and measurements are shown in the following table: i Measured/ tem Requirement | wurst ‘Thickness of insulation = minimum = (tenax— tonin)! tae Thickness of non-metallic sheath average - minimum UL + The cable passed the check. 2.2. Tests for determining the mechanical properties of insulation before and after ageing: The mechanical properties of insulation before and after ageing were determined in accordance with clause 11.4.2 of IEC 60840 (1999). ‘The results of the mechanical properties of insulation before and after ageing are shown in the following table. Without ageing, 3 ‘Measured! Item Requirement | Gotermined tensile strength -clongation after ageing in air oyen -Min. tensile strength -Max. variation with samples without ageing -Min. elongation *Max. variation with samples without ageing “The results of insulation before ageing showed in attached figures in pages (14, 15, 16, 17, 18) of this report. ‘The results of insulation after ageing are showed in attached figures in pages (19, 20, 21, 22, 23 ) of this report. ‘The cable passed the test LABORATORIES OF PYRABID EXTRA HIGH VOLTAGE RESEARCH CENTER Kil 27 Cairo: Alex. Desert Road Report No. (99/2005) Page 8 of 43 2.3. Tests for determining the mechanical properties of non-metallic_sheaths before and after ageing : ~The mechanical properties of the outer sheath before and after ageing were determined in accordance with clause 11.4.3 of IEC 60840 (1999). - The results of the mechanical properties of non-metallic sheaths before and after ageing are shown in the following table: alot Item Unit | Requirement Measured! determined Without ageing ~ensile strength Nien? = 100 213 elongation 855 after ageing . -Min. tensile strength ° 20 “Max. variation with samples without ageing 252 -elongation 825 “Max. variation with samples without ageing “35 The resulls of the outer sheath before ageing are showed in attached figures in pages (24, 25, 26, 27, 28) of this report The results of the outer sheath after ageing are showed in attached figures in pages (29, 30, 31, 32, 33) of this report ‘The cable passed the test. ~ Ageing tests on pieces of completed cable were carried out in accordance with clause 11.4.4 of TEC 60840 (1999) - The results of the mechanical properties of completed cable are shown in the following table Item Tnsulation -Min. tensile strength -Max. variation with samples without ageing -Min. clongation -Max. variation with samples without ageing ens strength i) variation with samples without aging “slongation -variation with samples without ageing. ‘The results of insulation after ageing showed in attached figures 35, 36, 37, 38) of this report fot. LABORATORIES OF PYRAMID EXTRA HIGH VOLTAGE RESEARCH CENTER kM 27 Galro- Alex. Desert Road Report Bo. ( 99/2005) Page 9 of 33 ~The results of the outer sheath after ageing showed in attached figures in pages (39, 40, 41, 42, 43) of this report, = The cable passed the test. Hot set test for XLPE insulation: - A hot set test for the XLPE insulation was carried out in accordance with clause 11.4.10 of TEC 60840 (1999). = The results of the hot set test for following table. the XLPE insulation are shown in the Ttem Unit Requirement Measured elongation under load -permanent elongation % % <175 S15 125 2.5 - The cable passed the test 3- Construction: ‘The construction of the cable was checked against the manufacturer specification. The results are shown in the following table: Items. Determination = Marking of the cable - Color of the outer sheath Cable construction diameter of the cable (mm) ELSEWEDY CABLES (EGC) 1600 mm"| 66kV/CU/XLPE/ / HDPE, Black 305 copper wires (61 wires = 5 segment), Semi-conducting water blocking tape Extruded semi-conducting material XLPE insulation. Estruded semi-conducting material Semi-conducting water blocking tape. Overlapped copper tape + Copper wire screen. Non-conductive water blocking tape. Aluminum foil tape. HDPE. ST; over sheath. 