You are on page 1of 44
BUREAU Vanes) Marine Division. INSPECTIONS AT WORKS For the Classification of ships and Mobile Offshore Units Rule note NR 266 DNC ROI E 1994 Reprinted on July 1985 with correction of same clerical errors 17 bi Mace de Re La Deen 2.92400 Coube “Ta. 33(11 42915291 Telex 15376 BVDNC Fre 33 (42912898 onal Aden Caer 49207? Pas Ls Dee MARINE BRANCH GENERAL CONDITIONS Bureau Veritas 1 Table of contents = Chapter 1 - Sea going ships and mobile offshore units = Chapter 2 ~ Inland navigation vessels Bureau Veritas 1 Chapter 1 ~ Sea going ships and mobile offshore units Bureau Veritas ‘Chapter 1: Sea going ships and mobile offshore units, Summary Foreword Page: = Hl oo + Hull ftings + Fire bulkdeading + Firefighting ystems and fire detection systems I + Main 1.C. engines and their auxi * Main turbines, main boilers and tl + Auailiary machinery ~ + (Cargo handling and containment systems of liquefied gas carriers * Cargo handling and containment systems of oil/ product or chemical tankers — + Fire fighting ships — + Bectrieal equipment = + Specific equipment for mobile offshore units =~ Paetmommoom> = Installations covered by additonal notations a « Reftigerating plans: addtional notations: RMC, RMC-C, RMC-S, RMC-Y =~ - + Automation installations covered by addtional notations ~~ + Tnstallatons covered by addtional notations ALP, ALM, ALS — + Installations covered by additional notation ACA oc — + Installations covered by addtional notation F + Installations covered by additional notation PDY ~ + Installations covered by notations: COW, OIL, POL-ENG, OIL POL -CAR += Installations covered by additional notation 1G - ert gas namewozg Bureau Veritas Foreword The nsttions for canying ot inspection at works as detailed nthe following able ae, pic fll applicable to ships, offshore unis nd isllation ik wer ‘Bureau Verias special survey and intnded fr unescied servic, Ths booklet rele, a prnepe tthe requements of Busou Vets Rules, Incase of inconsistency iti these ner that preva 2. Bureau Vers resteves the ight © mci he instructions given inthe presen booklet, to formate new ons orto change thei appliaton in def tke ito acount the particulars fa pvenconsrcin, as well loa iemstnces, 3 Bureau Veritas wil easily ake into consideration any request mas by the manufactures to study with hem special applications, generally concerning mass produced meri In particular the proedure of approval for B-mode I sory in accordance wih NR 320 1 may be apled 44 The provisions given inthe present booklet ar ule applicable fo thip intended service incon waters orn selsed waters. However in view take nt account ‘he peculiar nate ofthese ships. some rections to these provisions may be bought on request a he bling yard andor of he shipownes, ‘As farasycht nd plese craftareconcemed, plese refer othe Rules forthe classification of yah. {6-The provision ofthe presen booklet lio cover the granting of paiculr service aotton suc suse gas car Ol tanker, Pout tanker, Chel tanker, Fe fighting shi. swells addtional notion suchas ALP, ALM.ALS, ACA, RMC.F, AUT, AUP-MS, AUT-OS, PORT, AUT-CC, 1G, PDY. COW, OIL POL-ENG. OIL POL-CARG, or NLS FOL 7 The inspections specified inthis document cover the items which are tobe considees fr the clasfiation of ships and mie oflshore ants. The particular conditions expressed by Nationa Autores, Owner, or Stipyats con lado sdditonl inspection tobe sated. n each case bythe concerned pasties IMPORTANT NOTE : Inthe column (a) "design index", the meaning of the figures 1,2 eis the following one in accordance with NR 320 RI 1 Type Approvals required 2 Design assessment ofthe product is required this one may be carried out at choice: + either for a specific unit. “either using the Type Approval procedure Design assessments ot required. INSPECTIONS AT WORKS Bureau Veritas HULL a Tnspeetions and tests Design Ressing w em nde | Materia ‘et ena © o}o}, oe Te © o 6 A | Steet plates, profiles and pipes | - x (@) approved see as per NE 160 1 [for main structure 4 [Aluminium alloy plates and x (@) approval as per approved program 2 | profiles 7 | ler products Tor welding ¥ (Oy Homorogation procedure appicable 3 |(welding consumables) (@) and (1) special procedures for approval 7 [Aton alloy rivet Tor x 4 | main structure and fxation of lumina alley supersructures fon steel ba 7 | Transition joras steel = T ¥ TOY TomoTogation procedure Te appicabe 5 | miniom alloy for fixation of superstructure on steel hull (2 and (1) special procedures for approval AA |Stem, stern post, rudder horn | 2 x Xrs 6 seeps and solid rudder pleces in forged or cast steel A | Cast steel shat-brackets 2 x Xrs 7 NihaeGoaan __¢o yhaidaiaieyomiet FG gemeng rer rer z Bureau Veritas INSPECTIONS AT WORKS HULL a Inspections and tests Design inspections | rspction | Checking | Running ~ em face | Mater] daring | ater | or ‘eet Remarks fabio competion tts o | wo Pe ye Oy o © ‘4 | Composite materia 8 | - Reinforcement fibers 1 (©) Homologation procedure is applicable Resins 1 Core materials for sandwiches | 1 (2) 3s per approval and survey programme defined in the NR3BG. INT joie enerapnasny)——€7 waybecoreduraracyaocanbens FY Sco acer pers TT pn dance naa pe Bureau Veritas INSPECTIONS AT WORKS HULL FITTINGS 3 Trp and ot Deen mpi] imo | ching | Reng . tm Tal | ssn” "tae | ose | a tate tne] Su o o fo Pore) 3s ] 1 |S ars 2 x |G) waked onto 1 [te pumpe x | xn (© pete 10ous lowing 1-261 2 Sic sobre onus Steuben x ]ox | oxe | ox (ele element rauy one set et seamen th x x 1) canbe repay a work ter, for rotary vane O oe tocng pau tenga tn ods x]ox |x] x (2) ive seme pot hang a Sern cans and |S- pipings Fos iin 0 we 8 3 |oaser 5 2 | rer stock, der sat pate coring ls x] x |x (2) if eet element > muerte X Joe | Xt | one (2 fovea oer eof weigh Bower anion Px mF Hono HSE RI 5 DC Men ing port nel <5 Ke 3 Jain abe anchor 7 > x = |e Toph pox Tripp i] Sakis ener shckinnnd PT] we 5 [ene a Taaamoea Bureau Veritas INSPECTIONS AT WORKS 4 HULL FITTINGS o Inspections and tests T ven Impcine cne | chan | amg . rn Mr |r in| gc | Cosa | Me aa | irene | 2 eae ae ae, + Ipc ae | . = - 1 iawn x x Woven : ye rare B |Side seutties and windows 2 x Xr x Ty examination following TSO standards Ae ns wind {9ST (ane scunles) oF ISU 3908 { | Stance Wo Phos BO Bey 1 [She dows SIRO th 2 |ateh oer >|xilx tx |x (oboe on ba for wai coe B | Watertight doors z ¥ Xr xr xi ¥ TA) & at the works: hydraulic test for 6 ‘passengers ships. | eo Bureau Veritas INSPECTIONS AT WORKS HULL FITTINGS 8 Inspections and tests Design Ronnie ~ tem fader | Materia ot Remarks © o | @ o © 'B [Rear landing ramp alo used as| 2 x | xr [ Xe x Xe | (I) including materials or hinges and 14 | weathertight door securitng systems (4) hose test on board B [Movable platforms for Rollon | 2 x | xr | xe x 15 | Rol off (notation PFA) and loose gear and ropes x x (4) as per Rules B [Hydraulic power station for 2 x 16|/handling B11 to BIS 1 pumps xhe 2-eectteal motors (0) see electrical equipment: chaper K 3: leibl pipes 1 Xhe hydraulic jcks-accumalatrs x Xh X | ()orwork cenificate 1B [Masts and king posts for cargo | 2 x | xe | xe (0) see01 and 02 17 |dersiehs, derriks posts, rane [columns welded tothe ship, structure 8 | Shrouds for B17 2 x (4) breaking test on specimen 18 RibiaieGran) ——€ ay hernionnteydooteet 7 RTGS a Fa i Bureau Veritas INSPECTIONS AT WORKS 6 HULL FITTINGS Ingpections and tests Design Inspections [Inspection | Checking | Running x tem finder | Mates "doring [ater | ee at Remarks abicton completion | tts o@ | o}e lhe o © © T Xr x | ©) concen only ship Tor which Ue rales require a loading calculator (a)-1-type approvals required - see NE 189 2 approval of operation manual (3) and (4) according to NI189 (5) following instalation on board with reference to the approved manual B | Ariculations and hydraule 7 xe | Xb X 20 eninders of spitting units 1) including charpy V test at OFC (mini hosing x | x | xe | xs (0 epaneciany . 2 covers x xe | xs (2) welds inspection {@ non destsctive testing 100% forcast ements nspechon complying with ‘hae for tobuar body. ston 104, pins of hinges an 1 ‘ (4) magnetic patch examination 100 % 5+ piston od pins of hinges and x x x Ae penefant check ofthe teads and eyes ‘Sjaten pan over ? diameters +: msin bolting x xe | Xs (1) 2 ofeach pe with aminimumof3 exes (4) 100% dye penewant check of the 5- hinges eyes and pins (dock shank Touses and main hinges) x | x | oxe | xs 2) Inspection of welds 6: hydraulic power station for ©) se BIS handling hydeauic Ry arnicienterequtiny——~€7 maybecneaoa anne aeronbond Fp anc pera Fi a damian Z Bureau Veritas INSPECTIONS AT WORKS [7] FIRE BULKHEADING € Inspections and tests Design aspects [aspen | Checking | Roonng ~ om Inder | Maras | “dering | ater | ce vst Remarks © o | wo joys @ o © [Fire buttheading and T (© Forthe fre bulkbeadings the 1 [fire doors to} xe | xe | xe homologation procedures applicable see also QI and Q2 ible Ganind ti ay haniawiyamies F aeuedaemmapeerne Fr a demas ae Durcau Veritas INSPECTIONS AT WORKS z ite fighting systems and fire detection systems > Inspections and ets en Jmspectins tpecion| caching | Reming ~ om incr ‘ovine | ater | oe cs eras jomeiion| tos © 6) © D [Fire pomps and ter 2 xr | xp Xe 1 prime movers xn (0) onelecrical © [Fire hydrans, novtes, 1 (0) homologation procedure is applicable 2 | acessories. [leh presare CO, re z 3 | smothering systems ex bates 2 | xe xr | xsh | xe | seo | suibton systems (0) seeG26et27 1 [Halon storage and distribution | 2 © sees 4 [ystems fF bed powder Gre extinguishing] 7 Tews 5 festem 0 [Fined foam fice extinguisher [2 xr Xe 6 |ystem © Foam concentrates 1 (0) concerns prot nd chemical tankers BY baacasornpiaad———_€7 may Ramana eronbad 7 gp Teena Bureau Veritas INSPECTIONS AT WORKS Fire fighting systems and fire detection systems inspens nd ess wee [nce mtn] ch, | ai ~ te TE |e Ee [| Oe | Me tts Saati] Se o of} o fe"s"| S| 6 6 > fWaerpray nents 7 Fe | aga poss ; lw pers, aa > [seine resp D [engi 1 1 toncgann oe ap ERE ® D [Race acai saee | 1 w | x | ox foun 1 ee see Ca aaa? aT [perce veritas INSPECTIONS AT WORKS i Main .C.enginesand their awsliaies E oui | gti tion] atin | ae . om TE |e ee] | Mt temas enti | o o fo fore") S| os © z 7 [| son] ae Yan ae ; rent pee wie 2) Sa fps compodag 0 Scorers, P: brake power in KW the surveyor (cover, piston, npr Soma al i syn ren SSE aston ce perens aout ty os ss ra Rouen ier re a xem itotap etme chemist aren ci mucus poe lor «Roane sa CREST on 1 on ah tap xo | x0 | xo 2) bit pan itn pai oP we) }(3) magnetic particle test and / or dye 2- coupling bolts for 1 x xor (1) if D> 400 — x | ox (2) ecg ont on eaing (cmt ontning ne esc J cme x x 6) hpieret nd er pc sekcbei unantg INSPECTIONS AT WORKS u Bureau Veritas Main LC-engines and thee ausisies : Tai ae . i ee Statin] Se ° o fo Pars] S| © 6 5 [cata ore "lest 1) whee Doo - ron x x © Shee > ett nt meme sa crate x x () whe tn r-roe x x | ox (ate pit ca wer Di eee ee coe wea nn ie nn sermon ar ri Posie to frances p-cynse x x |x forse pe we 30 0 inde eae en ec sétermpestaneenehee \ Be - cyte x x 0) ort pt BD TR in 7 Se Seeemaaze Bureau Veritas INSPECTIONS AT WORKS: 12 Main LC. engines nd their unarin : Tat net owe [gsi ngs] cone | aa « en TEE |aanan ae[uae | Ose | ste nl tin| ° o fo Pera] o | 6 6 E [Seager ronan *[isath sevens Trankeases, frames s Q Renee ee 10° Crmkcases xP x [ox] xsh {03 sets ting comermplae ‘gota ices 1. Bedplaes x |x fox | xs { ca for welded consmction (pee es Sorcerer oer on pe Pre terete aes ( panes rt : ©) we so sane rare 12 Tee rods x x ch threaded portion tice the lenght of see ion se pa, xa | xo (a imp pe Rtn ms xe (9 teem ahmed nthe 1: Anand vn es xa | x0 (2) eo ih oon com crochet 9 eae INSPECTIONS AT WORKS ie Bureau Veritas Main LC. engines and their auxiliaries E Inspections and ts . \ Deion nections [prion | Chching | Reming sbrctonJompeton | es OO) @ }o fae") oe ° 6 E [EC engines for propulsion 1 Jeon 16-camsbafts x | x (9) check ofthe ardess ater case- hardening 17 wees or gears for driving x x (1) forte pars when D>400 camshafts (8) liquid penevant or magnetic parle testwbere D>400 18-chains for diving camshats x (4) examination ater ess 19: fel pumes| x | ox 20- ols and studs fo exlinder x x (1) where D>300 covers, main earings, heads and (3) heze D>200 lau penetra or ends of comecting rds, ross, rrugotic paris ts for ols and ads. Suds rerevng adres uctosting toad 21-exhast main and steeer xo | xn (4) for tbe cooing jacket (water chambers) Ry hamiceweraniaea)—_€7 an wensionwacywacsted F daigc mers TaOPT Bureau Veritas INSPECTIONS AT WORKS i Main LC. engines and their auxiliaries E Tnspections and tests Deen Jmcctonsampcion | chectng | — Reming . se ‘seer | sire |ang | ater |e mr emacs | eatin omen | © w fo Pore) ° © E |G. engines for propulsion 1 Jlcomra) 22 seavenging main x (4) examination fer running load test 