You are on page 1of 1
‘TOR to conduct impact/research study on Six lane NHs in NHAI i) Road Surveys: The Agency shall conduct road surveys on the roads listed under Schedule of NH stretches to record geo-referenced video images of the road and collect supporting data as per following but not limited to: Accident data of last 5 years. AlLInventory of Project Highway, Adjacent Land use pattern. Volume count survey for Vulnerable Road users (VRUs- Pedestrians, Bicyclists, Motorists and ‘other non-motorised vehicles). e. Speed survey of vehicles. Locations of | authorised/unauthorised median cuts, access_ permissions, authorised /unauthorised truck & bus lay-byes. g. Existing Lighting/Illumination locations on project highway h. Pattern of Contraflow movement of traffic on project highway ii) Collection of background data and reports: ange The Agency shall work with NHAl to collect information on the NH development stage such as details of routine maintenance and plan of expansion/development with tentative timelines. The Agency shall also collect previously conducted/on-going (if any) Road Safety Audit reports and its compliances. iii) Analysis: Drawing on the background data & survey data, the Agency shall submit detailed analysis report along with its suggestive measures as per relevant IRC/MORTH Standards/Guidelines and Codal provisions. iv) Reporting and Workshop: The Agency shall prepare a draft report in accordance with Data Analysis. Subsequently, a workshop to present the draft report, findings and recommendations of all stretches to concerned PIU/RO officers/consultants/contractors and other stakeholders from Police dept., Transport dept., Local administration, Public representatives etc. Based on the feedback of all stakeholders; a final report shall be prepared. v) Blackspots and Accident spots Assessment: During the assessment of the stretches, the Agency shall give special emphasis on the blackspots and accident spots identified on the stretches and shall include their comments on the measures taken/proposed by NHAI with photographs to monitor effectiveness of remedial measures taken (if any) in their draft and final report. vi) Implementation support: The Agency shall provide implementation support to the PIUs in the form of assistance to understand the results, recommendations and next steps for implementation. vii) Training: The Agency shall give opportunity to NHAl officers, AE/IE & Contractor/Concessionaire Tepresentatives to participate in each stage of the project to gain valuable insights into the methodology and experience in its application. This may include participation in the road survey, coding & analysis activities and training sessions on the methodology adopted, use of software, if any to access interactive road safety reports. viti) Quality Assurance: Throughout the project, the Agency shall undertake quality assurance checks of background data, road survey data and road attribute coding data (if any) and technical analysis, in accordance with the IRC/MoRTH Standards/ Guidelines and Codal provisions. Lgors (H]

You might also like