110 (average) 52.7 fou LABORATORIES OF PYRARID EXTRA WIGH VOLTAGE RESEARCH CENTER Page 10 0f 43 = Conclusion : = The 38/66 KV/CU/XLPE/ Overlapped copper tape + Copper wire screen /HDPE / 1 1600 mm? manufactured by EGYTECH Cables Co fulfilled the requirements of tests mentioned in this report according to TIEC (60840). = Notes: Tests were carried out on the above specimen only without any responsibility concerning other untested specimens, The tests were carried out without any obligation on Egyptian Electricity Holding Company. This test report shall not be reproduced except in full, without written approval of EHWRC. = TEST ENGINEERS: EFomgy B-aveft Hand Be|'| Frbos GENERAL MANGER kM 27 Cairo- Alex. Desert Road Report Ho. (99/2005) Page 11 of 8 Measurement Results of Partial Discharge for Power Cable 38/66 kV — 1 x 1600 mm? (EGYTECH Cables) ~ PD-Range: ‘Noise Suppression: © Triggering: — = Case Before heating cycle. = Ambient temp. : 13 °C. = Calibration at : 10 PC. = Test Engineers : iy abe P A u Case e ‘Ambient temp. : 27 °C. \ Calibration at ; 10 PC. LABORATORIES OF PYRAMID EXTRA HIGH VOLTAGE RESEARCH CENTER Peeinees Measurement Results of Partial Discharge for Power Cable 38/66 kV — 1 x 1600 mm” (EGY TECH Cables) Dale: 19.02.05 | Timo: 11:03 as After heating cycle ( conductor at-dmbient temp.) ‘Test Engineers : J wo Ads NE PYRAMID EXTRA HIGH VOLTAGE RESEARCH CENTER lightning Impulse test results 38/66 KV power cable copper conductor 481600 mm* XLPE insulation. HDPE sheath TPAC 13) ee a Test voltage 325 kV (-ve) ‘Test voltage 325 kV (+ve) Pic No. (312) Pic No. (311) Ambient Condition : T=32°C p=996 MPE Atmospheric Correction Factors: (IC 60060-3) Air density correction Factor Ka =N/A Humidity correction Factor Ky= N/A Atmospheric Correction Factor K= KysKn= N/A. ‘Test voltage T.V value before correction =325 kv TV value afler correction = 325 kv ‘Test Voltage Toleranees : Wave Time Tolerances peak .. = 3% ront Time. 2H 30% Overshoot =+5% - to half value = + 20% 4 } Test engineers Test Tensile Test Procedure Tensile test t Date 05-08-2005 Test Time 22:45:33 BM Elapse 00:0 ————Stress us Position’ 929433] 18-2003] eH @ 28.0 40.0 68.8 89.0 108.0 120.0 140.9 160.0 180.8 200.0 Con) Chang ow sc iles 5 S jatcox A} LABORATORIES OF PYRAMID EXTRA HIGH VOLTAGE RESEARCH CENTER kl 27 Cairo- Alex. Desert Road Report Mo. (39/2005) : Page 15 of 3 Test Tengile Test byocedure Tensile test Test Date 05-08-20 Tested By Test Time 2 Test Counter Peak Load Init Punch Len 20.900 Stress us Position 90+ Y D109 16.8 32.0 48.8 64.0 €8.8 96.0 112.6 128.0 144.0 160.0 Com) Pacey H- Abd Bes potas Test Tensile Test Procedure Tensile test 05-08-2005 12:55:53 PM 00:00:44 19.6770 MPa 500.00 Tested By E.H.V.R.C £ Counter 00900435 Area 4.94 Peak Load 97 Indt Punch Len 20.000 a Ta 22.8 44.0 66.8 92.8 110.0 192.0 154.0 176.0 198.0 220.9 Com) Erg H. Abd A. ‘ pot. LABORATORIES OF PYRAMID EXTRA HIGH VOLTAGE RESEARCH CENTER tt Tensile Test Procedure Tensile West Date