23 piping an piping acessories (0) #6625 BT yinicciwauaiay 6) aay hecradeuaheadormioat WT Sec aan mer 7a nanena E Bureau Veritas INSPECTIONS AT WORKS Main LC. engines and their auxiliaries E Inspections and tests Desen nepectns | especie Ronni . = face | Matera | “doing | ater tet Remarks o ®}o};e ,o ° © E | Cooling pumps, lubricating ot | 3 xh Xe | (under oad, on board; general 2 | pumps, independent of EI ‘examination and their prime movers xh (0) nom electrical E | Heat exchangers (ubricating oi] 2 x | x |oxr | xe x | C1) fortubes and plates: chemical analysis 3 Jor fresh water coolers, fuel supplied by the manufacturer eaters) [Exhaust gusbollers (0) seas 4 E | Starting air receivers of EL 2 x | x | oxe | xns x | @ seec3o 5 (4) including sting of safety devices, if any (5) ding sea tals of the ship (eapacity cheek) Bi iiaaca aurea) €) ey wcaresecnaeyaaoonies Feeley are Tm aaa eT Bureau Veritas INSPECTIONS AT WORKS Mail LC. engines and their aw Inspections and tests \ sien impaction [napection | Checking | Ronnie ~ em Index | Matera "ding | ater - tot Remarks fabrication fcmpleion | tse © a fa Peo ® © z x Xb X |) sneloding cookers any (5) under fad on board (eapacity) primes movers xh (0) 00 electrical £ | Turning gears of EL 3 x |) onboard E [Scavenging and supercharging | 1 x xh x (2) shaft and rotor where D>300 8 |compressors or blowers (4) dynamic balancing of rotors. 208 overspeed (overspeed test may be suppresed if a comprehensive non esiroctive testing i performed on the rotor Hydraulic testing ofthe water chambers, (6) these tets wl be caried out during bench ils ofthe engine on which these equipment ae mounted E | Regulation and safety devices | 2 xa xDe | (3) and (5): during running load tests 9 WY prac ioroeapale 7 ang oltancenna pea 7 andi oa er INSPECTIONS AT WORKS i Bureau Veritas Main turbines, main boilers and their auxiliaries F Tnspections and tests Desge nspections inspection | checking | Running ~ ew Index| Materials | dering | aher or et Remarts faction competion | sets o o | o fare a o o F | Propulsion steam torbines 2 x [ox | xr x Xe orncng tog acearrason | 1 _Bnerators and their accessories or as turbines, inspections to be ‘determined with the manufacturer A) overspeed test, 1 stor x | x x | xns (3) examination of the fixed blades 2 rotor x | x x xs (2) examination of bades (@) balancing, and overspeed a 205% 3- discs x blades x (4) magnetic patcles test, or equivalent 5- nozzle boxes x | x Xh 6- bearings x (4) contact on bearings tobe checked trust block x x (4) adjntement tobe checked B- valves x x xb xe [Uy seG2r 9- piping between differens x x Xb (1) 50626 trodes 10. regulation and safety devices x x x | (6) inclaing overspeed tipping device est 11- flexible couplings x | x (2) liquid penetrant est (or egivalen) 12: measuring instruments 1 Xe Xe (0) such as pressure gauges. thermo trcter, speed indicators vibration | detectors | {0 sear ceattraion tobe cheat | Ki bint aanind Ci mynandonnieycomted FSR ere Tae | INSPECTIONS AT WORKS i Bureau Veritas Main turbines, main boilers and their auxiliaries F Inspections and tests Design specton [tmpectin | Checking | Running w tem Inder | Materials doving | ater o ‘or Remarks section [completion | st co} o }o}ea le @ ° © F [Manoeuvring and distribution | 2 x | x | xr | xe Xe | (i forcasng only 2 |valves of FY F [Main condensers 2 xr | xh x | 6) during sca wats 3 (4) including chemical analysis tubes x xh (4) or examination by an approved procedure 2-tubes plates x | x water boxes and shells x Fa) Turning gears of FL s x |S) onboaa F [Circulating pumps 3 xh % |S) under load on board general examination 5 |and their rime movers xh (0) nom electical | [Leabricating ot pumps 3 (0) see E? 6 |and their Prime movers F [Extraction pumps 3 (0) we FS 7 Jand their rime movers (Be banuicieriorapnainy ema iecanasuar at yderambeats FT Sgt ana 7 nanan INSPECTIONS AT WORKS is Bureau Veritas Main turbines, main boilers and their auxiliaries aspects ad ese Desen cone | Raine ” ea eae "| “a ents © o fo Pars] S| o © aires 7 Xe] TX Or rac pp ad rn : ocaa pne noes (5) on out gee eraninaton Tabrcating ol coers ome ° & [Dein coters 2 |x fxs | xe [xn | x | antseameags were 927 o Pva1s00 0 (Dean ony ante oped ya err deere bye sel works if re 2 x [xe [oxen | x | f@msmeraccasoies (5) on Dm td x | ox | xe | xs x x | Xe (0) if fxming owing Fame. yin and x |x fxr | xs (4 for indice bois only intemal st) veri bes) +t sa and x xr =n 5 supereners hare x fox | ox | xe Ses x x] xt (2) i forming o weking REG eRe aa Fae TE Bureau Veritas INSPECTIONS AT WORKS 20. Main turbines, main boilers and their auxiliaries F Tespctons and ts . , a mets econ | Cheng] Romine trate open | see o ofa fora") 7 |» ry F |Win aes ont) h coment x xr | xen 7-sienentes x xe} xen (0 forbes and headers of steambeaes ony valves x xr fxn (© tnd eset e027 Osa valves 2 | x xe] xh | xe | Voeca 8 S28) eon prosoy (3) seling and accusation ets 1 mane grand x x fox | x ger Coa ans 1) fe press esl iP part tcalon sora © forse Pr ofr se ies Meant busing sytem x x ]oxm |x |) Ca boua dung sexs 12 ee intr pte 1 xe | xne | xe te {Soret el iets ‘ Xne [Xe | $0@ wrerecsary 15 ent eel ina cab dog seis Temonrtes 3 xe_| xe [a anuncytote cect eng and aserbing aT » | Ped pumps of 1 ‘cali paar) esa a fox] ox [xe] xn x | |e Sapa tere sembing trating eno fe) xn (serene ere movers (0) note a saad INSPECTIONS AT WORKS 21 Main turbines, main boilers and their auxiliaries Tnspeetions and tests Design Inspections | inspection | Checking | Running " em index | Materials | during | ster or et Remarks fabrication completion | ets © @ | om] @ @ w 6 © F [Peed water heaters 2 x [xs [xr Xb x | (© ifP>7 or PVz1s00 B (A) ceasing and tubes; ean be replaced by & works certificate if PIO (5) on board, during sea trials F | Forced circulation pumps. 