You are on page 1of 4
+ | Zataiormons | (AFCORS Bs AFCONS INFRASTRUCTURE LIMITED a ey = r BSRDC Hiei neoaiees Arcone ifRasTRUCTURE CRTTED eas Pecan eee zee (Can omens | sa Ref: AFC/1331/SK/WO/QS/13-1 Date: 12/05/2022 To, GeoCon Infra Pvt. Ltd. 8-711, World Trade Tower, Sector-16, NOIDA, Uttar Pradesh, 201301 Mobile No: +91 9313404420 Email: Kind Attn: Mr. Pawan Tripathi, Sub: Amendment No.1 to work order issued for Design, Supply and Installation of RE Wall (Panel Facia) for “Mithapur Patna Project in Bihar” Reference: Our accepted Work Order no. AFC/1331/SK/WO/QS/13 dated 09.06.2021. (Our ongoing discussions regarding change in scope of works. Our Counteroffer for execution of A-2 side dated 07.04.2022. Your acceptance to our counteroffer vide mail dated 07.04.2022. Dear Sir, With reference to the above, we hereby amend the above-mentioned Work Order for clarity as follows- 4) Price Basis: The total revised price for current scope of works at A-2 side for the items of work with the tentative quantities given in the Priced Bill of Quantities (Annexure No.1) enclosed at accepted rates indicated therein for the subject scope of work at A-2 side defined in this subcontract is as under, INR 38,14,650/- (Rupees Thirty-Eight Lakhs Fourteen Thousand Six Hundred and Fifty Only) ‘The Subcontractor shall be deemed to have satisfied itself as to the correctness and sufficiency of the Total Price, which shall cover all its obligations under the Subcontract. ‘The rates as per BOQ in Annexure 1 are considering the duration for execution of A2 Side as 3 Months with effect from 01/10/2022. These rates shall be firm and binding till satisfactory completion of the total awarded work and certification by the Contractor / Client. No price escalation is allowed for the entire duration of 3 Months a a, . ———_—_—————— e+ Afons Howse, 16, Sha Industrat Bate, Vera 0 Bea Bi Pond Boney Vere: Rend. OMe: Afcons Howse 16. S122 6719 1000 7 2673 0082 Fax: +91-22-2673 OOM / 2673 0026 wow a Desai Road, Arad Nagar, P.o, Pest Box No. 11978, Andberp iy, Mp! - 400.053 11) Contract Data: = clause CINo — (fromGeneral PAGE DeTaILs Conditions) | ‘The Subcontract Order will be deemed effective from the date of nate | Mectve Date of the Work order issued by the Contractor or date of confirmation ‘Subcontract from Project Team for commencing the stated works whichever | isla. . Execution | 2.1 (h) | Schedule / Work 2 | Program: — (Key Milestone Dates) _ Overall Completion Period is Three months from 01/10/2022. 10 | Uquidated 6 _ -Not Applicable- Damages | ‘a Defects ability | 5 | Sty months ( Years) commencing from the date of Provisional | Period Certificate (the “Defect Liability Period”) by the Client. | Performance — y or ot a 16 bank Guarantee 8 Not Applicable- | (PBG) | Ja. Noadvance payments. | |b. 40% payment against supply of moulds, design approval & | casting of Panel . 35% progressive payment against supply of Geogrid as per | construction schedule and bill of material agreed jointly. | 31 press ot 16 | d. 25% progressive payment against installation of Re-Panel_ | | Payment | | | e. 5% Retention Money shall be withheld from each RA bill Subject to maximum 2.5% (Two point Five) of Contract Value. | | |f. All the payments other than Retention Money shall be | released within 30 days from bill certification and on | submission of documents as mentioned in clause pertaining | to Taxes and Duties. | Retention Money shall be released on completion of Defect Liability Period. It shall be replaced by BG from Nationalized bank after completion of work. Equipment Mobilization as per Project requirement from time to time to complete the work in time. You will deploy F15 Crane only for this Work. Hydra is not allowed at site. Manpower Mobilization as per Project requirement from time to time CAR Policy including 13 Resource 7 Deployment: a Party Liability cover shall be taken by the Contractor. Deductibles of CAR Policy shall be borne | insurance by the Subcontractor. | d. Other conditions as per clause 39 in of Annexure 2: General | Conditions of Subcontract. 39 Page 2 of 3 (AFECONS) | a= Except for the above al other terms & conditions of WO no. AFC/1331/Sk/wo fAS/tS-aatew08.d6 302E— shall remain unchanged = Kindly acknowledge receipt of this amendment & return to us one copy duly signed as a token of your acceptance & email us scanned copy of the same for our record. Encl: Annexure 1- Revised BOQ ‘Thanking you, Yours faithfully, For AFCONS INFRASTRUCTURE LTD bi lbn — (Project Manager) Enclosures ~ Annexures As stated above Received and Ack M/s. GeoCon Infra Pvt=tte (Signature, name and Office Seal) Afcons infrastructure Limited Construction of Elevated /at Grade Road (Length: 8.86 Kt) along Eastern side of Patna - Gaya Rallway Line from Mithapur to Ram Govind ‘Singh Mahull Halt at Patna inthe State of Bihar on EPC Mode WO ref No. AFC/1334/SK/WO/OS/13-1 Quantities (B00) - A2 Item Description No. si vom} —aty Amount (Rs) | ‘A |RE Wall Construction - Design, Supply, Supervision, Casting &| Installation of Panel (Design, drawing, method statement, approval of drawings, supplying] lof RE Material, supeuision for construction of RE wall etc all complete| lat al heights as per specification and as directed by Engineer-in \charge. Including Construction of Reinforced Earth Wall Casting of Panel {tansportation, installation of panels, fixing of geogrid & RE| laccessories, supevision ete all complete as per specification and as| \cirected by Engineer.in-charge. The rate also include the cost of| |manpower, providing F-15 Crane, Trailer, other equipment, tools &| tackles, cost of fuel, maintenance and operator, cost of wooden) ‘lamps & wadges etc complete. som | 3211 3150] 3814650 TOTAL 2211 i 38,14,650 ‘Average rate per Sam of Panel Facia 3,150 [Rupees Thirty-Eight Lakhs Fourteen Thousand Six Hundred and Fifty Only Note ‘© Above quantities are purely tentative and may vary to any extent. Subcontractor is not entitled to claim any extra financial implication ‘due to change in quantities. Payment shall be made on the basis of actual quantity executed multiplying by the above rates. Structure- wise quantity shall be executed as per Client’ priority. © GST shall be payble Extra Page ot:

You might also like