Test Time 00000436 Elapsed Time 5.1800 mm? Tensile Strgth 20.2430 MPa Elor 540.00 % 22.0 96.8 120.0 144.8 168.8 192.0 216.0 240.0 (am) Test Tensile Test Procedure Tensile test Test Date 05-08-2005 Tested By Test Time 01:00:39 PM Test Counter Elapsed Time 00:00:46 Area Tensile Strgth 19.5240 MPa Peak Load Total Elong 510.00 Init Punch Len tress us Position ashe “2005| | 66.8 08.8 110.0 192.8 154.8 176.8 198.9 228.0 (nn) A.A bad Ce Test byocedure Tensil 05-08-2005 . E.H.V.R.C 9 PM ter 00000438 4.7280 mm? Je Strgth 20.1550 MPa Load 95 N 1 Blong Punck Len 20.000 mn — Stress us Position 24.00 7 obeasase| 0328828688 oath aa. | 22.8 44.0 66.8 90.8 110.0 152.0 154.0 176.0 198.8 220.0 (an) erg M. Abd Ir, 4 peGae, L Tensile Test Procedure Tensile test Test Date 05-98-2005 < Test Time 01:57:31 PM © 00000438 Elapsed Time 00:00:53 6.3000 mm? Tensile strgth 24.5060 MPa Peak Load tal Blong 600.00 % Init Punch Len $$ ———stress us Positior 28 20 (@ 79.8 104.9 190.8 136.0 182.0 203.0 234.0 268.0 (om) Abe Boy» LABORATORIES OF PYRABHD EXTRA HIGH VOLTAGE RESEARCH CENTER kit 27 Cairo. Alox. Desert Road ‘Report Mo. (39/2005) Page21 of 3 Tensile Tost a erocedure Tensile test 95-08-2005 E.H.V.R.C 92:00:51 PM ooa00440 00:00:48 rt 4.6460 mm? 21.8760 MPa L 102 N S n -000 mm ebooosae| Peete ‘gers eH .® 154.0 176.0 198.8 220.0 t Tensile Tes! Precedure Tensil e test Test Date 08-2005 Tested By E.H.V.R.C Test Time Test Counter 0000044) Elapsed Time Area 4.6800 mm? Peak Load 100 Total Blong : Init Punch Len 20.000 min jtress us Position wpeeeaas as "38-2005 — e@.@ 110.0 192.@ 154.8 176.0 190.0 220.0 (om) Tensile Tes: cedure Tensile test Di Test Time Elapsed Time Tensile Strgth © 21.5350 MPa Total Blong Tested By Test Counter Area E.H.V.R 00000442 Peak Load Init Punch Len 72.8 96.8 420.9 144.9 168.9 192.8 2is.e 240.0 (am) 4.7800 103 20.900 mm Ten! Test dure Tensile test 05-09-2005 10:46:56 AM 90:01:13 21.4040 MPa 875.00 & —<—<$<$___———stress us Position: 24.00 Tested By E.H.V.R.C Test Area Peak Init Counter 00000451 5.6600 Load 121 Punch Len 20.000 68 T aeeeeass 95209-2005 ~~ | est Tensile Test procedure Tensile test 09-2005 21 00:01:27 Tensile Strgt! 21.7790 Total Elong 875.00 Punch Len stress: us Position—$___—_—_—_—_— T epaecase 25799 -2003| LABORATORIES OF PYRAMID EXTRA HIGH VOLTAGE RESEARCH CENTER kM 27 Calro- Alex. Desert Road Report No. ( 99/2005) Page 26 of 43 t Tensile Test Procedure Tensile test Test Date 95-09-2005 10:53:32 AM Tensile Strg Total Blong _——$$_S S$ stress us Position 22.8 T 28.0 1 "8 80.8 100.8 120.8 140.0 160. (am) Ghwgy MB bo es ‘) Pie test Tensile Test Procedure Tensile test Test Date 95-09-2005 By Test Time 11:19:51 AM Counter 90000455 Hlapsed Time 00:00:58 8.0000 mm? Tensile Strgth 21.99200 MPa Load 176 N Total Eleng 300.00 & Punch Len 20.000 mn stress us Position . 1 56.8 84.8 112.8 140.8 160.8 196.0 224.0 252.8 200.0 (nn) MH Aled Lay Procedure Tensile te: Test Date 95-99-2005 Test Time 11:55:07 AM Elapsed Ti 00:01:19 Tensile Strgth Total Elong 22.1250 MPa Tested By Test Ares Peak Init ABORATORIES OF PYRAMID EXTRA HIGH VOLTAGE RESEARCH CENTER kM 27 Gairo- Alex. Desert Road Report Ho. ( 99/2005) Page 28 of 3 E.H.V.R.C 90000457 5.0400 mm? Counter Load 112 N Punch Ler 20.000 ma — 05-09-2005 Tested By n 58:56 AM Test counter Elapsed Time 00:00:56 Area le Strgth 20.2340 MPa Peak Load 1000.60 & Init Punch Len =_——$$—$_—————stress us Positio 24.00 T | 21.60 | 2.0 70.0 104.8 136.0 156.0 182.0 209.0 294.8 260.0 om) Ehury Md vod 5. fotos Test Tensi: Procedure 7 test Test Date 09-2005 Test Tim 2:02 2M Elapsed 00:00 Tensile strgth Total Elong 22.08 stress us Pos itor LABORATORIES OF PYRABIID EXTRA MIGH VOLTAGE RESEARCH CENTER kh 27 Calro- Alex. Desert Road Report Mo, ( 99/2005) Page 30 0f 43 Tested By Test Ares Peak Init 20,000 mm 19.80 T epgooass est 9 2005 } 96. 