2 x x Xr Xh x (() casing and assembling bolts 14] P11 and their (5) om board during boiler tess prime movers xh (0) non eletrical F | Forced draught fans 3 X |S) on board during boiler tess 15 and their prime movers Xh (0) non electrical F [Burning units of F11 X | (5) under load on board, general 6 ‘examination 1- pumps Xh 2- eaters 2 Xr xh 3- fiers Xhe | valves, pipes-safety devices x Xh Xe | () seeG 26 andG 27 5- prime movers of 1 Xh (©) non electrical 6- pressure gauges 3 Xe Xe | (4) calibration 1 be checked 1 bya wt (resale (2) way bcd oae anlrontont———F: Sning farce pra | ‘From cnet pee ” oe conn ihe reviewed ins INSPECTIONS AT WORKS 2 Auviliary machinery G Inspections and tests Design [inspections | espection | Checking | Running " term index | Materials) “daring | "af o tet Remarks {abriaton [completion | o @ | a] @ @ 6 6 G | Semi elastic couplings, and 1 |elutches: propulsive plant and auxiliary plant 2 (0) Homologation procedure is applicable ‘when torgue <1 kNm ‘Torque> 1 kNm x x Xr Xh x Torques 1 kNm x (1) shafts and flanges (4) for hydraulic or pneumatic equipment G | Reduction gears, reverse 2 | reduction gears, and multipliers 1- propulsive plant 2 > 300 kw x x xr Xs x (4) frames, shafts, pinions and wheels Pe 300 kw x (2) balancing of pinions and wheels according tothe Rules 2- auxiliary plant 2 (3) pars listed in (1) herebefore P> 150 kw x x xr Xs x (4) tooth contact onthe pinion wheel io be | checked for each pinion; contact on Ps 150 kw x bearing tobe examined (5) under load on boards for any type of propulsive plant, examination of tooth ‘contact of pions and wheels. ‘Where P2 3700 kW, checking ofthe teeth during sea trials We fyi or equal ‘C= may ecaredouta ihe yucronboatt ‘FY Ohne Gara ene 1 pence warp INSPECTIONS AT WORKS B Bureau Veritas Auxiliary machinery inspections and tests Deien Jmpecion | spection| Checking | Running ” em finder | Materia “dovieg | afer | or ‘eet Remarks abeicton completion} tts © o |o}o |} oe @ o © G | Main thrust blocks 2 x |x | xr | xs X |G) forframe only 3 (2) if welded element (@) examination afte running test (5) under load on board G | Tirst shafts, ftermediate 4 |stats, shaft couplings and 2 x | x | oxe | xs (2) if welded or shrank elements rigid shaft coupllngs (@)- on board contacto bearing tobe (aismountable type). cxamined Dechecking of iting [Cardan shafts anges, crosses, sats, yokes) x xr | Xs G |Propetter shans 5 | -shafs and couplings Manges | 2 x | x | xe | xs (4) aligamen be checked onboard 2 ners 2 x ] x | xe | xe (2) fiting and joining on the shaft 3: sergland 2 xe X | (3) during sea rials. te lubricant consumption is tobe recorded G | Shaft bearings 3 x | cheskng of the alignment on board 6 6 Jeoupting bottsforG1,62,64] 2 x | x | xe x (2) only for special bolts. for example 7 land G5 expansion pe (4) checking offing on board Ri tenirericraawen __¢1 may bansiowaiendorminn) 7 Seg tonennc Fi ea ino INSPECTIONS AT WORKS 24 Auxiliary machinery G Inspections and tests Design inpecon [inspection | Caching | Ronning ~ om Index | Materials | “doing | ater | or at Racks bration completion | tes o o | ao} oe |e @ ° © G | Sterm tubes z x hr ] (©) for O60 mm, the bomologation 8 procedure applicable (1) Bxcepr oainay ast ron (4) a: witerighiness (Forcast tel or cast ‘rom tubes). | pchecking of fiting onboard |Propeters z XR xe Xe eepropees wih non usa design ee 9 seer iy seed ee ate (ABO selene ie oe pen mate {OLLiV ofthe mea ress eparca fustobi cry nested on he Jee (drawings submits fr soxiey s review 2) nly orb up opel a Coat of te propellers staf cane be checked (6) foecoetolble pick propels [Studs for built up propels | 2 x xr x (2) iid pean (Controllable pitch propellers | 2 ith hydraulle actuator a servo cylinders, servo cylinder x xe | xn casing, coupling bolts b- pumps xh (0) 26 26and G27 el pipes Xhe (4) icine seting of safety valves ‘Ry asicesiorapineny——€7 maybeearalaa we rwderanieat FY GSS REG re 7 Sa cecnet a peree INSPECTIONS AT WORKS 25 Auxiliary machinery G Inspections and tests Design inpecon | epeton | Checking | Ranning ~ em face | Materials ["dring | ater oe ot Remarks treatin |empetion| sete o ® | ole] oe @ 6 o [Turbines driving electric 2 [xo [oor [xr | xo XE__| (©) not intended for propulsion purposes 10 generator (@) overspeed tripping device sing (5) under toad on board 1 relate to gas turbines 1 ator x | oo xohs (2) for generating sets with P2440 kW 2- rotor xo xos (0) for generating sets with P2150 kW= shaft only (4) balancing and overspeed at 15% 3+ nozzles boxes and combustion xo | o xoh (0 for generating sets with P2150 kw chambers 4- bearings xo (4) contact on bearings tobe checked 5- dust block x x (4) adjusterent tobe checked 6- intermediate gears ° ar | as (1,@) and (4) for generating sets with Pada kw 7- regulation and sfery devices xo | xo xte | (5) including overspeed tipping test s- manoeuvring valves and other xo xo | xon xoe | (1) weG27 waves >. tbricatng oil pumps xon xne Hibeeicemand —_€i aymanalaraiayeiwate —F Gaipeoteanaeaig ree Te damanes oaIS INSPECTIONS AT WORKS 26 Auxiliary machinery G Tnspections and tests Design impecion [inspection | Checking | Running s tem Inge | savers | “deine | ater | or ot Remarks ‘aoricato completion) tts o ea fa Pele @ ° © G [Turbines driving electric 10 | generator (cont) 10 lubseating oi cooler xah 11 fuel pumps on ae 12- intermediate coolers oh | tnternat combustion engines (0) televan provisions ate those of 1 |ariving electri generators G | Labeicating of pumps 3 xh x | ©) forthe propulsive plant 12 [and their (6) wnder load on bowd general rime movers xh (0) nom electrical | G |startingairreceiversotG in | 2 x | ox | ox | xns ©) se2G30 B (4) inclading calibration of safer devices & eregiaie) 1 may canon aes 7 tig tec Tea ana INSPECTIONS AT WORKS 2 Bureau Veritas Auxiliary machinery 6 Tnspections and tests Design mpecon | napecton | Checking | Running ” ten ‘aer | Materials "during | ater | or ‘er Remarts bration [completion | tte O ®}o@}e |e @ o © G [Aircompresors for ing ot | 2 xe X | @) togetier whith coolers ifany 14|G 13 and their (5) under load on board: general examination rime movers xh (0) nom electrical G |Auxitiary boters 2 x | ox | xns x (0) P design pressure in bar 15 Ye volume of water and team in dn Inspections are cared ou oaly 00 boilers which are parc of the ship's ‘essential services andor located in machinery spaces where: P>3.5 or PV21500 (doesnot prelude the pplication of national regulations if ay) (5) on board 1. boilers and drums x | x | ox | xen (@) if forming or welding operations 2- tubes x x xh 3- furnaces (cylindrical and x | ox | ox | xsh (4) for eplindicl boilers ony internal est) ‘verical boles for instance) 4-serew says and longitudinal x xt stays 5- valves and miscellaneous x xe | xh (0) «e627 (0) se 27 6- safety valves x xe | Xb Xe 4) capacity test on prototype (5) selling and accumlation cet a ee 57 omdeene us Bureau Veritas INSPECTIONS AT WORKS Es Auxiliary machinery G Tnspeetions and tests Design inpecton Inapecton | Checking | Romning 6 em ten | starts | dering | ater | or et Remaris treatin competion | tes o o fo Pa he @ o © G | Auniliary boilers (cont'd) 1s 7. level indicators ' Xre Xe s- pressure gauges and 3 Xe Xe | (@ calteaiono be checked thermometers 6G |Barning units for G 18 (0) ee F 16 16 G [Auxiliary condensers 3 Xie % | Gy wader Toad on Hoard general examina 19 ana (1) atestation supplied by the thee tubes x xh smanufsetwrer (4) erexamination with an approved procedure G [Ausilary units of G17 3 % | @ wre oad on board: general examination 8 | pumps Xhe 2. irejectors x |) onboard 5: valves and miscellaneous Xhe 4. prime movers of 1 Xhe (0) nom electrical 6 | Peed pumps of G15 3 Xhe X | (5) under oad onboard: general 19 |and their ‘examination rime movers xhe (@) non electrical 1B yc wierognnion) ——€7 maybecriteateyaercntans—~FY Oaing a an Ti amd INSPECTIONS AT WORKS B Bureau Veritas Auxiliary machinery G Inspections and tests Design inspections | mapection | Caching ~ fedex | Marts | "during | afer | or Remarks breton competion | sts o ® |} o}e Te @ o © G | Evaporators, fresh water 2 | (9) onboard: general examination 20] generators, their auxliarles and| acessories Aisillation bodies and heating xr | xh (a) ifP>7 or Pv2ts00 coils 2- pumps Xhe 3-firejectos| x |(5) onboard valves, accessories, safety Xhe devices G | Steam heated steam generators | 2 x | ox | oxr | xns xX | a) samecritera Pand PV as for G 15 a (1) eam be replaced where Pel? barby & ‘works anestation| (8) under load onboard G |Bitge pumps 3 xhe Xe | (S)oaboard: general examination 22 and their rime movers Khe (0) non electrical |Batast pumps 3 Xhe Xe | (5) onboard; general examination 23 and thelr prime movers Xhe (0) om electrical Bi hawks eran) ——_€7 wayiecaeonwaeyatwonband FY Oeaadihamiei pe is 7 aan Bureau Veritas INSPECTIONS AT WORKS 3» Auxiliary machinery 5 Tnspections and tests Design Inspections] specton | Checking | Running " em Tne | Materials | "during er Remarks fabicato compleon} tats © o }o pePe 4 o © 6G [Foe transfer pumps 3 Xhe Xe |) on board; general examination 24) and their Prime movers Xhe (©) non electrical G |Centeituga separator (oll ana | 3 xe | (5) running west, possibly with fel water 25 fuel) rmixtoe 1. fexibes hoses 1 xa (@ seeG 28 2- electrical equipment motor, (0) seek sitehboards, cables.) 3+ automation equipment x |@sen (5) checking ofthe following automatic functions when they are required by an automaton mark: level of sludge tank land overflow from th bow! (protection | and alarm) Hy yaaiiceai@qjiwimn)—__€1 may eommedouacyadoranbaat—~F Gating ances Re Ta INSPECTIONS AT WORKS EI Bureau Veritas Auxiliary machinery G Tnspections and tests Design inpecons | taspecton | Checking | Running ” em fader | Mater] "dortng | ater | oe tat Remarks breton} completion | tess o o |} oe Pe @ ° 6 G [Pipes piping (O) for cargo pipings of specialized ships soe 26) Pz presrue in bare Hue [tempera in °C - Class1 3 x x | xne (41) may be placed by a Works Cerificate -steam, thermal oll P>16 oF if diameter < 75mm, and thickness 300 ‘< 10mm (3) tests following section 15-8 of ules guid fet Poi6or TIs0 cher Mids noc toxic P>40 (ater, a, 38. 0il) of 0 2 Class 3 x x | xhe (1) may be replace by a Works Cetieate ‘team, thermal oll 7100 am (2) for diameter < 100 mm cenficate ‘issued by the manufacturer lass I 3 Xhe 6 | exible pipes and joints 1 x x | xsh (1) for metal elements 28 | Expansion joints (4) tice the service pressure G | Shipside vatvesand valveson | 2 x xa (and (1) ifiameter 2100 mam, 25 collision bulkhead G [Pressure vessels (@ inched i the felies covered by the 30 | not subject Names o high classification or concemed by a service temperature gases rotation where P>T or PV>1300 (doesnot Je: thickness of eylinscal sel in preclude the application of Nationat am Regulations if ny) for tating air P: design pressure in bar receivers and lied pas cargo tanks 7 design temperature in °C see also ES and HI vs volume in dm? BY meznicin @rapinny) ~~ may boca eraeeyctorcsbond Fs Sg of ung edema ee INSPECTIONS AT WORKS EN Bureau Veritas ith is ‘Auxiliary machinery G Taspections and tests Design| Inspection | Checking | Ransing m= Tae | atria er | oe et Remarks completion} rats o w | w a) @ ° © G [Pressure vests (contd) 30 Chass P>s0 2 x fox | oxr | xsn T5400 40 Class 11 is 100m H [Safety reli valves for cargo | 7 ¥ %r | xe Tay checking ofthe sting 16 [proces piping system Noe sce note ni 18 11 [Satey relict vatvesfor cargo [1 x [xs [xr | xe (a) Be approval ncades capacity et teins” {8} cheeky of he ste eluding ui Nowe sce notin 15 7 | Cargo process and containment| 1 ¥ xr ¥ % |) Tar some equipments th approval {6 [fetrumentation procedure suid be appease Kihainaeahn Ci aykaniavayambe! ¥ RaawarSESE Ae FTE ; INSPECTIONS AT WORKS x Bureau Veritas ‘Cargo handling and containment systems of liquefied gas carriers # T Tnspections and tests . ; Desen fwpectons apecton | Checking | Raman | breton te o @ | w fe @ ° o 1 [Inert gas generation systems vet 9 [Fire prevention materials and see 20| arrangements 4 seeD 21 {Fie ighting systems 1 [Gus detection system 1 x x 2 1 hamsicvoraaaiay —€7 way ncansoesn beysowcaband 7 Stinger ps Taare Bureau Veritas INSPECTIONS AT WORKS x Cargo handling and containment systems of oil / product or chemical tankers 1 Tnspeciions and tests Dasen Impetins[tnpecon | Checking | Reming w se Index | Mates "daring | sar o ‘et Remarks tbricaton competion | ste o a |} o}e | oe ® o © 1 [Stet or stainless steel plates x (a) sees tobe approved according NIIGO 1 and profiles for cargo tanks R301 DNC 1 [Lining or paintings internal to | 1 Xe (0) the homologation procedure is 2 |eargo tanks applicable 1 | Cargo pumps ( eH? 3 |and their [prime movers 1 | Gastight shaft bulked (©) sees 4 | penetration devices 1 [Fans for enclosed spaces ( seoH9 5 Jlocated within cargo area land their [prime movers 1 | Seamless tet or stainless tee! eH 6 |eargo pipes Hi binives(oasiad_€) mybanaioasianyavormtant ——F: Selgin ra Tes ean eae pea Bureau Veritas INSPECTIONS AT WORKS 0 Cargo handling and containment systems of oil / product or chemical tankers r Tnspections and tests Design Jmpecins | tpecon | Checking | Running s Kem ‘dex | Matis "dovine | aher | or ‘et Remar fabecaton [competion | tte © ® fo Pe hs @ ° o [omgitdinally welded stainless | (©) see steel cargo pipes T [Cargo pipe fitings err 8 1 [Expansion bellows and Mexible () see He 9 | cargo pipes 1 [arg valves (0) seeH Is 10 1 Safety reli valves for cargo eH 11 handling piping system 1 | Pressure /vacuum safety relief (0) see 7 12 [valves for cargo tanks 1 [Flame arresting devices 1 Xre 5 1 [Cargo handling and storage © sens 14 [system instrumentation Tae ta heianesiwome ? Eine aae Ta cane INSPECTIONS AT WORKS a Bureau Veritas Cargo handling and containment systems of oil / product or chemical tankers 1 Inspections and tots Daten Tmprtin | Checig w em er Tier | se emai omen) soe o @ o | @ o 1 [inert as generation systems Owet 15 1 ]Fic prevention materials and (© s2CansD 16 arrangements 1 [Fire ighting systems se CansD ” 1 | Gas detection systems (0) seet22 8 BT janis wanaad em Nancie aayeiormied Fi denies er 7 a a Bureau Veritas INSPECTIONS AT WORKS, a Fice fighting ships 3 Taspectons and tats Design inspections ]ipecon | checking | Roning ® a teat | striae] aorng” | ater” | or = Remar abrcaton| competion] see © © fo Porn) o ® © 7 [Fire pumps 7 | x xr | xP Xe 1 land their prime overs 2 | xe xh xe |) ronctecwcat 1 [re water main, ie foam 2 xh 2 | mai, water spray piping systems 73 Foam generation systems 2 xr Xe 7 | Water nd Foam monitors 7 x Xe 4 and their seatings 2 x 25 |Powder generations systems | 2 x xe 16 | Foam concentrates 1 1 | Water spray nozzles 1 Xe | (©) Homologaton prose applicable a Trae PE BUREAU VERITAS ELECTRICAL EQUIPMENT = Due othe reat vary of ect! euipment, thas not been posible to give herewith he esi ofthe inspection and testo wich these mae ae tobe sabrited, Forceraingven ype of equipment, pial pete kading oir approval havebeen insted: programmes forsochtype estar st up foreach eatgary of equipment {gether withthe requirements fo tet crying out the vay ofthe fype approvals ited to four yar, t may be renewed ater peilconsidenion by, BUREAU VERITAS 2 The amilares tobe considered as ese inthe following ales the ised hee Iubieting pumps salad freshwater pumps for engine cooing fan or forced deve to bilers Eenensercicalaing pumps * soering gears _extetion pumps [ge for controllable pitch propeller ‘acuum pups Sir compressors {uel pumps for main and sir boilers = punters fel pomps for main and airy engies Srinage pumps feed pumps fr main and airy bors = ballast pumps scavenging and super charging bo blowers {uel ater pars 1 fered eitltion pars + venilting fas fo mscinery rooms fre pape vidas + fire detection sytem ‘oming ear Inthe case ofnsalationso he granted anata notation, alte electrical equipment wed for these installs eo be considered as asuing an ese sevice; sich willbe the case fr example, of diving motors fo compesses of eigeratng pla contaced under special survey of yas pars for watertight Jos ship cased withthe 1/3 notation, of winches of ships cased with ALP, ALM, ALS notions. MM [BUREAU VERITAS reserves the ight ad tes uae 0 hs ist, whenever deemed necesary and more especial for ntalltions of peculiar type. [Noten the tables given hereafter : = Thhe mark A insribed inthe column 4 means that a delete strength testis toe carried out. + The mark oinseribed inthe column 4 means that insulation measurements are to be carried out. INSPECTIONS AT WORKS a Bureau Veritas 1 ‘ Electrical equipment K Tnspections and tests Design mpecton | Cheekng | Ronsing stem index | Materia mer | wt Remarks eompleton} sts o ® | ao i) @ ° o [Generators and motors for 2 x | x | xr | ao X | (©) lncuding excites orexciation unis 1 electric propulsion (0) shafts and stators (5) according to an approved program | Generators forthe general ‘Oy Tacoding excersorexTation wait 2 {network of the ship) 2 (1) shaft where P2 S00 kW x xr | ao X | (3) sncluding determination of temperature K | Emergency generators z ¥ x) ao | Oy incloding exces or xeon ans 3 (1) shaft where P2 500 kW (5) including determination of temperate [R[ Ward-Leonard ses z xr | ao X | for aniiaries consider as eat 4 (5) incloding deteminaton of temperature [Btectrc motors 2 xr | ao X | (©) arving amitiares considered as essential 5 with P>i KW. For electric motors with PeS0 KW, homologation procedure is spplicable within the seope of a BV ‘Moe I Survey (se 18-06 of Rules) (a) acconling to standard CEI 92301 (5) including determination of temperature iss for motos, which have not received ‘type aperoval RT yassceslorapiaeny)——€) mayieciredaa ve yeuaronbonl Fr Gta fchaniec apes Tana RE Bureau Veritas INSPECTIONS AT WORKS cn Electrical equipment K Inspections and teats Design inspections] tnpecon| Checking | Ronsing w em wae | Materials | “doring | ater | oe os Remarie fabrication completion] sts o ® | o}e yo 4 o 6 XK [Transformers 2 (0) concer 6 ower transformers feding essentials auxliares, or having a power 225KVA wansformers feeding normal or emergency lighting where P21 kVA with single phase system or P25 kVA with tee phase system + transformers for monitoring and control (a) according to standard CEI 92303 1+ power PSI00 kVA x so x |) tess tobe cated out on one transformer out ofS with a minimum of| Including determination of temperate rises for vansformers notype approved 2+ power P>100 kVA x Ao X | (5) including determination of temperature fises on one transformer ot ofS with ‘ini of one, for wansformer ot ‘ype approved K [Static convertors 2 x a X | (0) forauxiiares considered as essential 7 (a) according to standards CEI 92-401 and 92.308 (5) including determination of temperature res for converters notype approved Wi tynatctoiereganiewd Fi aeiagaancennespeae 7 dente Bureau Veritas INSPECTIONS AT WORKS 6 Electrical equipment K Tnspections and tests Design imspecons| tspection| checking | Munsing N em Tnder | Muerte |'dorig | ater” | or tot Remaris tabrieaton| completion} et 0 ® |afa lye @ o o 1 [Emergency batteries 3 x ° Xe | (0) forpassengers ships 3 (4) incase metalic easing i used K [Batiries forstarting purposes | 3 x ° Xe | (0) for propulsion engines, main and ° emergency generating Sts (4) imease metic casing i used [Regulation and control devices | 2 xr | a0 Ke 10 starters K [Electromagnetic couplings 2 xr | a0 Xe | (O) intended for propulsive or auxiary units u mentioned in K2 and K 3 K |Switchboards for electric 2 x | xr | ao X | (3) no loud running tests at works, efective 12 | propatsion ‘running tests on board Main and emergency 2 xr | a0 X | (S)no oad runing tests a works, effective 13 [switehboards ning tess on Board kK 2 x a0 Xe | Gand), inclding where jusifed 4 verification ofthe protection index 1P. ‘paint externa effecs Bo base maioreen songioe eienl ances z Doreen Veritas INSPECTIONS AT