109.0 120.0 LABORATORIES OF PYRABID EXTRA HIGH VOLTAGE RESEARCH CENTER kM 27 Calro- Alex. Decert Road Report Mo, (99/2003) Page 31 of «3 Tensile Test Procedure Tens: Tested By E.H.V.R.C Test Counter 00000660 00:00:48 Area 6.2800 mm? 21.4560 MPa eak Load 850.00 % 135 N Tait Bune! hen 20.000 mem ————$~siress us Positio —————————] 24,00 7— - ; epooessal gs—b9—2005, 4 a 144.0 169.0 192.0 216.0 Counter Load Punch Len 72-0 104.0 120.8 156.8 182.9 202.0 234.0 260.0 (om) Tested By Test Cc Avea 20.2780 MPa 850.00 & $s tress us Positiow | annaca fa0s, I 60.8 88.0 100.8 120.9 149.0 160.8 130.8 200.0 (amd Ghrg HB rd thy aN Test Tensile Test Procedure Tensile test Test Date ted By E.H.W.R.C Test Time Test Counter 00000443 5.1200 mm? Elapsed T- 5 Area Tensile strg! Peak Load 106 N Total Blong Init Punch Len 000 mm 66.8 88.9 110.8 132.0 154.0 176.0 198.8 220.0 Gn) Test Tensile Test Procedure Tensile test -08-2005 02:14:44 PM 00:00:51 21.2080 MPa 550.00 & LABORATORIES OF PYRAMID EXTRA HIGH VOLTAGE RESEARCH CENTER kid 27 Gairo- Alex. Desert Road Report Ho. ( 99/2005) Page3S of Tested By E.H.V.R.C Test Counter 00000444 Area 7.3000 mm? Peak Load iss N Init Punch Len 000 mm epaegaaa| espe -20n3| 144.8 168.0 192.0 216.0 240.0 Test Tensile Test procedure Tensile test Test Date 0 Tested By Test Time Test Ce lapsed Time area Tensile Strath 20.0710 MPa Load Total Elong 525.00 $ Init Punch stress vis Position 22.00 ebooess| 95 802535) 19-88 Pr [8 22.0 44.0 66.8 89.0 110.0 132.0 154.8 176.8 193.0 220.0 (em) Test Tensile Test Procedure Tensile test Test Date 05-08-2005 Test Time 02:19:28 PM Elapsed Time 00:00:47 Tensile Strgth 18.50 -8080 tal Elong 35.00 Stress vs Posi tion—$—$—$—$—$—$—_—_ MPa e Tested By 2 Test Counter Area H.V-R.C oooggss6 +3200 Load 98 Punch Le: 20.000 egeaoaas| 5-80 2083| 44.0 66.8 Ghaugy 1 ee eo.8 440.8 192.0 154.8 176.0 198.8 220.0 Gon) H dod Jay ‘est Tensile Test Procedure Tensile test ‘est Time 1:40 PM lapsed Time Oo:00:49 19.1350 MPa Tensile strgth 540.00 Total Blong LABORATORIES OF PYRAMID EXTRA HIGH VOLTAGE RESEARCH CENTER kM 27 Calro- Alex. Desert Road Tested By Test Counter Area Peak Load Init Punch Len eae 2 96 120.8 144.6 169.0 192.0 216.0 240.0 Test 7 Procedure Tens. Test Date Test Time Elapsed Time LABORATORIES OF PYRABED EXTRA HIGH VOLTAGE RESEARCH CENTER kM 27 Calro- Alex. Desert Road Report No. ( 99/2005) Page 39 0f 43 Tested By Test Counter Area eak Load 1000.00 % nit Punch Len Position: Test Tensile Test Tensile test 05-09-2005 Tested By E.H.V.R.C 12:18:40 PM Counter 90000466 as 4.740 13.9490 MPa 950.00 & Init Punch Len ——— stress us Position Test T Procedure Tensi Date Tested By :21:19 PM Test Counter 00:01:27 Area -5760 MPa Peak Load 1025.00 unch Len stress us Position 28462) e589 2005) * fe Yest Tensile Test Procedure Tensile test Test Date 95-09-2005 Test Time 12:24:35 EM Elapsed Time 00:02:23 Tensile Strgth 22.4619 MPa Total Elong 875.00 % Init Punch Stress us Position Test Tensile Test Date Test Time Elapsed Time 12:31:03 PM Tensile strgth Total Elong 20.9670 MPa E.H.V.R.C o00g046s 5.7800 mm? 121 N 20.000 mm

You might also like