WORKS Electrical equipment K Tropes ad . . wate Pee |ec | tin | aie pe a en © ofo Pers) oS | o Oo i [ret breakers 7 ‘a scorn sandr) CETOIT 15|eaomina caret 250A xe |(0) Homotogaton pce eppiate > poninal urea 2 A x lio X | (8) ato la nerd on a) Gomme 7 $B Sng susan CET SE OTTA K cere 16 |1-nomina caret < 250 4 xe |( Homngntn pocdae i apie pon urea 250 A xia 3 _|{5) ato atone ad on boar Bitches dsconmetingSeviea| —T (a) sorting osm CET 17 [acomector ues ers (towns cave 2504 xe |( Honoogatn pedi apie oneal urea 20 A xia SS | (Sato oat one tond on tar) fine aod eco 7 (0) Hmslegton proce appa t Cae a aaa 1 xx T pas SE Tema POE 19 [res me ” opleae wihinihescopeor BY hopraee ee cats an ite! aaa trogen pees hesetiang (oth Senda CF1923 a Sees «a ioe Sp of ssa of conics hala ates tents Seong owe ls Taine aaia) + ayaa iTae Fae Rae aE | pureau Veritas INSPECTIONS AT WORKS w Electrical equipment K | Trspections and tests Design fmprcon | mpection| Checking | Running » Index| Matera | ring | ater | or tot Remarks striction completion} tee o @ | ao foe a o 6 K [Heaters electric 2 xr | a0 Xe | (0) For heating plans of liquid fel and for 20 vaterhester P> KO wats “se ES K [Fixed electric radiators z aoe @) Tor passenger sips a (@) acconding Yo 18.087 ofles K |Lighting fittings, uorescent | 2 xr | aoe (0)- for passengers ships 2 |tamps for liquefied gas carriers or tankers safety fitings, see K23 (3) and (4) tests tobe caried out on 1 ‘equipment ou of 100 ofeach type with ‘minimum ofS X | Safety electrical equipment 2 xr | a0 xe | (a) onbass of publications 79 of CEI (ee a 18.14 of Rules) (4) inching for fameproot material, the hydraulic es that may be made under the esponsibility ofthe manufacturer Ry ea Cr np Noncianaieyiwm mA F ecned arse a anata pr Bureau Veritas INSPECTIONS AT WORKS Specific equipment for Mobile Offshore units L w Ne o Trspections and tests Design Jnspecton | especton tnder | Matera | doing | ater tabrication | completion a |om)e }o ‘Checking | Running @ ° © Castings x |x | xr (©) expec eattaodes onnection and aiculaton parts (i) teste performed on specimens on he rougl cat pat these specimens st be Token into consideration before he sings operat ore tat ecesnry over hcknesses are el apa) (4) Sfrepa are to be done the pa procedure shall be submited fr Freliminry examination Self elevating and blocking ears (0) foriack op ries (0 foedtet teas OS) Rating uderatad Exceeding the nominal expec) 3h Sod unting ests may We ego a Some can Pressure tof cerain Stmponents(Deuble osey which mast GFan pont ye, nyaaule ek) requir before heya set up on fond Instrumentation for remote pauging of ballast systems (©) concerning the pars of the bls. Stems, pleas eer to the prescriptions iste io sige (4) presse est they are hydraic Stems; as foreccne stems refer (0 NS Dern ‘seoecreon ae serontons Bureau Veritas INSPECTIONS AT WORKS ED Specific equipment for Mobile Offshore units L Tnepections and tts eign npn] acon | chcng | Rensing abet [compton tts o a fo Peo") @ © 6 T. | Catoaieproteetion sens x xr | xe (Oi) and se “Corrosion protection 4 | with sacri anodes shor et insalatons, Recomended Practice Section 2-45" 1. Cathodic protectionsytems | 1 x x | te vais devices used must be of an 5 | with impressed currents, Approved ype erifct of approval) (4) checking that he system i comely st ‘peor puting ino operation (5) checking wit measure of be ptetels at puting int operation L [Ling apptiances x [ox [xe [x xe Jo seo ‘ L | Peibie pipe 1 fx |x [xe fx x —_ |) mechanical est on end Ftings 7 seutines (3) and) following en approved procedure, fers tase on NI364 DTO. “ailing ines Bo peaking) my onion adam Gating Sameer Fa STE Bureau Veritas = ADDITIONAL NOTATIONS M - Refrigerating plants: additional notations RMC, RMC-C, RMC-S, RMC-V N - Automation installations covered by additional notations (© - Installations covered by additional notations ALP, ALM, ALS P_- Installations covered by additional notation ACA Q - Installations covered by additional notation F R Installations covered by additional notation PDY SS - Installations covered by additional notations. COW, OIL POL-ENG, OIL POL-CARG, NLS POL T= Installations covered by additional notation IG Bureau Veritas INSPECTIONS AT WORKS }22 | mac te Te oon) oe fe ook] oe | oe vw rca eca es Sees arco, = —— wc | bate HESS casera —7 a paar ce (ore tiem ( checking t works of performance 8 Per — wc | be ™M | Brine and refrigerant pumps 2 Xe Xhe Xe | (a) genera arrangement and characteristics Soommeree am ee ce ar 3 Sonate Setters, Shae i . ate ‘ (5) determination of characteristics: Satigeteenceataneee INSPECTIONS AT WORKS S Bureau Veritas Refrigerating plants M Tnspections and vests . Design taspectons | ispection| Checking | Running em Inger | Matera dori | ater | or to Reacts tatrcaton| completion} tts o @}oaPoa |e | o © M |Condensors, heat exchangers, | 2 x (pressure et as per rules, ' evaporators and similar apparatuses of refrigerating planes 1 body x | x x (0) 22630 2 and covers x | x x (1) except for water side 3 «tubes x xh (1) chemical analysis supplied bythe rmanufactorer (4) individual hydraulic est on ‘examination by approved method (eddy current.) M [Pressure vessels of refrigerating) 2 x | x x xh (O)see630 6 | planes M [Refrigerant pipes 3 x x xh (0 G26 NH, classi 7 Freons: class I M | Accessories of refrigerant pipes] 3 x x xh (©) see G27 and G28 s M [Brine pipes 3 xe | Xhe 9 Bi hina aad Co ay nanianweyeiworbed ——_F Senate grea Fi an ean Bureau Veritas INSPECTIONS AT WORKS 3 Refrigerating plants M Tnspections and fests Design impectins | aspection| Checking | Ranning w tem fwaer | Mtrils|"ring | ater | or ‘ee emacs tbrcaton} completion} tote o ® }o ole o 6 o M [Accessories of brine pipes 3 he 10, M [Equipment of refrigerated 1 [container ships ic ducts and couplings 2 xe | xn xe circulating pumps 2 (0) seeM2 compressors 2 0) seeM I temperature monitoring system | 2 xe x |) forless important installations could be ‘made on board ee 21-644 of rales ) temperature sensors (detectors | X Ys) calibration and thermometer) M [Instrumentation (evel detector, 12 [pressure detector. forthe notation where the syimbol A is ven (see 23.78 per Rules) | X16) calibration Siac) ¢7 ew hanciaiaiayelwoied Fone awe ere Fo alan a praor = Bureau Veritas INSPECTIONS AT WORKS: ‘Automation Installations N Tepe nd es Dalen Imp ngs | Checking | Rane » ten Tat arse [hee | Me = ene ebron| onpen| ete o eo fo Pos) Fo |» © 1 [Machinery moniteringand [2 cs |x] scoring ou progam ob dened 1 alarm sysems ‘ih Burns Vera [Propaon plan remot contra 2 Xe % | scoring a progam ob dened 2 |agstem: Diesel nee, wih Buu rar rb, tc conirolble ites proper threes Suton shalt rakes 1 [Control and monitoring 2 xr |e wconing oa program be dined 3 [stems for seaitare Sin usa verar eaipment generating st Soters ai compresor ech eater generators 1 [Fire detection ystems 1 (©) bomalopaion pom aplabe eects, con aint Tea S ta aManEae Fen a Burean Veritas INSPECTIONS AT WORKS 3% Automation Installations N Inspections and tests Design ingen | pecton Rennie ~ ew fds | Matra | dering | ater tet Remarks breton | comple o ® |e Po se © © N [Sensors and control equipment,| 1 (0) homolopation procedure is opplicable 5 |and for monitoring devices such as: pressure or temperature sensors, shut-down] lectric valves, level sensors, automatic pressure, {temperature o level controllers... 1N |lotegratea Navigation System | 2 Xe | (@) the design andthe specification of the 6 |ara CNC notation applies) cquipment are submited tothe review fof Bureau Veritas (5) according NR 325 DNC 1 passkceiwamnaiea —€) may Wana ywdercalmad FT cael cia pee FT ea INSPECTIONS AT WORKS a Bureau Veritas Installations covered by additional notations ALP, ALM, ALS ° Taspections and tests Dasgr Jnspectons| tspecton | Checking | Runa w ‘em tndee | Matrate "during | afer | or ‘st Remarks abet | competion] sess © w | o Pore ® ° © Dervicks x WD seoNT ies (6) under load, on board 1 - masts and boom supports 2 x | x | xe (© seeB 17 2 derick booms 2 x | x | xe @)if welded element 3 - gooseneck 2 x xe Span rannions 2 x Rr 5 ropes for lifting, span and x x 4) breaking tests (See NI 188) sewing 6 loose ger (blocks, hooks, 2 x x x (@) for elements not complying with 8 shec Standard (@) if welded element (G) prot load tests (ece NI 184) 17 -winches 2 x (a) assessment by mean of type tests according to NT ISS (© | Cranes, hosts gantry crane and| x (0) oe NT | 2 |traveling crane (5) Snider lad, on board Tain suet 2 x | x | xe x 2 ropes for iting and luting x x (4) breaking tests (see NI 184) 3 hydraulic cylinders 2 x | x | oxe | xp (2) for welded elemens (4) see NE IBA 1B? banwicieerapaled and travelling crane cont d) 4 toose gear boeks, hooks, shackles.) 5 winches Observation Winches for O1 and 02 Bureau Veritas INSPECTIONS AT WORKS = Installations covered by additional notations ALP, ALM, ALS. ° Tnspections and test Design Inspection | Checking | Runnin Naren competion) tots “me © o | opal o ® “ © (© | Cranes, iss, gantry crane (0) see O1 (detick) @) see 01 (erick) Nota: for ALS mark (cases O1 and 02) the ‘working tests boatd are wo includ the testing of emergency systems [Nota oncerning ALM and ALS nctations, drawings are tobe reviewed, and inspections and texts listed in (1). (2) and {G) ato be carted out inthe case where the Bake does not operate directly ‘on the winch drum especially when litng of persons is foreseen Wy pa cm INSPECTIONS AT WORKS. 2 Bureau Veritas Installations covered by ACA notation P Tspetions and test Does mpection | open | Checking | Ramie » om inden |Matrats|aoreg | ther | oe Renate striction] compet] ts © @ fae |" | & ® © [1 Fized equipment (all 2 | x x (ay be replaced by a erie ose by 1 | guides, corner iting.) the manofatret 12-Mobite securing equipment | 1 x (3) and (4) special procedures see NL1B6 Reyna aman) 7 ey amaiaawenyaterenbat Feige Saag 7 eae AT Bureau Veritas INSPECTIONS AT WORKS [2] Installations covered by notation F @ [_tspections and tests Dien inspections | npn | Checking | Resing x om inden | atria “ring” |aner |“ oe Renate abraton | ompinn] tee © ® fw pe Poul a o © @ [Glass A,B, FH ballchesding [1 (©) Homologaion procedure ix appiable 7 Jbatkhend, clings decks) 102] class A,B, F, H doors vo [oxe fox [xr @ [Primary deck covering 1 {Dy Homologuon rocede fe aplcable 3 © |suetacetinings(orbutkheads | 1 (©) Homologaion procedure i applicable 4 Jand cling | Floor coverings 1 (©) Homologaion procedure i applicable 5 26 Fire dampers | xr | Xe [07] Fire windows | Xe @ [Penetrations of fire 5 (©) Homologation procedure aplcabe 5 |polkheading Ki pias ciianGinca eT ay Nonadaws aud Se Te aT INSPECTIONS AT WORKS a Bureau Veritas Installations covered by notation F @ Tnspections and tests Design Jmpecons | impecton| Checking | Ranning ® em Inder | Matas ring | ater | oe ‘co Remarts tabretinn|compleon| tess o o | o},e | o ® o © [Prefabricated fire resisting r x | x 9 |elements (sanitary blocks for Jexample) [Fire detection and alarm ' xr Xe | (9) accotding to an approved program 1 be 10 fsystems defined with Bureau Veritas Dy byimicieregivien) ~~? eaybecankdarmyadarmbes —— F Seclng ol dancers Tea tai Bureau Veritas INSPECTIONS AT WORKS oy Installations P.D-Y (dynamic positioning) R Tnspections and tests Design ispecons | apecton | Checking | Running N em finder | Mater "dori | after | or ‘et Remarks serene completion tes o @ } ao pe) eo @ ° © R (@) see NUISTDENDTO 1 | Controllers 2 x Xx | (and 5) according 1a program, tobe Te. 1 [Steel profiles for main structures T>0°C © | wse. [Steel profiles for main structures T<0°C - 1c A [Fite products for welding (welding consumables) ’ 3 1A [Cast tel stem and stern post 2 1c, 6 Bureau Veritas INSPECTION AT WORKS 76 HULL FITTINGS a w em Design | Certiteate enacts B | Steering gears 2 1G. [(O) type tests are not required 1 Rodder 2 16. 3B |- Rudderstock, udder sha, pines 2 |- Rudder blade 8 [Bower anchors 2 1c. 3 18 [chain cables (anchor) 3 1c. 4 2 1c. | Articolations and byetraull eyinders of spliting units INSPECTION AT WORKS 7 Bureau Veritas fighting ystems > x om sgn | certnete Remarks D [Fire pumps and thelr prime movers 3 [ WSC [00 tess on bourd/see also G11 1 D [Fire extinguishers v 1c 10 Bureau Veritas INSPECTION AT WORKS 7B ‘Main LC. engines and their auxiliaries E Design | certncte Remarks E [Internal combustion engines for propulsion 2 1c E | Starting al receivers of 1 @ Bureau Veritas INSPECTION AT WORKS 2 Auxiliary machinery G ~ om Desi | Certiteate emarts (G1 [Semi eastic couplings and catches 2 16 ‘G2 Reduction gears, reverse reduction gears, and multipliers of ET] 2 Tc GiIntermediate shafts 2 Te G3] Propeler shafts 2 T.C. | ema 5) 0 Be suppesea) G [Propellers T WS 9 Propellers with Cr2 134% 2 1c G [Internal combustion engines driving dleciricpenerators 11 |P brake power kW: N: rounds per minute (rpm) P/NZ0S 2 1c P/N

You might also like